The Draft of Waste Management for Inland Navigation on the Danube Multi country – workshop on management of ship dismantling and related hazardous waste.

Slides:



Advertisements
Similar presentations
EU Strategy for the Danube Region – Vienna/Bratislava Conference
Advertisements

Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC IWRM in the Sava River Basin – a basis for sustainable development of the region.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Activities of the Danube Commission (DC)
Perspectives of development Petar Margic Budapest, September 17th, 2013 Danube Commission, Budapest.
New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
EU STRATEGY FOR THE DANUBE REGION Veronica Ionescu Ministry of Foreign Affairs Romania.
Directorate for Inland WaterwaysRepublic of Serbia - How the Danube within Serbia is being integrated into a major sustainable waterway and to deal with.
Michael Fastenbauer March 21, 2007 M-TRADE Final Conference, Tecnopolo Tiburtino, Rome (IT) Integration of River Information Services in Multimodal Information.
1 An EU Strategy for the Danube Region : Transport Working Group meeting Transport priorities Brussels, 16 September 2010 Johann Sollgruber, DG REGIO,
„South East Europe Programme” as a financing opportunity for projects in the Danube region and complementarity to other instruments COMPLEMENTARITY OF.
IRIS Master Plan IRIS Master Plan Workshop Bulgaria 5th of May 2005 Dieter Hintenaus.
Project presentation. Network of Danube Waterway Administrations – data and user orientation SVP via donau OVFRSOE AVP Plovput ACN EAEMDR AFDJ Photo credits:
WANDA – WAste management for inland Navigation on the DAnube Harald Beutl via donau – Austrian Waterway Company UNECE, Geneva
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Danube River Basin Study Sili Liu Example of international basin-wide watershed management.
TINA VIENNA Urban Technologies & Strategies GmbH Danube Future Leaders’ Conference Petrovaradin, 8-9 July 2010.
The Danube Basin ICPDR Philip Weller Danube Leaders Conference, Novi Sad, July 9, 2010 The Ecological Foundations for Development.
DATOURWAY Transnational Strategy for the Territorial Development of the Danube Area with special regard to Tourism PROJECT HISTORY Kick off meeting Braila.
Chair of Hydrology and Hydraulic Engineering University of Ljubljana The experimental watersheds in Slovenia1/34 DEVELOPING REGIONAL COOPERATION FOR SHARED.
Conference on the European Union Startegy for the Danue Region: transport, energy and environmental issues Vienna and Bratislava, April, 2010 Dr.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Platform for the implementation of NAIADES The EU’s PLATINA project and its implications for the Danube basin Gert-Jan Muilerman PLATINA project coordinator.
Institutional Capacity in Transboundary Basins: The Danube The Experience of the ICPDR UN Water Decade Workshop 11 November, 2008, Bonn Philip Weller.
EU Strategy for Danube A new challenge in the context of the territorial cohesion in the South East European Space Bucharest, 20 January, 2010 Dr. Mary-Jeanne.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
Main Ship Waste Management Issues in Croatia Iva Horvat Port Authority Vukovar Budapest, Danube Comission,
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Module 4: RBM Planning regarding Blueprint document, training skills, transboundary issues, public consultations, negotiation skills Transboundary cooperation.
The Future of Transnational Cooperation in Central Europe ( ) Claudia Pamperl JTS INTERRREG IIIC East.
Development of a Financing Model for oily and greasy ship waste Hans Berger via donau – Austrian Waterway Company Budapest,
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
Philip Weller, ICPDR Progress and current status of the Joint Statement The ICPDR point of view Joint Statement Meeting Jan. 2009, Budapest.
The Perspectives and Challenges of Transnational Cooperation in the next European Funding Period Fontwell Park, 17 October 2006 Julia ERIPRET,
Overview of the DaHar project 2nd DaHar PCT Meeting 8th March 2012 Ennshafen, Austria.
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
-0- June 2006 EU Infrastructure Trust Fund. The EU - Africa Partnership on Infrastructure and the Trust Fund Antonio Garcia Fragio Head of Division Transport,
1 EU Strategy for the Danube Region A new challenge - new opportunities Belgrade 29 April 2010 Nathalie Verschelde DG Regional Policy.
1 Public participation in the Danube Basin: approaches, activities, challenges Jasmine Bachmann ICPDR Secretariat UN Conference on Info Management and.
Bucharest, 20 January Position of the Slovak Republic The EU Danube Strategy A new instrument of Cohesion Policy after 2014 Implementation of projects:
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
JASPERS for CEF Stéphane OUAKI Head Of Unit
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
Conference with European multipliers of information 21 st of September 2010, Calarasi “Common borders. Common solutions” Common solutions” 21/09/2010.
Danube Transnational Programme – opportunities for cooperation Bucharest
River information services in Croatia Krunoslav Sopček DISC ´12 Vukovar,
INTERNATIONAL SAVA RIVER BASIN COMMISSION Almaty (KZ) October 2007 SAVA RIVER BASIN COMMISSION Dragan Zeljko The Sava Commission Secretariat Deputy.
The Adriatic Sea Partnership: A pilot program for the Mediterranean “Extraordinary Meeting of MAP Focal Points” Side Event Catania, Italy 7 November 2006.
JOINT STATEMENT FOLLOW UP MEETING `09 Horst Schindler, Ivana Tomic Budapest, January 29, 2009 Danube Commission, Budapest.
László Dobi & Olimpia Negru Priority Area Coordinators.
Future possibilities. TTGWB Mura-Zala and T-JAM recommendations to be accepted at national decision-making levels (ministries, water management authorities)
BUDAPEST DANUBE CONTACT POINT: an innovative tool to support the implementation of the Danube Strategy David Pelech Budapest Danube Contact Point 6 th.
Towards a Methodology for Assessment of Internationally Shared Aquifers International Groundwater Resources Assessment Centre Dr Neno KukuricThessaloniki,
Jūrmala (Latvia), 13th June 2012 Burkhard Fieber Head of the Department for International Cooperation, EU Affairs, Protocol and Media Policy State Chancellery.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
Danube Transnational Programme
South-East European Space
Enabling multi-modality and efficient freight logistics
The Need of Awareness for Inland Waterway Transport
The role of Territorial Cooperation in IWT and integrated planning
Workshop with the 8 PAF related Proposals & the Habitats Committee
Inland Water Transport on the Rhine and in Europe
A new financial instrument
David Pelech Budapest Danube Contact Point
Danube Strategy New Challenge and new Opportunities- State of Play
The 1997 UN Watercourses Convention
DPN OFFICIAL LAUNCH EVENT
Presentation transcript:

