LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY.

Slides:



Advertisements
Similar presentations
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Advertisements

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Village Spaces—Library, Village Office and Police A town hall discussion February 2015.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Church Renovation/ Expansion Proposals Willowdale.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Wheeling Stamping Building and Stone Center Wheeling, WV Regional Economic Development Partnership PO Box 1029 Wheeling, WV /
Star Fireworks Austin Iverson.
EXTREME MAKEOVER OR GENTLE REMODEL Linda Demmers Infopeople 2006.
Where in the World? -Our home is in New Jersey because the State of New Jersey gives generous rebates on top of the rebates granted by the US Government.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Building for Their Future Dublin Unified School District.
Revitalizing Our Library A building program our community deserves.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
“ Let’s Bond Together ” Issue 3 Expect….Believe….Achieve.
As developed by the Gilford Facilities Planning Committee.
Town Meeting Presentation October 29, 2012 Randall Library Building Committee.
Assignment Current Status Handbook Change proposals – Technical – Installation – Behavioural – Research Project Legal aspects Contents.
San Marcos Unified School District Survey Conducted: March 10-15,
New Configuration Public Hearing May 15, 2008 Superintendent Terry E. Shoemaker.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Fairbank, Maslin, Maullin & Associates Opinion Research & Public Policy Analysis Santa Monica, CA – Oakland, CA – Madison, WI - Mexico City City of Palo.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Basic House Design.
BUDGET Compliance With Levy Limits. You are the next contestant on The Price is not Right Cost Controls from Madison have caused major problems.
Ch. 8 Choosing a Place to Live Journal: Do you think a neighborhood in which someone lives is as important as the home in which they live? Explain your.
Some Pointers for your assignment..  Passive solar heating is defined as using solar energy incident on windows, skylights, greenhouses, clerestories,
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
DRAUGHON COMMUNITY ROOM Welcome to the
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
Alice Baker Memorial Library Report to Town and Village Board March 2, 2016.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
AMERICAN PUBLIC UNIVERSITY SYSTEM A 21 st Century University in an 18 th Century Town Dr. John Hough Vice President, Community College Relations & Outreach.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Ludington Renovation Update April 1, Ludington Renovation Update Pre-Design/Design Development LEED and Green Elements Cost Estimates and Funding.
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
HVAC Replacement Case Study
Consolidated Central Office Building
Community Meeting, July 18, 2016 Update Designs and Phasing
Brewster Ladies’ Library Design & Renovation Project
How we got to ‘U’ aka Measure ‘U’pgrade.
FLORIDA’S CAPITOL BUILDINGS
Cornwall Central School District
School #1 Ballot Question and Proposal
Watchung Borough Library
Efficiency in the Lifecycle of Affordable Housing
UNION GROVE ELEMENTARY REFERENDUM
Designing the tiny house
The summer of 2018 and all the work that has taken place
What We Do Orientation to my perspective-
City of Pilot Point 2018 bond election
Demmer Library Mission Statement
Chimacum District Facility & Program Plan
Open Hearing Presentation March 18, 2019
Stoughton Public Library
Dixon Middle School Project Update
Presentation transcript:

LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY

LANGDON LIBRARY - HISTORY  1890 Woodbury Langdon bequeaths books and money to town of Newington for library  1892 Library constructed  1893 Library dedicated  1913 Addition constructed  1969 Addition proposed by librarian Marjorie Pickering  1970 Small “wings” (bathrooms, storage) added to 1913 addition  1971 Phase 2 (Children’s Room) of addition “temporarily shelved”  2013 Addition & renovations proposed

 Structural and system upgrades  Repair rotten sills in basement  Repair support beams in attic LANGDON LIBRARY NEEDS

 Attic is non-accessible and not rated for book storage  Can be used for light storage only LANGDON LIBRARY NEEDS

 Support beams have split, slipped, and shifted over years  October 2012 earthquake may have exacerbated damage LANGDON LIBRARY NEEDS

NEWINGTON LOVES ITS LIBRARY In 2011, per capita, we were 16 th busiest library out of 234 in the state! In 2012, we were even busier with 8,802 patron visits!

 More (and more flexible) square footage to support a wide variety of activities & programs  More shelf space for expanding collections  Improved energy efficiency to lower operating costs  Floor plan that allows current staffing levels to oversee entire building  Dedicated acoustically separated children’s room  Dedicated staff work room for materials processing  Dedicated quiet rooms for tutoring, proctoring, tax prep, quiet study, computer training, private meetings, etc. A MODERN LIBRARY NEEDS

 Space is available for story time & crafts, film screenings, book discussions, author visits, historic displays, art, etc.  Dedicated quiet spaces to serve small groups  A library ready to serve needs as they evolve into the future FLEXIBLE SPACE MEANS

 Currently library has only 1,000 linear feet of shelf space  Shelves are at or near capacity now  No room to grow the collection or to display materials  No room to house and display historic books and materials SHELVES ARE PACKED

 Would double shelf capacity to support next 50 years of book, movie, game, and technology acquisitions  Allow us to properly protect and display original Woodbury Langdon collection EXPANDED SHELVING SPACE

 Take advantage of Southern exposure for passive solar  Modern lighting controls to reduce electricity use  Improved insulation for improved building envelope  Latest HVAC for efficient heating, ventilation, and air-conditioning year-round  Design goals include:  Green operations  Sustainable maintenance  LEEDs-eligible efficiency standards BETTER ENERGY EFFICIENCY

NATIONAL LIBRARY STANDARDS By Thomas A. Ladd, MLS 6,612 sq.ft

LANGDON LIBRARY OVERVIEW  Re-grading of surrounding grounds to eliminate need for access ramps  Angle-in parking saves grass and doubles available parking  Trees taken will be used/sold if possible  Town forest unaffected

NEW LIBRARY FLOOR PLAN Red circles = wheelchair turning radius Blue = reused existing fixtures from old library

 New Addition: $1,352,168 ($ per ft 2 )  Existing Library Repairs: $366,000 (if done in conjunction with expansion)  Fire Suppression: $172,459 (cistern, pumps)  This yields a Guaranteed Maximum Price of: $1,890,627 BREAK DOWN OF COSTS

 Private Fundraising  Buy-a-Brick  Sponsor-a-Stack  Naming Opportunities  Donation from Langdon Library Trust Fund  Corporate Fundraising  Historic Preservation Grants  NOTE: Fundraising only works if town votes to bond! FUNDING SOURCES

 The quoted interest rate for a 5 year bond (as of 2/26/13) is 2%  This yields a $0.40 per thousand impact on the tax rate  The median home in Newington is valued at $500,000 (per 2010 state census)  The average home would pay $16.67 per month (55 cents per day) TAX IMPACT

 The cost to fix the library alone (without the addition) would go up by $100,000-$150,000 in construction cost alone.  This is because certain aspects would not be at a reduced rate associated with a “bigger” job  Fire suppression still needs to be provided (cistern)  Fixing the building means that ADA compliancy MUST be met - - the library is NOT exempt as being in the historic district  Therefore, nearly ½ of the existing items in the library would need to be removed and stored (at an additional cost)  Worst of all, the library would need to be closed for several months during the process! WHAT IF WE JUST FIX IT?

THE NEW LANGDON LIBRARY!