TDG10 th of December 2011 2012 Corporate Scorecard – Final Proposal KPI TARGE T MAX SCOR E ASSETSSCORING & COMMENTS Safety Critical Elements (SCE) Asset.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
. . . a step-by-step guide to world-class internal auditing
PROCESS SAFETY DAY OCTOBER 28th 2014
Environmental Management System Bruce Barnard Terry Parish Teresa Woodley.
Contractor Safety Management
The role of the Staff Governor Presented by Kevin Finnigan 3 rd December 2012.
1 SNP Educational Session – January 13, 2014 Model of Care Scoring Guidelines SNP Educational Session - January 13, 2014 Brett Kay, AVP, SNP Assessment,
Measuring and Managing Operational Risk. 2 Assessing Operational Risk Exposure Required Process of Continuous Risk Assessment, Monitoring and Reporting.
Office of Inspector General (OIG) Internal Audit
What SMS means for an Operator’s relationship with the CAA
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
???? HSE MS Audit ??? 2001 SIEP EP-HSE.
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
Control environment and control activities. Day II Session III and IV.
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Effectively applying ISO9001:2000 clauses 5 and 8
Managing NORM - Oman and Regional Issues
Level 1 HSE MS Audit Insert date here Opening Presentation Insert Title here.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Presented to President’s Cabinet. INTERNAL CONTROLS are the integration of the activities, plans, attitudes, policies and efforts of the people of an.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
NIST Special Publication Revision 1
1 20/10/2004 Petroleum Development Oman Xxxxxxxxxxx (Audit Title) HSE MS Audit Xxxxxx (Period)
SANEDI. INDEX  KEY ACTIVITIES DURING FINANCIAL YEAR  DISCUSSIONS ON KEY ACTIVITIES  CONCLUSION  APPRECIATION.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Update MRL Matrix to address STE/SIE Validation Steve Watts AMRDEC Sep 15.
The Audit as a Management Tool Vermont State Auditor’s Office – April 2009.
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
Divisional Chief Executives Supported by Divisional Risk Committees Executive Committee Group Chief Executive Group Functions Group Finance Director Group.
IT Controls Global Technology Auditing Guide 1.
TREASURY REGULATIONS’ CHANGES AND POTENTIAL IMPACT
KNPC HSE Management System
Hitting the Leadership Target Through Leadership and Accountability.
Kathy Corbiere Service Delivery and Performance Commission
LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.
Corvelle Drives Concepts to Completion EPAP Compliance Guidance.
TEQSA The Tertiary Education Quality and Standards Agency.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Exercising, Maintaining and Reviewing BCM Arrangements ERMAN TASKIN
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Oversight “The NPPO of the exporting country has the responsibility for ensuring that systems for exports meet the requirements …”
International Safety Rating System
MSE4 Technical Safety Engineering Framework. Technical Safety Function – Core Activities CFDH Skill pool management Skill-pool health – Job Descriptions,
An Overview on Risk Management
ISO 14001: 2004 Environmental Management Review Presentation
Competence Pack Guide to Assessment.
Competence Can Do or Have Done!. Competence Can Do or Have Done!
Don’t pull a twisted sling
HSE Case: Risk Based Approach.
Safety Assessment Efficiency Group 2 - Exercise 1
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Make sure your PEFS are Up-to-Date
Closing Presentation Date
Competence Pack Guide to Assessment.
Instrument PDR Summary of Objectives
PDO and Contractor Partnership in FLS
FLS 2017 – Q4 update and What is Next?
Understanding your Workplace Specific Critical Controls
ISO management systems
How to build your Integrated
HSE Competence Assessment/Development Process
Presentation transcript:

TDG10 th of December Corporate Scorecard – Final Proposal KPI TARGE T MAX SCOR E ASSETSSCORING & COMMENTS Safety Critical Elements (SCE) Asset register verification complete and implemented 4 Assets 22 Bahja, Yibal Oil, Qarn Alam Gas & Fahud Scoring: 5.5% per asset Comments: This exercise will ensure that all the SCEs have been identified in the Asset register for all hardware barriers and are identified against their SCE group. It will also ensure that performance standards are established. Number of interior ops staff to complete role related AI-PSM competences as defined by PR-1029 (Competence Assessment & Assurance) 840 (60%) 22 OND, OSD, GD & UID Assets SCORING: <560=0, 560=16, 630=17, 700=18, 770=19, 840=20, 910=21, ≥980=22 COMMENTS: As per minimum requirement of competency matrix within PR-1029 (including electrical and instrument). Total population Completion of Level 2 self assessments and cross-directorate audits 5 Assets 22 Marmul, Fahud, Yibal, SNGP, MOL/SOGL Scoring: 4.4% per asset Comments: This is meant to asess the adequacy & effectiveness of the implementation of AI-PSM requirements. The audit will be conducted using the PDO HSE Audit methodology (independently led or supported). High risk well integrity issues in eWIMS across PDO by year-end <1222 PDO wells Scoring: ≥16=0%, 15=5%,14=10%, 13=15%, 12=20%, 11=20.5%, 10=21%, 9=21.5%, ≤8=22% Comments: Any well with Action Code 9 or 10 or any Type 1 well not in compliance with the WFM or with approved deviation from standard in place. Assessment of RED anomalies in PACER/CIRRAS & corrective work orders established for those related to SCE. Deviations to be raised in FSR (as per PR-1983) 022 All PDO Scoring (outstanding and non-deviated reds): >10=0%, 6- 10=14%, 1-5=18%, 0=22% Comments: Process Containment is one of the key control hardware barriers. This KPI is designed to drive behaviors in the organization not to accept RED anomalies without assessment and SAP corrective work orders and reflection in FSR. Deviation to be raised where required. TOTAL (Target:100) 110

TDG10 th of December AI-PSM KPI

TDG10 th of December AI-PSM KPI (Continue)