The Draft of Waste Management for Inland Navigation on the Danube Multi country – workshop on management of ship dismantling and related hazardous waste ETT TAIEX Bratislava 15 April – 16 April 2013

 Historical background  Navigation versus polution  Project WANDA  Project CO WANDA  IDSWC Draft Contents of presentation

 The Treaty of Paris of 30 May 1814 laid down the principle of the freedom of navigation on the major international rivers of Europe  The Convention regarding the regime of navigation on the Danube was signed in Belgrade on 18 August 1948  The Danube River Protection Convention forms the overall legal instrument for co-operation on transboundary water management in the Danube River Basin. The Convention was signed on June in Sofia and came into force in It aims to ensure that surface waters and groundwater within the Danube River Basin are managed and used sustainably and equitably.  In October 2007, a "Joint Statement on Inland Navigation and Environmental Sustainability in the Danube River Basin" was concluded and very positively received by stakeholders. Background

 The river Danube is a unique ecosystem with a high biodiversity, an important water reservoir and an international waterway with high potential for inland navigation being promoted by the EU’s transport policy.  Based on the developments of recent years, the transport volumes in the Danube Corridor are expected to increase significantly in the future.  Inland navigation can contribute to making transport more environmentally sustainable, particularly where it substitutes for road transport. Navigation versus polution

