Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.

Slides:



Advertisements
Similar presentations
CORE DESIGN.
Advertisements

SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Berwickshire High School Presentation compiled 15 th October 2009.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
Campus signage – Internal
To Find and Open Your Locker.  Your locker will either be in the Upper A Hallway or the D Building Hallway.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Glenvar High School Renovations School Board Presentation
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
FAMILY ROOM & STAIRS Entertainment center & projection TV With pullout drawers Maximize under stairs space Half-wall, railing & spindles NOTES: Open room.
Research: Planet Fitness v Crunch Gym HECTOR PEGUEROPROF. VALDEZ DESIGN IVSPRING 2014.
U NIVERSITY O F K HARTOUM C ONSULTANCY C ORPORATION Dec STARS HOTEL PROJECT 5 STARS HOTEL project UNIVERSITY OF KHAERTOUM.
FIRE ESCAPE Christina Joy Chambers IND 5615 Fall 2011.
EMERGENCY BRIEFING Institute of Critical Thinking The University of the West Indies Tel: Fax:
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
Elizabethtown College Student Wellness Center Design By: Anthony Davala, Brian Brennan, & Greyson McDonald.
EXPERIENCE DILIGENCE GUIDANCE EXECUTION For more information, please contact: Robert E. Pugh Kenneth E. Fellows Principal Regional Director
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Rembrandt Tower - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
4A2C0001 陳麗珍 4A2C0075 林雅筑. If we enter STUST and turn left, we will see 4- floor building on the left. It is a sport center; it is called YOHAS. It is.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
May 23 rd, 2011 MALLS, SHOPPING CENTERS & MUSEUMS.
Code Analysis: Don’t try this at home. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
Final Assignment part 1: revise stairs Some minor markups.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
(ACCESSIBILITY LAW) MINIMUM REQUIREMENTS FOR ACCESSIBILITY
Codes.
GSA - ABAAS Leased Facilites Workshop
逢甲大學 Feng Chia University OFFFICE OF INTERNATIONAL AFFAIRS 國際事務處 Bao Zan Dormitory (for International Students)
Work Progress Photos From 15 TH To 30 TH NOV 2015.
PROVIEW CONSTRUCTION LTD SAI SHARNAM Pictorial walkthrough.
COZYEON Residence Main facilities gallery. Corridor of each floor.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Toilet design Many different regulations 1. guess what toilet features might be regulated? building code? accessibility code? universal design?
Toilet design Many different regulations 1. can you guess what might be regulated? building code? accessibility code? universal design?
Stainbeck Community Hall 162 Stainbeck Lane, LS7 2NF. Telephone: or Owned by St. Matthews.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
All information stated is intended to give a general overview of the project and the Developer reserves the right to modify as it sees fit without prior.
LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Lesson 2 Level I Looking for Signs
Penn Medicine Chester County Hospital
PROVIEW CONSTRUCTION LTD
Stock Exchange building design
Wilson Hall Fire Protection Features
225 Maple Avenue South Plainfield High Traffic County Road
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Managing Office Property
1 Semester Project Design A Multi Story Office Building
2007 Bond Issue Capital Improvement Program
MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER
Roslin Primary School.
Hannah Ehresman, Kelsey Russell, Kaitlyn Higgins, Lynette Akai
Cafeteria exit exit Entrance to media lobby 12
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Toilets In ČRG.
DEVELOPMENT APPLICATION FOR:
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Northwest Office Center – 4334 NW Expressway
Presentation transcript:

Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland

Perspective Views 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland

5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland Building Common Rentable Area Floor Exclusions Non-Rentable Area Floor Service Rentable Area Multi-Tenant Corridors & Lobbies Multi-Tenant Useable Area Existing Building 5410 Grosvenor Lane Three Story Atrium Lobby LEGEND 1 Elevators 2 Open Stair 3 Exit Stair 4 Men’s Toilet 5 Women’s Toilet 6 Drinking Fountain 7 Floor Electric Room 8 Floor Telephone Room 9 Janitor’s Closet 10 Main Electric Room 11 Sprinkler Room 12 Elevator Machine Room 20’ 10’ 0’ 20’ 40’ 60’ First Floor Plan

5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland Building Common Rentable Area Floor Exclusions Non-Rentable Area Floor Service Rentable Area Multi-Tenant Corridors & Lobbies Multi-Tenant Useable Area Existing Building Lobby 5410 Grosvenor Lane Three Story Atrium Balcony LEGEND 1 Elevators 2 Open Stair 3 Exit Stair 4 Men’s Toilet 5 Women’s Toilet 6 Drinking Fountain 7 Floor Electric Room 8 Floor Telephone Room 9 Janitor’s Closet 20’ 10’ 0’ 20’ 40’ 60’ Second Floor Plan

5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland Building Common Rentable Area Floor Exclusions Non-Rentable Area Floor Service Rentable Area Multi-Tenant Corridors & Lobbies Multi-Tenant Useable Area Existing Building 5410 Grosvenor Lane Three Story Atrium Balcony LEGEND 1 Elevators 3 Exit Stair 4 Men’s Toilet 5 Women’s Toilet 6 Drinking Fountain 7 Floor Electric Room 8 Floor Telephone Room 9 Janitor’s Closet 20’ 10’ 0’ 20’ 40’ 60’ Third Floor Plan

5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland

Site Plan LEGEND 1 Main Entrance 2 Atrium Entrance 5410 & 5420 Grosvenor Lane Parking Spaces 4 Main Entrance 5410 Grosvenor Ln. 5 Main Entrance 5430 Grosvenor Ln. 6 Main Entrance 5440 Grosvenor Ln. 7 Atrium Entrance 5430 & 5440 Grosvenor Lane 8 Main Entrance Future Building 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland