Elliot Mainzer, BPA Ken Dragoon, NWPCC NW Wind Integration Forum SC Meeting June 6, 2011.

Slides:



Advertisements
Similar presentations
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Advertisements

Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
Resource Adequacy in PJM
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Oregon Climate Change Regulatory Activities and Policy Initiatives Bill Drumheller -- Oregon Department of Energy University of Oregon School of Law Climate.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Introduction to Bonneville Power Administration
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
1 The Northwest Wind Integration Action Plan Status Update December 14, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Northwest Power and Conservation Council The Northwest Forecast – Energy Efficiency Dominates Resource Development Tom Eckman Manager, Conservation Resources.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Northwest Power and Conservation Council The Role of Energy Efficiency in the Northwest Power and Conservation Plan Tom Eckman Manager, Conservation Resources.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Connecticut Department of Energy and Environmental Protection March 24, 2016 Presentation to the Energy & Technology Committee Informational Forum on Adequacy.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
Northwest Wind Integration Forum Technical Work Group PSE Wind Activities Joe Hoerner October 29, 2009.
Overview Market Opportunities Market Challenges
Integrated Resource Plan 2016
2017 Integrated Resource Plan
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
Key Findings and Resource Strategy
Forecasting and Operations CAISO Case
Pacific Northwest Power System and Wind Power Development
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Elliot Mainzer, BPA Ken Dragoon, NWPCC NW Wind Integration Forum SC Meeting June 6, 2011

1. Review the fundamentals concerning our current wind fleet and the regulatory demand for renewables by Explain the three interrelated challenges of balancing, oversupply, and flexibility adequacy in the context of the region’s broader load/resource balance. 3. Review the multiple regional activities that address these challenges and for which additional solutions may be available over time. 4. Consider the role of additional transmission in the solution set. 2

3 State Renewable Standards Montana 5% for 2008 ‐ % for 2010 – % for 2015 and beyond Washington 3% by % by % for 2020 and beyond Oregon 5% by % by % by % for 2025 and beyond California 20% by % by % by 2020

4 \\nas1\Power\KD\Wind Integration Forum\Steering Committee\Mtg \[Regional Wind Breakdown.xlsm]Breakdown Resource by Location: ID: 471 MW MT: 378 MW OR: 2,595 MW WA: 2,699 MW WY: 135 MW (Contracted to PNW)

5 Wind Fleet Average Capacity Factor by Calendar Year %33.1%28.8%27.1% Jan FebMarAprMayJunJulAugSepOctNovDec Wind Fleet Average Capacity Factor by Calendar Year %33.1%28.8%27.1%

Economic Benefits: – $30 to $60 million annual tax revenues – $12 to $30 million annual royalty payments – 350 to 650 new permanent jobs – Average of ~300 temporary construction jobs each year – $12 billion capital investment Environmental Benefits: – CO 2 emissions reduced nearly 30 million tons 2011 reduction equivalent to removing 1 million cars. – Nitrogen oxide emissions reduced 450 tons 6 National Renewable Energy Laboratory. Jobs and Economic Development Impact (JEDI) Wind Model. July, Available from: and Costanti, Mike and Beltrone, Peggy. US Department of Energy and National Renewable Energy Laboratory. Wind Energy Guide for County Commissioners. November, Available from: U.S. Environmental Protection Agency (EPA). eGRID2010 Version 1.0 Year 2007 GHG Annual Output Emission Rates. Q:\KD\Wind Integration Forum\Steering Committee\Mtg \WInd Additions and Econ Impacts by Year in PNW (2).xlsx

 Utility procurement costs and associated rate impacts.  Wind integration charges and balancing costs.  Increasing wind generation lowering wholesale energy prices. ◦ Lower prices benefit short buyers, hurt long sellers ◦ Council analysis suggests RPS resources reduce annual average wholesale market prices by 4-8%, as much as 20% during the spring.  Possible increased wear and tear on balancing units, especially hydro.  A better understanding of these impacts requires additional information and analysis. 7

8 Wind Resources to 2020 Based on BPA’s wind interconnection queue and work done by E3 PNW and CA RPS targets would require ~10,000 MW of installed NW wind by Nearly 6,000 MW currently operating or under construction. At least 14,400 MW of supply between existing projects and interconnection requests. Significant excess supply relative to 2020 regulatory demand. BPA has offered ~ 9,300 MW of transmission service to wind projects.

9 Cascades Crossing Gateway S Hem-Board Hem-Capt J Can- N CA WOMR MATL JDF 1 NW->BC Northern Lights SWIP S I-5 CF-LM WW-McN MT-NW Upgrade WCC SWIP N MSTI Chinook Gateway W

LOLP (%)Winter CapWinter EngSummer CapSummer Eng New Base Resource Adequacy Forum Findings System is expected to have sufficient energy and peaking capability to meet demands through 2015 (existing resources, projected energy efficiency). System has moved from being primarily energy constrained to about equally constrained by energy and peaking capability. Adequacy Standard = 5% (one in twenty) 2015 analysis of existing generation, additional conservation per Council Sixth Power Plan.

May 24, Attendant Energy Shortage in Winter Months.

