Richard B. Garrett, PE March 2, 2011. Issues covered in this Presentation: Considerations for determining size of tank desired. Owner’s perspective of.

Slides:



Advertisements
Similar presentations
Spill Prevention Control & Countermeasures Compliance and Planning.
Advertisements

Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Chp12- Footings.
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Diesel Engine Components
GROUNDWATER CONTROL.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
BS9990 : 2015 Updates and/or Changes
PILING IMPLICATIONS FOR A NEW INDUSTRIAL DEVELOPMENT ON A CLOSED LANDFILL SITE By Michael Redfern.
Module 4: Storage and Dispensing Locations. 2 Objective Upon the successful completion of this module, participants will be able to discuss common and.
N.F.P.A. 13R Justin Bohlmann FIR-204.
Drums, Vessels, & Storage Tanks Design Considerations.
3rd Annual Harris County On-site Wastewater Seminar
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
Foundation Systems.
Chapter 33 Foundation Systems.
CVFD Training – Water Supply SFFMA Training Objectives: –
1 Module 4: Storage and Dispensing Locations. 2 Objective Upon completion of this module, participants will be able to discuss common locations for storage.
Chapter 8 Plot Plans.
Formula sheet No explanation is made on purpose Do not assume that you need to use every formula In this test always assume that K entrance = 0.5, K exit.
Pump Installation Vigyan Ashram, Pabal.
1402 Hybrid Firefighter I 6 th Edition Chapter 14 Water Supply.
AccuMax Multi-Point Injection Mechanics
Intermediate SFFMA Objectives: – Hrs received.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Foundation Engineering CE 483
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Improved Fire Protection – to retrofit fire sprinklers?
Module C Sprinkler systems (4-20)
Learning Objective 1 Explain the ways water supply system components are used by firefighters.
Water Supply.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Reinforced Concrete Design
Safe Operation of Storage Tanks: Decommissioning and Repair
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
TRENTON Casing Filler Presentation
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Geodetic Monitoring of the Deformation of a 50,000 t Sugar Storage Tank Founded on 124 Long Bored Piles P. Savvaidis and I. Ifadis Laboratory of Geodesy.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Sprinkler Loads on Trusses
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Sprinkler Loads on Trusses Educational Presentation.
Apparatus Testing Sugar Land Fire Department Driver/Operator-Pumper Academy Spring 2003.
AIRPORT SURVEYS.
ODS & SGG Considerations for Changing a System
OSHA’s NEW Walking-Working Surfaces
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Wood Structures Topic 8 Quality Workmanship
Pre-Contract Cost Control
Arch205 building construction foundation
Prepared for Municipal Officials in the Prairie Provinces March 2018
TRENTON Casing Filler Presentation
NEW COMPLIANCE REGULATIONS
February 2019.
Arch205 Materials and building construction I
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Module 4: Storage and Dispensing Locations
Bella Vista Fire Department Procedures on Sprinkled Buildings
Presentation transcript:

Richard B. Garrett, PE March 2, 2011

Issues covered in this Presentation: Considerations for determining size of tank desired. Owner’s perspective of what information should be conveyed to tank design team. Comparison of Geodesic Dome vs. Cone Roof tanks. Issues to consider per NFPA 30. Miscellaneous Safety considerations. Maintenance considerations. Options for foundation design. Check Requirements – State Web Page

1.Establish product, whether or not Internal Floating Roof will be used and type / dimensions of IFR 2.Determine Desired Working Volume: Daily Throughput x (Resupply Interval + Safety Factor) 10,000 bbl/day, 7 day resupply, 3 day safety stock Minimum Working Volume = 100,000 bbl

Highest impact to available capacity is Internal Floating Roof Overfill or Damage level (Approx. 3’ from top of tank) High – High Alarm High Level Alarm Normal Fill Distance between levels is based on maximum fill rate x response time (usually 5 minutes or 6” minimum) Bottom of tank minimum level depends on floating suction geometry to keep liquid from falling below roof for emissions. Normally set around 3’ - 4’. Expect to lose about 7’ – 8’ total height from volume with IFR.

External Roof Cone Roof vs. Geodesic Dome Roof Design Considerations – perimeter railing vs. perimeter wind girder designed for access to inspection ports. Maintenance of coating, vs. panel seams Overall Cost Comparison Overall Height – no real limitations, guided mainly by: Local codes, zoning restrictions on height limitations Consider available water pressure height to fight fires Aesthetics compared with other tanks Managing tank alignment if more than one live at same time Consider Operators – if over 60’, may need intermediate landing

Geodesic Dome vs. Cone Roof 48’ Geodome with perimeter walk/girder 56’ High Cone with perimeter railing

Net Positive Suction Head Required NPSHR – compare greater of NPSHR, tank outlet, floating suction, bottom of tank roof to determine minimum tank level. Remember to take into account all losses from the point of suction to the pump inlet. This is especially critical if using a floating suction for product quality. Depending on the geometry of the swivel, you could experience more loss through that one item than the whole length of piping.

Random Design / Safety Issues Emissions options – even though IFR may not be required for Distillate (Jet, Diesel, Kerosene), including this control measure will reduce calculated emissions and may keep you from needing a Title 5 permit. Tank stairs are laid out for convenience, usually along the normal operator walk path. However, from a safety standpoint, tank stairs or walkways providing tank top access should not cross tank valves. As indicated in previous presentations, incorporating a corrosion allowance for bottom and shell, especially if prior experience shows potential areas of corrosion in similar service tanks, can pay big dividends down the road. Tank Anchoring may be required for not only earthquake areas, but also due to high wind (hurricanes), especially with diameter to height ratio less than 1.5. For product quality and to facilitate removal of water, consider using single sloped bottom with deep sump.

Fire Protection - NFPA Fire Protection – As mentioned in previous presentations, NFPA sets minimum requirements that local AHJ can increase at their discretion. For example, Section states that “…floating roof tanks containing any liquid shall not require protection when installed in accordance with this chapter.” However some local departments still require foam protection for these type of tanks. Note – Requirements of Chapter 22 either require remote impoundment, intermediate diking, or other engineered option. Spacing is essentially 1/6 sum of diameters of adjoining tanks, up to 150’ diameter. Larger diameter may require increase to 1/4 sum of diameters. If required, you might want to consider the use of underground HDPE for transmission lines. Alternative usually requires application of sprinkler code, which requires supports at 15’ on center, designed to support 5 x the weight of the lines plus 150 lbs.

Coatings Many municipalities now require blast media to be collected and properly disposed of. On site, this can be difficult and costly. One option would be to have shell plate primed before shipping and installation. Bottom is likely to contact with water, consider good thin film coating to extend life. Depending on product service, may want to coat inside of tank – ie: Ethanol – potential corrosive stress cracking Avgas – tends to be more corrosive than other finished products. The best intentions mean nothing – a key quality control measure is Coating Inspections – especially in smaller facilities. Bring in early to have input into specification, such as surface preparation, maximum humidity allowed, admixtures for holding blast, recoat window, etc.

Foundation Alternatives Excavate & replace unsuitable soils Piles – Driven to refusal, can disturb nearby structure Auger cast – less disturbance Both still require pile caps to transmit load from bottom to pilings. Soil Stabilization – Low disturbance to nearby structures Reduces waste removal With proper testing and documentation, binder material can serve as remediation

Check for Requirements

Questions? Richard B. Garrett