“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on Engineering Risk Assessments (ERA) for USACE Civil Works.

Slides:



Advertisements
Similar presentations
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Advertisements

Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi April.
Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
U.S. Army Corps of Engineers - Levee Safety Program Engineer Circular Development US Army Corps of Engineers BUILDING STRONG ® Michael Bart, P. E. Chief,
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Expert-Opinion Elicitation Robert C. Patev North Atlantic Division –
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management: A View to the Future Framing the Questions – Addressing the Needs: Moving to Incorporate.
Hydraulic Screening and Analysis Needed for USACE Review
1 USACE Asset Management Workshop An Overview of Engineering Risk and Reliability Methods for USACE Studies David M. Schaaf, P.E. LRD Regional Technical.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical.
Dam Safety Program Management and Organization
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Corps of Engineers BUILDING STRONG ® Dam Safety Overview Robert Taylor, P.E. Regional Dam Safety Program Manager U.S. Army Corps of Engineers Great Lakes.
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
Delivering Integrated, Sustainable, Water Resources Solutions Uncertainty, Probability, & Models Robert C. Patev NAD Regional Technical Specialist (978)
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Risk modeling.
Scott Shewbridge, PhD, PE, GE, CFM
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling.
Matt Schueler Civil Project Management & Programs
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® America’s Water Resources: A View to the Future Presentation to National Waterways Conference.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
Forensic Engineering By: Timothy Baxter. Definition Forensic Engineering is “the application of the art and science of engineering in matters which are.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical Specialist.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
Modeling in the USACE US Army Corps of Engineers BUILDING STRONG ® Bruce Ebersole U. S. Army Engineer Research and Development Center Coastal & Hydraulics.
U.S. Army Corps of Engineers Why Asset Management? “Short list” 1000 Coastal Structures 600 Dams 2500 Recreational Areas 250 Locks 75 Hydropower
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
Planning for Non-Routine Activities
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Planning the Path Forward Institute for Water Resources Website Communications.
BUILDING STRONG ® Value Methodology Applied to Levee Repairs Missouri River Basin 2011 Flood Repairs.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Assessing Consequences Campaign Goal 2a Risk Technology Workshops.
NOTABLE HISTORIC FLOODS IN THE USA Walter Hays, Global Alliance for Disaster Reduction, University of North Carolina, USA.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
Inland Waterways Navigation Conference PIs: Robert Ebeling and
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions The Contemporary Language of Risk Analysis Campaign Goal 2a Risk Technology.
A LTERNATIVES A NALYSES FOR F LOOD M ITIGATION O PTIONS 2012 Flood Risk Management and Silver Jackets Workshop Chad Berginnis CFM, ASFPM Executive Director.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Inland Navigation - A National Perspective Jim Walker USACE, Headquarters November 8, 2007.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
How Katrina Impacted the Corps, and Implications for Those Living Near Water1 Slide1 Examples in Quantifying Flood Risk Presentation to National Flood.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
CHC-R 7 th Annual Meeting April 23, 2015 Research Lead  The University of North Carolina at Chapel Hill.
US Army Corps of Engineers BUILDING STRONG ® USACE Key Actions Mr. Terrence C. “Rock” Salt Principal Deputy Assistant Secretary of the Army (Civil Works)
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study Collaboration Webinar Series #5: Policy Challenges and Institutional.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
Infrastructure, Innovation and Standardization
USACE Standardization of Navigation Infrastructure
Presentation transcript:

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on Engineering Risk Assessments (ERA) for USACE Civil Works Infrastructure Robert C. Patev North Atlantic Division – Regional Technical Specialist (978)

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Engineering Risk Assessments

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Risk

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on ERA –Major Rehabilitation Program (MR) ERA process started in USACE in early 1990’s ERA process for MR still in use today by many USACE Districts –Develop ERA Framework for MR »ER – Assist MR reports for planning studies (Section 6 and Enc 2) »Developed ETLs on ERA »Developed ERA specific models and examples - Gates, Sheet piles, Piles, Gravity monolith stability »Develop computer software - Piles (RCPGA) and monolith stability (RCSLIDE)

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on ERA –System Studies Upper Mississippi River Illinois Waterway (1993) –Development of more advanced reliability models –Structural models – limited geotechnical Ohio River Main Stem ( ) –Development of state-of-the-art reliability models »Using finite elements, advanced reliability techniques –Development of hazard rate models –System models feed back into MR reports Great Lakes and Saint Lawrence Seaway Study (2006 – Present) –Continued development of new ERA models –Extensive use of Expert Opinion Elicitation Panama Canal Study (2009-Present) –Bi-national studies to set prioritization of investment decisions for navigation lock maintenance.

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on ERA –Interagency Performance Evaluation Task (IPET) Katrina – Operational Risk and Reliability (2005 – 2009) Examine risks the conditions of levees and flood walls prior to, after 1 June repairs, and 100-yr design levels –Estimation of reliability for over 135 reaches and 197 gates and transitions –Full risk and reliability analysis –152 hurricanes, 37 sub basins –Examine economic and loss of life

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on ERA Advanced Development of Time-Dependent Models and Response Surface Models –Structural – Chickamauga Lock and Dam MRR – Alkali Aggregate Reaction (AAR) growth (2000) –Geotechnical - Wolf Creek Dam and Center Hill Dam MRR – karst seepage (2003/2004) Screening Portfolio Risk Assessment (SPRA) for Dam Safety (2005) –Rank USACE inventory of 600+ dams »Base rate adjustment »Adjustment to rating – Adequate, Probably Adequate, Probably Inadequate and Inadequate »Relative ranking procedure »DSAC Class (I-V) ranking »Completed in 2009

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on ERA –Dam Safety Risk Assessments Complete risk assessment procedure for site-specific dams with high DSAC ratings –Potential Failure Mode Analysis (PFMA) –Issue Evaluation Studies (IES) – more formalized ERA than SPRA –Dam Safety Modification (DSM) Report – a higher level MR ERA required –Levee Safety Risk Assessments Risk assessment procedure for USACE inventory of levees and flood walls –Levee Screening Tool (LST) – similar to SPRA, to develop inventory and LSAC rating –Potential Failure Mode Analysis (PFMA) –Issue Evaluation Study (IES) – currently under development –Levee Safety Modification???

“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Where is ERA going in USACE Engineering? –Future of ERA in USACE? Increased usage and development –More major rehab studies –More system wide studies –More dam safety studies –More levee safety studies –Use in asset management (O&M) –Use in design of civil works infrastructure