12 Looking Forward Sixth Plan Resource Portfolio* * Expected Value Build Out. Actual build out schedule depends on future conditions Replacing ~2,000 MWa coal plant generation: Reduce exports (~50% of lost energy) Increase use of existing gas plants (~17%) Ramp up efficiency programs (~16%) Increase renewable energy (~1%) Build new gas generation (~18%) Coal Plant Replacement in Sixth Power Plan, Morlan, NPPC 6/2011

Provision of Balancing Services – How can we manage wind variability in a reliable, efficient manner while recognizing the limits on the region’s hydro flexibility? Oversupply – How can we reliably and equitably manage high hydro/high wind conditions? System Flexibility – How much do we have, how much will we need? 13

DSO 216 Curtailing transmission schedules 14

Improved wind forecasting and state awareness Intra-hour scheduling/ITAP/Dynamic Scheduling System BPA Committed Intra-hour Scheduling Pilot Iberdrola Self-Supply Pilot NW Power Pool Combined Reserve Task Force BPA/other purchase of third party supplied balancing reserves WSPP Ancillary Service Schedule Filing WECC Energy Imbalance Market (EIM) cost-benefit analysis Dynamic Transfer Capability Study Group Ace Diversity Initiative and Reliability-Based Control SmartGrid/Demand Response 15

 Reduce output of non-variable resources within BPA’s control area to minimum generation level. ◦ About 6,348 MW-hrs of reduced generation through June 2. ◦ Remaining non-variable generation in BPA’s balancing authority is around 100 MW (out of 7000 MW nameplate).  ER has been implemented nightly since May 18 except for May 25 and June 1. ◦ About 55,235 MW-hrs of wind generation has been replaced by FCRPS hydro generation since May 18. ◦ About 15% of the wind generation was reduced due to Environmental Redispatch during this period. ◦ ER has been implemented in the range of 4-7 hrs per night. 16

 Power and Conservation Council analysis suggests that the likelihood of oversupply events has increased significantly since 2008, but will remain roughly constant as load growth catches up with renewable build-out. 17 From Power and Conservation Council draft, “The Effects of an Increasing Surplus of Energy Generating Capability in the Pacific Northwest,” paper,

 Refine BPA/Council oversupply forecasting and financial evaluation  Continue short-term measures that can reduce need for Environmental Redispatch ◦ Maximize displacement of thermal generation ◦ Optimize transmission maintenance schedules ◦ Maximize storage/draft flexibility with Corps of Engineers, Bureau of Reclamation, and Canada. ◦ Maintain open communication through Friday Spring Operations call  Evaluation of other suggested physical, market and institutional alternatives ◦ New intertie transmission ◦ Storage/load control ◦ Reducing dissolved gas levels (e.g., flow diverters, temperature control) ◦ Pumping load ◦ Fuel substitution (e.g., steam processes). ◦ Resistive (dummy) load banks. ◦ Encourage diverse wind, or non-wind renewable resource development.  Alternative cost-allocation/legislative approaches 18

30-Minute timeframe Ramps Up Largest in MWs -> 1120 MW (40%, 2010) Largest % of nameplate -> (51%, 2008) Ramps Down Largest in MWs -> -937 MW (-34%, 2010) Largest % of nameplate -> (-49%, 2008) Minute timeframe Ramps Up Largest in MWs -> 1580 MW (57% 2010) Largest % of nameplate -> (67% 2008) Ramps Down Largest in MWs -> MW (-42% 2010) Largest % of nameplate -> -49% (2008) The absolute magnitude of ramps on BPA’s system is increasing, although ramping as a percentage of the installed wind capacity is declining a bit (reflecting some diversity value).

20 Balancing Reserves Allocated to Wind on BPA’s System BPA projection based on 30-minute persistence wind schedules and 60 minute operating periods.

 NW Resource Adequacy Forum evaluation of contribution of wind to regional reliability and development of flexibility adequacy metric;  PNUCC System Planning Committee review of capacity, energy and flexibility definitions and planning requirements;  Utilities beginning to explicitly address flexibility requirements in their IRPs.  Manufacturers responding with more flexible/efficient generators.  SmartGrid and Demand Response Initiatives looking for flexibility on the load side of the equation. 21

 With the region already approaching 6,000 MW, the potential supply of additional wind energy significantly exceeds total 2020 RPS demand of ~10,000 MW.  Region appears to have identified and subscribed the necessary transmission builds to support RPS for 2020 and likely beyond.  Economics of large-scale intertie expansion are questionable.  Springtime oversupply is our most acute challenge today, but the efficient provision of balancing services will require continued coordinated, focused attention.  While there are challenges, they don’t appear insurmountable if we work together to address them. 22

 Examine reliability concerns ◦ Report on BPA T&I August 23 meeting on stability and transient response.  Report back on BA consolidation and Energy Imbalance Market work. ◦ Grant, Chelan, and Avista analysis on consolidation. ◦ Complete analysis of EIM benefits by early fall, following June 22 cost/benefit report by WECC.  Report on BPA/ColumbiaGrid work on dynamic transfer capability: availability and expansion costs.  Committee members to meet to determine way forward on legislative changes to PTC and RPS. 23

 Cost Allocation Issues ◦ Some members interested in ways to deal with negative market prices– potentially BPA engaging in negative market transactions and folding costs into WIC.  Long term solutions to oversupply. ◦ BPA requested the Council to lead an effort to look at infrastructure changes to deal with oversupply issue.  Flexibility Adequacy with focus on natural gas. ◦ PNUCC and the Resource Adequacy Forum with be asked to coordinate with gas industry to determine potential issues. Some members concerned that the region should consider scenarios of larger wind build-out than is expected. 24

25 Presentation and meeting notes available at: