ABC130 and HCC Submissions F.Anghinolfi 08/02/131ABC Final Design Review.

Slides:



Advertisements
Similar presentations
BLS U.S. Bureau of Labor Statistics The Paperwork Reduction ACT (PRA) What You Need to Know for Government UX Work Jean Fox Presented to the.
Advertisements

Expiring Lines Update August 28, 2013 SAC Cristy Perrin 1.
Alternate Software Development Methodologies
DPNC Daniel La Marra Activities in the Electronics Group « GrElec »
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
© Nintendo Game Document Game Development - Spring
CERN 30 Aug 2002ATLAS MDT-ASD PRR -- E. Hazen1 ATLAS MDT-ASD Integrated Circuit Production And Testing Plan E. Hazen – Boston University.
USC INFORMATION SCIENCES INSTITUTE MOSIS OVERVIEW MSE99 July 19, 1999 César A. Piña
Injection / Withdrawal Transmission Cost Allocation Updated Slides OMS CARP Group November 19, 2009.
High-Quality, Low-Cost IC Fabrication with MOSIS
Exam examples Tor Stålhane. The A scenario – 1 We are working in a small software development company – 10 developers plus two persons in administrative.
Magnetic Material Specification and Procurement Strategy Dawn Munson 1.
Software Process Factory Test Equipment Support Presenter: Kou Song.
August 2014 Course Development with Instructional Design and Technology (IDT)
Material Requirements Planning
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Mr. Dennis Dudek Deputy Director C&T Defense Supply Center Philadelphia.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Inventory Management MD707 Operations Management Professor Joy Field.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
HS Internship Webinar Program Basics and Q&A. Agenda 1.The program 2.Chronological details and mandatory requirements 3.Attachment A: Statement of Commitment.
Sourcing Event Guide Updated September 12, 2011 Sourcing Event Guide.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Data Storage H Drive  You have access to a personal network drive called the “H” drive.  This is 250MB of space where you can keep your most crucial.
A.Marchioro - CERN/PH1 Accessing 130 nm CMOS Tech for ILC (Public Version) Oct 2006, Munich A. Marchioro CERN, Div. PH 1211 Geneva 23, Switzerland.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
ME! A Power Point Assignment Brooke Johnson Tuesday October 2007.
Forecasting Steps and Deadlines Attend a running start orientation at Clark (contact running start office for make up dates if you.
Estimated schedule, costs and number of ABC130 needed Tony Affolder.
When I want to work with SQL, I start off as if I am doing a regular query.
ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Network (traffic) Planning Cross country and local traffic planning.
Chapter 2 Circuit Elements.
ATIA 2009 Orlando Strand Managers Call July 28 and August 4 Hosts: Ariane Jaskolka, Senior Education Coordinator, ATIA Headquarters Caroline Van Howe,
EUDET-MICELEC Status Report October 2007 A. Marchioro / CERN-PH.
Lim Sei cK.  1. Define the term ‘business’.  2. What are the objectives of conducting business?  3. What do you need to have to start a business?
Microelectronics User Group Meeting TWEPP 2013, Perugia, IT 26/9/2013.
Slicer4 QT Thin Client / Workflow Engine Client Example Alex Zaitsev.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Assignments Locate an assignment Attach an assignment Turn in an assignment.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
AET 550 Week 6 Learning Team Performance Improvement Plan, Part II To purchase this material click below link
American Lighting Products
Master Production Scheduling (MPS)
INVENTORY.
The Associative Memory – AM = Bingo
Pico-second TDC Schedule & Production
CMS Tracker Electronics
Access to ASIC design tools and foundry services at CERN for SLHC
County Highway Accountant’s Conference 2015
Course Development with Instructional Design and Technology (IDT)
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
3DIC Consortium Meeting
LHCb electronics, 12th June 2014
VMM Update Front End ASIC for the ATLAS Muon Upgrade
3D interconnection in the DevDET FP7 proposal
זכויות סוציאליות.
CMOS Image Sensors Technology.
مديريت موثر جلسات Running a Meeting that Works
Probability: The Study of Randomness
Status of SOI Pixel Development
AIDA KICK OFF MEETING WP9
FY 2018 YEAR-END TRAINING Schedule P
UW WRF mbar forecasts.
Probability: What are the chances?
Pico-second TDC Schedule & Production
Presentation transcript:

ABC130 and HCC Submissions F.Anghinolfi 08/02/131ABC Final Design Review

ABC130 (& HCC) Submission on MPW On MPWs – Regular MOSIS MPW on 4 th May 2013 (reachable for ABC130, for HCC ?) – Next regular MOSIS MPW on 4 th August 2013 (reachable for HCC) – Additional quantities on request (but costs) 208/02/13ABC Final Design Review

ABC130 Submission on … Shared Engineering Run (ABC + TDCpix) – ABC : Shared Engineering run with the NA62/TDCpix submission (forecast 1Q 2013) – Additional Eng. Run wafers at 3.6KUSD each (120chips/w) – Needs Synchro btw TDCpix(NA62) and ABC (for submission in Feb-March. 2013, FDR January-Feb 2013 for both ASICs) 308/02/13ABC Final Design Review

ABC130 & HCC Submission Scenario 2 Shared Engineering Run (ABC + TDCpix) Additional Eng. Run wafers at 3.5KUSD each (120chips/w) Production Run wafers at 2.5KUSD each (120chips/w) 408/02/13ABC Final Design Review

ABC130 & HCC Submission Scenario 2 Shared Engineering Run (ABC + TDCpix) Eng. Run + 1 Production run = 3720 chips Eng. Run + 2 Production run = 6120 chips Eng. Run + 3 Production run = 8520 chips 508/02/13ABC Final Design Review

Separate HCC Production Option for HCC if ABC is submitted separately MPW Mosis : 40 37KUSD “Small Quantity Production” with MOSIS (one 24 wafers lot of HCC-mainly reticle) at 100K-150KUSD range (should provide much more ASICS than the 900 requested ….) 608/02/13ABC Final Design Review Addition of (worst case cost) 7000 ABC (on shared Eng. Run with TDCPix) delivery plus HCC small Production Run = ( ) KUSD ~ 472KUSD

ABC130 &HCC Engineering Run Engineering Run (ABC + HCC) – Additional Eng. Run wafers at 3.5KUSD each – Production Run wafers at 2.5KUSD each – HCC drives the schedule 708/02/13ABC Final Design Review

ABC130 &HCC Submission Scenario 3 Engineering Run (ABC + HCC) – One engineering run comes short (but close..) to /02/13ABC Final Design Review Cost 475KUSD

ABC130 Submission Scenario ABC independent of HCC – Regular MOSIS MPW on 4 th May 2013 (reachable for ABC130, probably not for HCC) – Shared Engineering run with the NA62/TDCpix submission (forecast 1Q 2013) With HCC : – Engineering Run, attached to HCC schedule Independent HCC : – Small quantity production possible through MOSIS 908/02/13ABC Final Design Review