The Little Nikki Assembly Instruction By Laser Dollhouse Designs.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

The term gluing means to assemble parts with a glue or adhesive.
Step-by-step assembly instructions
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Drawing & Painting Final Exam Book-Making Instructions.
ICRA Panel System Installation Instructions
Typical Walk-in Closet with elfa® décor
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
The Jasmine Gothic Victorian Cottage Assembly Instruction
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Pneumatic Arm Assembly Instructions
The Stephanie Country Mansion Dollhouse Assembly Instruction
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
The Ariel Assembly Instruction By Laser Dollhouse Designs.
The Jasmine Gothic Victorian Dollhouse Assembly Instruction
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
SHED CONSTRUCTION A Visual Guide. C.A.D. Example.
Day and Night by M.C. Escher
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Step-by-step assembly instructions
Agriscience Toolbox Plan of Procedure 1. Table Saw (equipment) Rip the bottom of the toolbox to a width of 10 inches.
Scratch Build a Water Tower
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Materials manila paper (for sketches) 6x6” piece of tooling foil
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
The Victorian Gazebo Assembly Instruction By Laser Dollhouse Designs.
This is a self-propelled hovercraft, designed to use only one motor which will both lift the vehicle and propel it forward. The hovercraft works by creating.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Gingerbread House Construction Instructions graham crackers 2.Knife 3.Cutting board 4.Hot glue gun 5.Base for house (paper plate)
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
The Glenrose assembly Instructions By Laser Dollhouse Designs.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
"Cryptex Style" Maze Coin Puzzle
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Installation Walkthrough Image Guide
Board Replacement for Floating Floors
The Reading Tug – Schuylkill By: Barry Hensel
Hand-cranked Windmill Assembly Instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hot-Air Balloons.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Building a Nightstand Woods 1 Final Project Step #1
Step-by-step assembly instructions
Louisiana Tech University
The Abriana Assembly Instruction By Laser Dollhouse Designs
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
The Garage Assembly Instruction By Laser Dollhouse Designs
The Victorian Gazebo II Assembly Instruction
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Step-by-step assembly instructions
Building an Experiment Cart
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

The Little Nikki Assembly Instruction By Laser Dollhouse Designs

Parts for assembly Roof Assembly Subfloor Assembly S1 thru S4 2 nd Floor walls 2A,2B,2C &2D 1 pk-houseworks stair set 2 pks-Houseworks stair spindles packs of 12 1 pk- newel post (6) Set of precut rails for upper stairs and porch steps 1 st Floor walls 1A, 1B, 1C, 1E, & 1F Stairs Base Floor 2 nd Floor ceiling 3 set of traditional doors Fence assembly and working gate w/ posts 1 st and 2 nd Floors Main Door assembly with plexiglas Porch and rail assemblies Set of (4) Dormers Window assemblies Gable Fretwork

PLEASE FOLLOW RECOMMENDATION FOR ASSEMBLY IF NEW TO BUILDING ALSO FIND SUGGESTIONS AND INFORMATION ON OUR FORUM AT: Do a dry assembly prior to gluing kit together, do this by using tape to hold parts in place. Recommend using wood glue during gluing such as Elmer's wood or Titebond found at most Lowes, Home depot or hardware store. Recommend primer and paint in one to make job easier as well as less coatings, prime/paint using interior paints from and paint store. During painting tape over the tabs and slots to avoid difficulty in seating parts later.

Materials for build; 1.Wood glue, you may use Titebond, elmers or any good wood glue 2.Masking tape to hold house in place during assembly and gluing. 3.Utility knife for any small trimming 4.Wood filler 5.Sand paper (any that is between grit)

Step 1. locate the Base floor and position as seen in Figure 1 Figure 1 Step 2. Locate Subfloor Assembly S1 thru S4 and insert S1 thru S4 tabs into Base floor matching Slots S1-S4 as seen in Figure 2 Figure 2

Step 3. Take the First floor marked 1A thru 1F and insert on top of assembled subfloor by aligning open slots to tabs. Refer to figure 3. Figure 2 Figure 3 Step 4. Take 1A Wall and insert into slot 1A on first floor. Then insert door assembly thru cutout for the door opening. Refer to figure 4 and 5. Figure 4 Figure 5

Step 5. Take the two rectangle and one half circle Plexiglas cutouts and insert into openings from the interior side of wall. Finally secure by placing the interior door frame in place. Refer to figure 6, 7 and 8. Figure 7 Figure 6 Figure 8

Step 6. Install first floor walls. Refer to figure 9. Figure 9 Step 7. porch step assembly. parts needed: (2) Newel post, 8 stair spindles, and porch stair assembly. Take porch stair assembly and insert 8 spindles in the holes (carefully) push the spindles into the holes till they seat at the lowest rounded out grove in spindle. DO NOT GLUE THESE IN PLACE…. See Figure 10. Figure 10

Step 8. Glue two newel post to the front lower stair riser and side rail, Newel post should seat flush within the corner and be flush at the bottom with the stair assembly. Refer to figure 11 Figure11 Figure 12 Step 9. Locate the stair rails that are precut and seat on top of the spindles. At this point glue the railing to the post, DO NOT GLUE TO SPINDLES!! Refer to figure 12

Step 10. Now align spindles up and down and glue to the hand rail. Refer to figure 13 Figure13 Figure 14 Step 12. glue from the bottom of the stairs the spindles. Refer to figure 14 Step 11. REPEAT this for the other side.

