Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Department of Army Permitting Process: Dredging
Environmental Compliance Negotiating our way through the process…
1 Clean Water Act Jurisdiction & SWANCC October 2002.
US Army Corps of Engineers One Corps Serving The Army and the Nation U.S. Army Corps of Engineers Regulatory Program.
Agricultural Irrigation and the Corps Regulatory Program
Army Corps permitting of shellfish culture, harvest and restoration Bill Dewey, Taylor Shellfish Company Shelton, Washington
Freshwater Wetlands in South Carolina. Wetlands Wetlands are delineated by the Corps based on the 1987 Wetland Delineation Manual. Soils, evidence of.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
St. Paul District U.S. Army Corps of Engineers Regulatory Branch program: an overview. Presented by Rebecca Gruber, Corps Regulatory Biologist, Waukesha.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
CE 515 Railroad Engineering
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
US Army Corps of Engineers BUILDING STRONG ® Lee Anne Devine Chief, South Section Regulatory Branch Louisville District Coal Mining Activities and Section.
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
California Wetlands: Update on new state definition and policy development California Native Plant Society Fall Conservation Symposium September 10, 2011.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Wetland Creation Why and How Char Ison and Caleb Asbury.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Clean Water Act Section 404 How it affects your airport during project implementation.
ARE 309Ted Feitshans020-1 Unit 20 Regulation of Wetlands Section 404 of the Clean Water Act, Section 10, Rivers and Harbors Acts of 1890 and 1899.
Section 404 Permits Update
U.S. Army Corps of Engineers REGULATORY PROGRAM WILMINGTON DISTRICT March 13, 2008.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
US Army Corps of Engineers BUILDING STRONG ® Carrie Bond Project Manager ODOT Liaison Portland, Oregon April 21, 2015 Understanding the Corps Permitting.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
US Army Corps of Engineers BUILDING STRONG ® Mitigation and Conservation Bank Approval in Northern California Kate Dadey Chief, CA Delta Branch Sacramento.
Interpretive Rule (IR) and Applicability of the Clean Water Act, Section 404(f)(1)(A) Don Baloun Minnesota State Conservationist Natural Resources Conservation.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Proposed.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District Nationwide Permit Overview Cindy House-Pearson Chief, Inland.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Department of Army Permitting Process: Dredging
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
State of Alaska Assumption of Section 404 program Michelle Bonnet Hale, Director, Division of Water Alaska Department of Environmental Conservation Steven.
Restoration and Regulation Discussion
Samantha Tepper ODOT 404 Permit Coordinator
Coal Mining Activities
THE CORPS REGULATORY AUTHORITY
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
Environmental Law Fall 2018
Wetland Mitigation.
Army Corps permitting of shellfish culture, harvest and restoration
Waters of the U.S. Updates and Changes
Level 1B: Advanced Fundamentals Effective August 2018
An Introduction to the Corps of Engineers Regulatory Program
Pipeline Planning and Construction: Environmental Considerations
Restoration and Regulation Discussion
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Environmental Law Fall 2019
Presentation transcript:

Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada Regulatory Branch US Army Corps of Engineers, Sacramento District

Permitting Authority Section 10 Rivers and Harbors Act (RHA) 1899 Section 404 Clean Water Act (CWA)1972

Section 10 RHA Permits for all work affecting navigable capacity of territorial seas, navigable rivers and lakes. Purpose: to maintain safe/passable navigable waterways Does not have to involve discharge of material into waterway

Section 10 Navigable Waters Subject to tidal action and/or; Historically or currently used for transportation of Interstate or Foreign Commerce Most major waterways in the US Lower Colorado River Lower Green River Flaming Gorge Reservoir Bear Lake Lake Powell

Typical Work Requiring Section 10 Permits Work in, over or under the waterway Permanent or temporary work Dredging & Excavation Bank Protection/Levee Work Intake/Outfall Structures

Clean Water Act (CWA) Section 404 Clean Water Act CWA goal: Requires that a permit be obtained from the Corps prior to discharging dredged or fill material into “waters of the United States, including wetlands” CWA goal: To protect the physical, chemical and biological functions of our Nation’s waters

Typical Activities Requiring Section 404 Permits Deposition of dredged or fill material in waters of the United States and/or adjacent wetlands Site development fills for residential, commercial, or recreational developments Aquatic habitat restoration activities Bank stabilization Spring developments

Waters of the United States Waters of the United States consist of: All navigable waters and their tributaries All Interstate waters and their tributaries Adjacent wetlands to those waters

Corps’ Jurisdiction

Corps’ Permitting Program for Projects with Wetland Impacts

Step 1: Map Waterways/Wetlands Describe project area Discuss hydrology, vegetation and soils Provide locations maps Contact info of applicant/agent Wetland/OHMM Data sheets Waters delineation map Needs to meet minimum standards

Step 2: Submit Report/Map to Corps Corps verifies accuracy of map and jurisdiction via letter Delineation report may be submitted alone or with application materials.

Step 3: Submit Application Nationwide Permit – Preconstruction Notification (PCN) PCN checklist Project plans overlaid on delineation map Historic Properties/Endangered Species information Mitigation plan for permanent impacts 45-day Corps completeness review period 45-60 days to issue verification

PCN Exception (NWP 27) for NRCS, FWS, FSA and Cooperating State Agencies on non-federal lands: Requires submission of Wetland Enhancement Agreement; or Project description, including plans; or NRCS Technical Service Provider docs for voluntary wetland restoration action 30-day Corps review of submitted material

Regional Conditions Supersede PCN Exemption Examples: Work in springs, histosols and/or fens Below elevation 4217’ (GSL) and 4500’ (Utah Lake) For NWP 27: >1,500 feet of stream, >50 cu ft structural fill or grade control structure >1 vertical-foot drop

Projects With No Wetlands Impacts Use General Permit (GP) 40

GP 40 Joint permit process with State of Utah Authorizes minimal impacts to streams only (no wetlands impacts authorized) Max 300 feet, or 500 feet with bio-engineering Streamlined permitting process ~30 days

Individual Permits (IP) Processing time – 120 days Authorizes activities with more than minimal impacts (no acreage limitations) Public process Alternatives Evaluation Undergo Public Interest Evaluation Compliance with Section 404(b)(1) Guidelines Section 401 Certification (404 permits only)

Exemptions Maintenance/Replacement of existing structures Culverts, spring boxes, weirs Fencing thru wetlands Please contact Corps project manager for verification of exemption

Speeding Up The Process Request a preliminary jurisdictional determination Coordinate early with Corps project managers Site visits ESA/Historic Properties

Questions?

Thank You Contact Information: Jason Gipson U.S. Army Corps of Engineers Utah Regulatory Office 533 West 2600 South, Ste. 150 Bountiful, Utah 84010 (801) 295-8380 x 14 Email: jason.a.gipson@usace.army.mil Web Page: http://www.spk.usace.army.mil/regulatory