Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution.

Slides:



Advertisements
Similar presentations
Buildings and Structures 1
Advertisements

FVCC Fire Rescue Forcible Entry.
Mezzanine Floor.
Timber Framed Structures
Lumber Grading.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
Unit 1005 Maintain and use carpentry and joinery hand tools © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know how to.
Walls Ron Gatepain constructionsite.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
TIMBER WALL FINISHES Timber wall finishes can be generally divided into two main group: Timber wall finishes can be generally divided into two main group:
Story of a Cellar Conversion Click to start Slideshow.
After the foundations have been completed the walls are set out and construction commences. wall structures.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Topic C1 Superstructures - walls
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
CON 4003 Construction Estimating Prof R. V. Locurcio.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
NGfL CYMRU GCaD SITE CARPENTRY.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Unit 1003 Building methods and construction technology © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 2 Know about the construction.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
2 nd Year Trade Overview M. S. Martin Revised Feb
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Unit 1006 Maintain and use carpentry and joinery power tools © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 2 Know how to.
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Residential Construction Mr. Todzia
CON 4003 Construction Estimating Prof R. V. Locurcio.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Beekeeping Equipment What you Really Need Vs. What you Think You Need Vs. What you Want.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2 nd Edition © Pearson Education Ltd, Copying permitted for purchasing institution only.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
WHAT I WANT TO BE WHEN IM OLDER! CAPENTER AND JOINER.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Pedagogy Project. TEAM NORTH EAST Team Leader – Phil Fanner Team – James Brown Sue Frank Zoe Gilbert Ashley Gilby Alan Iveson Jennifer Myers Sam Riley.
Unit 6/P6 – Timber Frame Construction Name ________________
The joiners fit all the internal doors. They have to cut out all the hinge positions and fix these in place as well as the locks and keepers and fit the.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
 AKA Carpenters Square  Used for measuring right angles  Most common use is for stairs and rafters.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Recognise basic woodworking joints. 1 Can you name and state a use for these joints? These are angled butt joints, which can be used for the simple jointing.
Timber Framed Buildings
Construction Framing Mr. Brock.
Woodworking Hardware Ag Mech I Standard 6:4-5.
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Sketchbook assignment-part3
Building Construction I Sofia Sebastian 1
INTD 503- Materials Topic: Partition Walls
Beekeeping Equipment What you Really Need Vs. What you Think You Need
Name____________________________ Tutor Group _____
Wood Fasteners, Joinery, & Adhesives
Introduction The Gamma Bracing System
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
Timber Frame Panel with opening Typical panel comprises a series
Civil engineering materials windows & Doors
Introduction The Gamma Bracing System
Presentation transcript:

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Sash windows The box sash window is constructed with a frame and two sashes, with the top sash sliding down and the bottom sash sliding up. What is the sequence of operations for fitting a box sash window?

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. The window board forms the finish or trim to the top of the inner leaf of the cavity wall, where it finishes at the window opening. What is the sequence of operations for fitting a window board? Window boards

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Stairs provide access from one floor to another. Each continuous set of steps running in one direction is called a flight. Can you name all the components labelled opposite? Stair terminology

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Can you list the sequence of operations for fitting a staircase? Stairs

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Studwork Timber studwork covers partitions or walls, usually of light construction, used to divide a building into compartments. What is the sequence of operations for fitting a timber stud?

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Plasterboard can be cut with a plasterboard saw when accuracy is needed, but for most jobs, a craft knife does the job more quickly. In what ways can plasterboard can be fixed? Plasterboarding

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Door frames are usually constructed from heavier material, with solid rebates; linings are generally lighter, with planted door stops. What is the sequence of operations for fitting a door lining? Frames and linings

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution only. This material is not copyright free. Grounds can be fixed in several ways, including screwing into timber or plastic plugs, using masonry nails and using adhesive. What is the purpose of lats? Grounds