Figure15 Figure 16 Step 13. Take wood filler and press into the side holes, do this for the center steps as well. Refer to figure 15 Step 14. Cut a small piece of fine sandpaper between grit and lightly sand down to a smooth finish the steps and sides. Refer to figure 16 Steps are now ready for paint and stain.

Figure 17 Assembled stairs ready for paint or stain. Step 15. Open and assemble the interior stairs by following the instructions in the package. Make sure that you assemble the stairs with the rail on the left. Recommend NOT using superglue to apply treads(steps). Use small amount of brushed wood glue. Refer to figure 17 on completed assembly.

Step 16. Install window assemblies to outer wall and then install inner frames and shutters refer to figure 18. ( On inner frame do NOT put glue along sliding glass side frames, glue window by gluing top, bottom, and outer side edges.) Figure18

Step 17. Insert square dowel into large post with square cutout. See figure 19 Should end up with 6 completed parts. Figure19 Step 18. Insert completed porch post with single cut holes (all post have large face side forward) to the right rear. See figure 20 Figure 20 Figure 21 Step 19. Insert one of 4 rails into rear post. See figure 21

Step 20. Install post with a set of holes to the rear and a set of holes to the left smaller facing post side. Insert rail tabs and install post to floor. See figure 22. Figure 22 Figure 23 Step 21. Install post with a set of holes right only smaller facing post side. Insert rail tabs to front post and install post to floor. See figure 23. Repeat for opposite side keeping in mind that the larger face of post is the front. See figure 24

Step 22. Install interior doors and frames. See figure 25. Figure 24 Figure 25 Figure 26 Step 23. Install second floor. post fit flush to upper floor See figure 26.

Figure 27 Step 24. porch upper running fret frames in-between post. See figure 27. Step 25. Install stairs and make sure landing is flush with upper floor. See figure 28. Figure 28 Step 26. remove with a blade or small half the top of the stairs spindle. See figure 29. Figure 29

Figure 30 Step 27. Locate the 1/8” bottom square hand rail and glue one spindle center as seen in figure 30. Next glue 1/8” assembled rail to the top stair landing newel post and add one newel post to the outer end. Make sure the post are aligned with each other. See figure 31. Figure 31 Figure 32 Step 27. Locate the 1/8” top rounded rail and glue in between post. Apply small amount of pressure to seat even to top of post. If not even remove and trim spindle (very little) until desired result is achieved. See figure 32.

Figure 33 Step 28. Locate the larger of the two remaining bottom post rails and sit next to installed post. Mark with a pin on the inside of the grove the location of the spindles using the circles as a guide. Then glue spindles to bottom rail, the spindles should come out evenly spaced as seen in figure 33. Figure 34 Step 29. Next align and glue to forward post see figure 34. Figure 35 Step 30. Next align and glue the top post see figure 34. make sure it is the longer of the two remaining

Figure 36 Step 31. align and mark the final lower rail and glue to the end newel post also making sure that the rail is aligned to the left slot cutout. See figure 36. Figure 37 Step 32. install spindles figure 37 and the top rail figure 38. Install rear wall and make sure it is aligned properly, do not glue to wall till later when walls and roof are installed. Figure 39. Figure 38 Figure 39

Step 33. Install second floor walls, see figure 40. Figure 40 Figure 41 Step 34. Install second floor interior roofs, see figure 41.

Figure 42 Step 35. Install left roof panel, see figure 42. Step 36. Install front window and inner window frame, see figure 43. Figure 43

Step 37. Install gable fret, figure 44. next install right roof panel, figure 45. Figure 44 Figure 45 Step 38. Install interior doors and frames, figure 46. Align and glue frames to dormer by viewing from opposite side to where there is even amount of wood on all 4 sides. Figure 47. Install plexiglas in open wall cutout and install opposite frame to secure. Figure 46 Figure 47

Step 39. Install dormers Figure 48. Install interior dormer frames, figure 49. Figure 48 Figure 49 Figure 50 Step 40. Install shutters Figure 50.

Figure 51 Step 41. Install porch stairs, Figure 51. Press and glue to forward post, figure 52. Make sure that the step are aligned center of both front post, figure 53. Figure 52 Figure 53 Step 42. Install right fence and forward post with holes on back and side, Figure 54. Next add fence securing post and attach center fence, figure 55. Finally add left side fence and gate post, Figure 56. Figure 54 Figure 55Figure 56

The Little Nikki is now completed. Enjoy!!! Laser Dollhouse Designs