Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.

Slides:



Advertisements
Similar presentations
Hex Box Breakwaters On Potomac River at low tide. A pier is being built right up to the breakwater and using it to provide calm water for the dock.
Advertisements

RETAINED SOIL WALL SYSTEM™
We’re serious about… Sound Proofing. We’re serious about… Double Separated Walls Sound Proofing.
T1. DESIGN OF STEEL BEAMS Steel framed building
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi April.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Structural System Overview
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.
MISSOURI RIVER BOARD MATTRESS Historic Corps photo.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on Engineering Risk Assessments (ERA) for USACE Civil Works.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3-Dimensional Views Existing spillway construction.
Chapter 20 Cladding with Masonry & Concrete
Foundation Systems.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
FLOOR Meeting 7 Study Program: S0673 / Building Construction II Period: 2007.
Structural Analysis and Design Active Members 1. Structural Analysis & Design by V.N.Murthy Brajesh Vyas 2.Structural working drawing & 3D views by Neeraj.
Basic Building Construction
Exterior Wall (Masonry)
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Other Construction Projects
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
Solar insulation principle By Arun Suvendrarajah EM10B.
Chapter 35 Section Layout.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Let’s get down to the business of geography. Why do we study the world using themes? How does it help us study different areas?
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Framing the House. Platform Framing Platform framing.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Site Work.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Caretakers House Demolition Decking to STEM and ARTS.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Cross Wall Construction
COFFERDAMS.
FOUNDATIONS.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Floor Systems and Foundation Support
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
Final team building Presentation
Sardar Patel Institute Of Technology
Common Structural Forms
B.V.Patel Institute of Technology-Diploma studies
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Chapter 7 Signing Plan Sets
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Framing the House                                                                                                                   
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
1 Semester Project Design A Multi Story Office Building
Pier Foundations Piers Suspended floor Ground beam Next slide.
اصول گودبرداری و ایمن سازی
Lecture 4 Building Construction 2 Week 5
Bunker Wall Design Wall ESS
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept

Lower End of Existing Lock Remove Stone as Required and Place Precast Floor Slab Outline of New Lower Gate Monolith Extension of the Existing Lock: General Layout Existing Guidewall Backed by Cellular Wall New Cellular Lockwall

Float-in Gate Monolith Z-Pile Cradle Key Plan Landing Pads Detail View of Float-in Lower Gate Monolith

Existing Lower Guidewall Sand Fill New Cellular Sheet Pile Wall Detail Cross Section of Lock Extension Concrete Between Guidewall and Cell Concrete Fill Graded Stone Filter Sand Concrete Floor Precast Concrete Panel Attached to Cells New Concrete Filled Cellular Lock Wall

New Cellular Sheet Pile Wall Detail View of Modification to Existing Guidewall Existing Lower Guidewall Concrete Between Guidewall and Cell Lock Floor Existing Timber Piles and Crib Sand Fill

Detail View of New Riverward Wall New Concrete Filled Cellular Lock Wall Precast Concrete Panel Attached to Cells New Cellular Sheet Pile Wall Lock Floor Concrete Fill

Detail View of Lock Floor Paved Concrete Floor Graded Stone Fill Sand