Inland navigation can, however, also have significant influence on river ecosystems, jeopardizing the goals of the EU Water Framework Directive, which aims for the “good ecological status” of all waters by Due to huge differences and missing coordination in current practices of ship waste management in the Danube riparian countries, coordinated solutions for handling of wastes generated by vessels need to be provided.  Project WANDA  Project CO WANDA Navigation versus polution

HOW AN IDEA ABOUT PROJECT PROPOSAL WAS BORNE Since more than ten years, waste reception facilities for cargo vessels are provided on three Austrian Danube Locks. Waste disposal is free of charge there and considerable efforts were made to improve the services offered. Via donau – Austrian Waterway Company, which was responsible for the waste collection at these locks, obtained the National Energy Globe Award in 2010 for these activities. Unfortunately, not all types of ship wastes can be collected at the locks – e.g. oily and greasy ship wastes, like bilge water and used oils, which can impose a real damage to the river, if discharged illegally.

 WANDA – WAste management for inland Navigation on the Danube  Duration04/ /2012  SupportEuropean Regional Development Funds (ERDF)  Total cost1,667,240 Euro  Lead Partnervia donau - Österreichische Wasserstraßen-Gesellschaft mbH WANDA PROJECT

The three-year project, which was approved in June 2009, comprises nine partners from seven countries and following observers:  International Commission for the Protection of the Danube (ICPDR)  Danube Commission (DC)  International Sava River Basin Commission (ISRBC)  Central Commission for the Navigation of the Rhine (CCNR) Water and Shipping Directorate South (WSDSüd) WANDA PROJECT AT via donau Austrian Waterway Company SKVUVH Water Research Institute HUKTI Institute for Transport Sciences Non Profit Ltd HU RSOE National Association of Radio Distress- Signalling and Infocommunications ROAPDF National Company The Administration of River Ports on the Danube J.S.Co Giurgiu ROAPDM Maritime Danube Ports BG EAEMDR Executive Agency for Exploration and Maintenanceof the Danube River – Ruse HRPAV Public Institution Port Authority Vukovar RSPLOVPUT Directorate for Inland Waterways

The following core objectives are implemented within the WANDA project:  Preparation of trans-national coordinated ship waste management concepts  Development of pilot activities for collection and disposal of ship waste  Elaboration of an international financing model for oily and greasy ship wastes  Promotion of cross-border communication and knowledge transfer WANDA PROJECT

The Draft of Waste Management for Inland Navigation on the Danube

CO -WANDA PROJECT  CO-WANDA – Convention for WAste management for inland Navigation on the Danube, SEE /D/0199/2.2/X  Duration01/ /2014  SupportEuropean Regional Development Funds (ERDF)  Total cost Euro  Lead Partnervia donau - Österreichische Wasserstraßen-Gesellschaft mbH

The Draft of Waste Management for Inland Navigation on the Danube

 via donau – Austrian Waterway Company AT  VUVH - Water Research Institute Bratislava SK  KTI Institute for Transport Sciences Non Profit Ltd HU  RSOE National Association of Radio Distress-signalling and Info communications HU  APDF National Company Administration of Danube River Ports J.S.Co Giurgiu RO  APDM Maritime Danube Ports Administration RO  EAEMDR Executive Agency for Exploration and Maintenance of the Danube River – Russe BG  PAV Public Institution Port Authority Vukovar HR  PLOVPUTDirectorate for inland waterways Plovput RS  RDA South South Regional Development Agency MD  DFEAEI General Department of Foreign Economic Activity and European Integration of Odessa Regional State Administration UA 11 partners from 9 countries CO -WANDA PROJECT

Observers – advisory experts group  International Commission for the Protection of the Danube River ICPDR  Danube Commission DC  Central Commission for the Navigation of the Rhine CCNR  International Sava River Basin Commission ISRBC  Bilgenentwässerungsverband BEV CO -WANDA PROJECT

Thank you for your attention!

Convention - REASONS

CONVENTION

Thank you for your attention!

The Draft of Waste Management for Inland Navigation on the Danube

We wish to thank all WANDA and CO_WANDA project staff for some of the graphical elements and text used in this presentation. Questions - Discussions …Last Slide….