Bridge No. 5515 over the Spokane River at State Line (looking south) 1 of 19.

Slides:



Advertisements
Similar presentations
Grade Separation Alternative
Advertisements

Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Delmar Boulevard bridge replacement over Interstate 170.
Great Western Corridor Feasibility Study
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
Hansen’s Truck Stop Inc. Property in Humboldt County Charlie Fielder District Director Caltrans District 1.
U.S. 33 Northern Connector Alternative
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
1 Four Proposals from Oconee County. 2 We are all unique and have different experiences and perspectives. **** Opportunities And Challenges.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
The Woodrow Wilson Memorial Bridge Project Rich Carmona Michael Francis.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
Delmar Boulevard bridge replacement over Interstate 170.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Office of Real Estate 2045 Morse Road E2 Columbus Ohio /9/2016.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Replacement of Vehicle Bridge over Spring Creek
Idaho Transportation Department (ITD)
Project Purpose and Objective
Complete Streets: Making Connections
Draft Transportation Element September 6, 2017
Clinton Street Bridge over the Maumee River
Geometric Design: General Concept CE331 Transportation Engineering.
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Monterey County Project Report for Measure X Expenditures
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Bridge No over the Spokane River at State Line (looking south) 1 of 19

Objectives of Project Ensure safety of the traveling public Minimize impacts to the environment and the traveling public Expedite Design, Environmental Permitting, Right of Way and Construction time to replace the existing bridge before it fails and an unplanned bridge closure is required Construct an Economical, Functional and Aesthetically pleasing project which meets the demands of motorized and trail users today and in the future Partner with State and County Parks Departments to eliminate the Centennial Trail at-grade crossing and minimize Park land impacts Utilize modern bridge methods with longer spans to construct a bridge with fewer piers in the Spokane River to “open up” the waterway 2 of 19

Existing Bridge Facts Built in 1939 (69 years old) 512 ft. long Originally 48 ft. wide, but currently restricted to 26 ft. (2- 11 ft. lanes with 2 ft. shoulders) Currently has weight restrictions of 10,000 lbs or less (cars and pickup trucks only) Deteriorating concrete Cracked hinges Piers in river flow Footing is undermined at river pier Inspection frequency increased to 1 year due to condition of bridge 3 of 19

Bridge has a weight limit of 10,000 lbs or less 4 of 19

Bridge is restricted to two lanes 5 of 19

Deteriorated concrete 6 of 19

Elevation of bridge showing hinge locations Hinge Location 7 of 19 Hinge Location

View from below of hinge locations Hinge 8 of 19

Hinge in fair condition 9 of 19

Cracked Hinge Bracket 10 of 19

Broken hanger on old Harvard Rd. bridge and the results at roadway level 11 of 19

Broken hanger from old Harvard Rd. bridge 12 of 19

Proposed Bridge Information On same alignment as existing bridge 480 ft. long 32 ft. wide roadway with 10 ft. wide ‘Shared Use’ trail (2- 12 ft. lanes with 4 ft. shoulders) Centennial trail rerouted to pass under south end of bridge Piers at edge of river “opens up” waterway Road closed with alternate routes during construction Built over 2 construction seasons 13 of 19

Road Closure The preferred alignment for this project will require closing the road for a period of approximately 18 months The following is a list of services which could be affected and how the impacts to the public will be addressed or mitigated: Emergency Services –Fire Department -The area north of the river will be served by the Spokane Valley Fire Department, Station #3 located on North Harvard Road and Station #4 on East Wellesley –Ambulance Service -AMR Ambulance Company has been informed of the proposed closure of the bridge School Districts –School buses from Central Valley and East Valley do not use bridge on regular routes Postal and Delivery Services –Postal and delivery services do not use bridge currently Garbage Collection –Garbage trucks can not use bridge currently Alternate routes around the project area are presented at the end of slide show 14 of 19

Preferred Alignment 15 of 19

Proposed Bridge Cross Section 16 of 19

Proposed Bridge Elevation 17 of 19

Proposed realignment of the Centennial Trail (If funding is obtained) 18 of 19

Alternate Routes 19 of 19 PROJECT LOCATION EXIT 296 EXIT 299 EXIT 2 WASHINGTON IDAHO NO TRUCKS TRUCK ROUTE SPOKANE VALLEY FIRE STA. #3 TRUCK ROUTE Pleasant View Rd. Legend Truck Route Cars and Pickups only SPOKANE VALLEY FIRE STA. #4 KOOTENAI COUNTY FIRE STA. #2