Waterway Permits Update questions to:

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

January 28, 2008 ODOT Central Office – Room 1C Post-Construction BMPs Update Meeting.
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
ASHINGTON ASSOCIATES Diversionary Works Code of Practice - Update ‘Back to the STREET WORKS 2005 NEW RULES, NEW TECHNOLOGY, A NEW TOMORROW? 18.
Year End Review January, 2015.
CT State Department of Education Bureau of Special Education.
Bart Bretherton, RG Region 2 Hazmat Coordinator Lessons Learned from Unanticipated Cleanup on a Preservation Project (a tale of whoa)
Riparian Areas Regulation Implementation Guidebook January, 2006 Presented by Michael Roth Ministry of Environment, Ecosystems Branch.
Construction Unresolved Issue: #1 Legal Authority Controversial issue: Definition of rainy season A.) October 1 – April 30, may be extended by written.
Item 11 Lahontan Region 2014 Timber Waiver April 10, 2014 Douglas Cushman P.E. Nonpoint Source Unit Chief 1.
JTA Section 18 Implementation Update Ken Franklin Geo-Environmental ODOT 28 April 2011.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Scoping in the EIA process Proposal Identification Screening
PI Manual Update EUM – March questions to:
ODOT Pavement Marking Design
Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.
Wetland Assessment Methods FHWA Needs. Laws and Regulations National Environmental Policy Act Section 404 CWA Regulatory Program Executive Order 11990,
Stage – Discharge Rating Numerical relationship between water elevation (stage) and discharge at a location in a flowing system. Expressed as an equation,
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Christine Krall, SW Region Environmental Winter 2015.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
OUR URBAN WATER SUPPLY … THE PLAN FOR MEETING OUR FUTURE WATER SUPPLY NEEDS LAWRENCE C. TROPEA, JR., P.E.,DEE EXECUTIVE DIRECTOR RIVANNA WATER & SEWER.
504 Plans Egg Harbor Township School District October 10, 2014 Presented by Dr. Bruce Singer.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Environmental Viewer and KPDES Permit Maintenance Managers April 2007.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Springfield Zoning Ordinance Revision Project Naismith Basketball Hall of Fame April 25, 2006 Planning and Economic Development Office Sponsored by a grant.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Near East University Department of Computer Engineering E-COMMERCE FOR LAPTOPS SELLING COMPANY Abdul Halim Abu Kuwaik
OFFICE OF COASTAL MANAGEMENT Karl Morgan JUNE 2013 Karl Morgan JUNE 2013.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
MOORESTOWN TOWNSHIP MUNICIPAL COMPLEX 3/22/10 Update.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
T R A F F I C C O N T R O L P L A N S D E S I G N TRAFFIC CONTROL PLANS W H A T & W H Y Traffic Safety & Construction Staging Plan Traffic Safety & Construction.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Department of Education Race to the Top Assessment Program January 14, 2009 Public Meeting Procurement Issues Mark D. Colley 555 Twelfth Street, NW. Washington,
PDP & Construction. Construction Reviews Preliminary Engineering – PM Discretion Construction Review Items Construction schedule Access Construction limits.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Unit 9: Legal Issues. Legal Issues Video Time length 11:13.
1 MI-Access Conference Presentations. 2 Common Administration Errors.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
25 th Annual Transit Conference April 23, 2012 We Need Each Other.
OSHA Safety and Health Program Management Guidelines
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
Stormwater Management
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
How to Common App Free Application Fees ends November 30th for Delaware school. You must submit your applications! Don’t wait!
Traffic Control Plan Development Course
قانون المنافسة ومنع الاحتكار
Creating a Manually- Entered Pay Estimate
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
Tajiguas Resource Recovery Project Doing More with Our Waste
Activity on Node Approach to CPM Scheduling
Controlling Project Cost and Schedule
Environmental Commitments
Pipeline Planning and Construction: Environmental Considerations
Construction Considerations
WSUP Arrowcreek Middle School Grading
Metropolitan District | mndot.gov
Indiana Finance Authority (IFA)
Presentation transcript:

Waterway Permits Update questions to:

What’s New & Up and Coming 2014 Waterway Permits Manual  New impact tables  New Regional General Permit Guidance  New flow charts  Updated Mitigation Section  Updated permit application examples

What’s New & Up and Coming Waterway Permits Website  New layout  Better organization  Updated permit guidance  User-friendly electronic Waterway Permits Manual

Regional General Permit Renewal Negotiations initiated with USACE November 2013 Estimated public notice period: late March/early April Features & improvements may include:  no stream length restriction for linear projects  temporary fill built into Sections A & B  flexible flow requirement methods  no stream gage PCN trigger  Individual permit waiver option

Ordinary High Water Mark/ Flow Requirement Issues Incorrect OHWM considerations:  Evaluator not qualified  Time of year and flow conditions  Impacts to flow requirements Temporary Access Fill does not meet flow requirements:  Reassess OHWM  Re-evaluate timing TAF is installed  Add plan note or special provisions condition to address specific contractual requirements

Constructability Reviews May be necessary for bridges with flow requirement concerns, individual permits, and large temporary access fills Early review during planning stages by designer and construction Avoid contractor issues after project had sold If issues after sale, contractor will need to provide justification for re-design

Questions