Bond Street Hotel & Conference Center, Brooklyn. NY A Project by Bond Street Urban Development Corp.

Slides:



Advertisements
Similar presentations
All of the surrounding buildings are older and traditional. Frank Gehry sought to bring an organic form that makes it look like the building can be a celebration.
Advertisements

PROJECT EMERALD SKYLINE
400 North Orange Avenue Orlando, FL
Welcome Neighbors! Public Meeting for Proposed Rezoning The area bordered by the Alley above 3 rd Street to the Alley below 3 rd Street, between North.
GLOBAL CENTURY DEVELOPMENT LLC Downtown Houston International Development District.
One Point & Two Point Perspective
WHAT DOES THE CITY of New Orleans ZONING ORDINANCE DO?
1. Background 2. Design 3. Cost 4. Fundraising PLACE OF WORSHIP – there are around 500 members of St John’s and services are held throughout the week.
Unique environmental vacation village in the Middle East.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
1 Residential Design by the Rosellini Group, llc, copyright © 2007, all rights reserved THE WATERFRONT at FIDALGO BAY A Planned Mixed-Unit Development.
East 125 th Street Development Taskforce Summary of RFP Reponses April 5, 2007.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Commercial Building Project Portfolio
City of Scottsdale Senior Center at Granite Reef
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Outcomes of the Charrette of 20 Feb The Event 10 the Art Academy Co-sponsored by AIA Cincinnati UDC, USGBC, and Architectural Foundation.
GATEWAY CAMPUS CENTER. Gateways The Civic Gateway The Learning Gateway The Environmental Gateway The Information Gateway The Gateway to Campus Life.
Blue Prints.
NATCHEZ HISTORIC TRAILS Natchez, Mississippi The purpose of the Natchez Historic Trails Project was to create a “Museum of the Streets” within the historic.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Land Use Study for the Community of Winchester May 21, 2012.
Market Square on Russell Intermountain Development Company, Inc.
A Building Area: (sf) 32,000 sf Cost per Square Foot: $62.50/sf Construction Cost $20,000,000 Date of Substantial Completion: May 2006 Location of.
Historic Resources Catalyn Cummings Kristen Wight Christopher Clifford Kirk Huffaker Steve Cornell Catalyn Cummings Kristen Wight Christopher Clifford.
How it changed perspective for one City and its residents.
Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
Land Use Study for the Community of Winchester July 9, 2012.
Designing Landscape Areas
25-storey residential and commercial project that occupies a 4211 sqm lot Located along the corner of Archbishop Reyes and Apitong Street, just across.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
Official Plan Zoning Bylaw Land Uses
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Alex Lin Emily Schwartz Sarah Snider Kate Wittels.
AT – 201 Introduction to Architecture Dan Trent August 28,
Hospitality Operations Objective – 3.01 The World Of Lodging.
Designing the Landscape Areas Ms. Gripshover Landscaping Unit 6.
August, 2013 architecture | planning | interiors graphics | civil engineering interior design trends.
11,000 new council homes by 2043, 1,500 by 2018 Build the right kind of homes to meet a range of needs Build high quality and well integrated homes Meaningful.
Redevelopment of Children’s Memorial Hospital Chicago Lakeside.
3225 ADELINE STREET, BERKELEY MIXED-USE BUILDING TEAM: JASON MOCHIZUKI, SAFEI GU, FEI ZHAO.
Know More : DNR Reflection - 4 BHK apartments in Whitefield Bangalore.
Restaurante Los Pastores. Bar Restaurante Los Pastores Restaurante Los Pastores is a stunning blend of historical and gastronomical excellence. This is.
Global Construction Arena 6 BIM Projects Check out the Top 6 BIM Projects Executed by Pinnacle in.
where space meets performance
EXPERIENCE OF THE DEVELOPMENT TEAM
Name That Housing Option…
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
By Adam Beneroff Manitoba Hydro Place.
Halton Court – Design Approach
Penn Medicine Chester County Hospital
THE HOME OF LIFESTYLE high above the city Highest building in Austria
1326 S. MICHIGAN APARTMENTS + RETAIL
83 North Lake Avenue Predevelopment Plan Review
Commercial Construction Projects
254 East Union Street Pre Development Plan Review
Planning Advisory Committee Orientation
Land Use 101: What is Zoning?
Presentation transcript:

Bond Street Hotel & Conference Center, Brooklyn. NY A Project by Bond Street Urban Development Corp

Bond Street Urban Center A Mixed use Urban Center located at 63 Bond Street, Brooklyn, NY Rooms/Suites 30 Residential Condos Conference/Banquet Exposition Hall Retail Shoppes Landscaped Terraces Restaurants Café Bar Garage Rapid Transit Station

Five-Star Conference Hotel of 272 Rooms/Suites The project is the design and construction of a new multi-use building at the corner of Schermerhorn and Bond Streets in Brooklyn. The building’s major components are a hotel with approximately 272 keys and 30 residential condominium units, with some community arts spaces and retail spaces. The building uses are public and mixed with parking and service at the lower levels, a full service restaurant along Bond Street, the main hotel lobby on the second floor, hotel amenities and support spaces on the third and fourth floors, hotel rooms on floors 5 through 12, and residential apartments on floors 13 through 15 th. The site is located above New York City Transitís IND lines, the A, C, and G, which run below most of the property. Based on maps and drawings obtained from New York City Transit, there is an easement for the subway, which allows for the project to take only 7í-2î below the curb for itself. While the subway roof structure is sized to support the weight of the proposed building, it was not designed to address seismic and lateral loads. The building foundation will be designed to address lateral and seismic loads in accordance with current New York City Building Code requirements.

Subject location: corner of Schermerhorn and Bond Streets in Brooklyn

Graceful Appointments 2nd Floor A user rises from the street level entry lobby to the Second Floor where the the main hotel reception area opens up to a high-ceilinged room with a vista over the corner through a raised garden. In addition, the second floor houses the community uses, such as non- profit gallery and performance spaces which give great potential to the neighborhood for involvement and a sense of community as a gathering place. 3rd Floor The building’s third floor is the hotel and it ís a major public and social area. Arrived at by a grand stair open to the check-in area, the project’s main lounge overlooks the reception area and can easily be seen to become one of the neighborhood’s gathering spaces with a beautiful open terrace also overlooking Bond Street. The lounge also houses a garden café’, a small restaurant/bar which could serve a continental breakfast in the morning, The top of the grand stair begins one end of a large axial open corridor and circulation that leads one to the large ballroom and meeting rooms along Schermerhorn.

A World-Class Conference Center for Seminars, Functions with the latest in technological and AV. Ambiance… Elegant high-volume ceiling function rooms are available for conferences, seminars and functions with the latest in technological and AV support and will also serve the city and community for weddings, anniversaries and ceremonies that can easily move from inside to outside on the expansive landscaped garden..The exterior gardens are a unique amenity in an urban setting where beautiful plantings and materials provide the backdrop for casual seating, lighting and individual spaces that become an extension of both the lounge and meeting rooms Natural Elements, The gardens are ideally located on the interior and south side of the structure so that they are more intimate and protected from the street as well as receiving year- round sunlight. The view of the gardens from the guest rooms and residential units above are unsurpassed. In this area, and throughout the hotel, finishes would be environmentally sustainable, and would evoke nature and a healthy lifestyle.

Targeted Flag or Similar www. promotions/About_HGI/index.jhtml;jsessio nid=5IFBZR1USQGFGCSGBJC3MQQ The featiured name of a Hotel in this slide is solely for dicussion purposes and not intended to represent that there is a secured franchise it is the intention of the developer to seek a franchise for the Hotel from a national chain such as the identified entity.

BOND STREET HOTEL & CONFERENCE CENTER – GROUND FLOOR

BOND STREET HOTEL & CONFERENCE CENTER - SECOND FLOOR

BOND STREET HOTEL & CONFERENCE CENTER - THIRD FLOOR

BOND STREET HOTEL & CONFERENCE CENTER 4 TH THRU 11 TH FLOORS

BOND STREET HOTEL & CONFERENCE CENTER 12 TH THRU 14 TH FLOORS

BOND STREET HOTEL & CONFERENCE CENTER – GUEST ROOM MATRIX

BOND STREET HOTEL & CONFERENCE CENTER – CONDO FLOOR MATRIX

Green Building Environmental Goals for the project are very high. In addition to the high performance building envelope and mechanical systems described above, it is envisioned that the building will be able to accommodate a 100 kilowatt photovolotaic array, to be integrated into the architecture of the roof penthouse and as a part of a roof mounted canopy. Materials and finishes will be selected from available local or recycled or non-toxic or rapidly renewable sources. The building will seek recognition from the US Green Building Council as a LEED Certified

For more information Developers: Jim Benjamin Mike Yeroush Construction A-1 Construction Architects CYCLE, AIA Consultants Commercial Realty America Corporate Offices: 683 Middle Neck Road, Great Neck, NY Tel: (516) Fax: (516) E- mail: