Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.

Slides:



Advertisements
Similar presentations
Partnerships in Power Franchisees
Advertisements

QUALITY AND TECHNOLOGY
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
M.KUMARASAMY COLLEGE OF ENGINEERING PRESENTED BY M.AMUTHAM.RENUGA EIE DEPARTMENT.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Plant Utility System (TKK-2210)
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
Discussion on Power Tariff in Delhi Jointly organized by Rajiv Gandhi Institute for Contemporary Studies (RGCIS) & energywatch 6 th May 2003, New Delhi.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Reduction in losses incurred in power distribution.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Power Line Carrier Communication based Automated Meter Reading System
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
Economic Evaluation of PV systems in Jordan
Technical Conference on Net Metering Load Research Study November 5, 2014.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Chapter 7 AC Power Analysis
Lyndonville Electric Department Feasibility Analysis Review December 2,
Low Voltage Smart Grid System Enables Near Real Time Energy Balancing as a Tool for Detecting and Managing Energy Losses Jan Olwagen Senior Engineer Utillabs.
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
Commercial Quality of Service Giorgi Pangani Methodology and Quality of Service Department September, 2012 Kutaisi, Georgia Georgian National Energy.
LOK SATTA Presentation to APTRANSCO By CORE 9th February 2001 People Power 1.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
ELECTRICITY LOSSES IN DISTRIBUTION COMPANIES IN KYRGYZSTAN NIKOLAY KRAVTSOV NGO "USTIN" KYRGYZ REPUBLIC BISHKEK, SEPTEMBER, 2011.
Load Research Status Presentation to the Load Research/Forecasting Working Group June 3rd, 2010.
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Submitted to: Submitted by:
Distribution Systems-General
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
Electricity pricing Tariffs.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
P ERFORMANCE S TANDARDS IN D ISTRIBUTION S YSTEM & E FFECTIVE DISTRIBUTION MANAGEMENT USING SMART GRIDS Group-3: Aditya -03 Ambuj -05 Deepak - 15 Kinshuk.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Smart Grids and Meters Workshop November 2015 بسم الله الرحمن الرحيم Electricity Loss Sudan - Khartoum The Arab Union of Electricity (AUE) The Sudanese.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Power Generation and Distribution
Agenda TSOG 8th November
Automated power Factor Correction and Energy Monitoring System
POWER FACTOR CORRECTION
RELATIONSHIP BETWEEN A T&C LOSSES And TRANSFORMER FAILURE.
INTRODUCTION TO LOAD SHEDDING TRANSFORMER
Apua workshop-ABIDJAN, 9 TO 10TH November, 2017
Distribution Loss Factors for Cost To Serve study
Indian Grid Code and Commissioning Test Procedure Dr
Yangon Region Rural electrification plan
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
EET 323 – Electrical System Design Lecture 1: Introduction to Electrical System Design Radian Belu, PhD.
Copyright of USCL & WESCARE
The Institute for Urban Economics
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Energy Management PPKSE 06/07 SAA.
EET 323 – Electrical System Design Lecture 3: Load Characteristics
Presentation transcript:

Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt. of India Chairman of Energy Infratech Pvt. Ltd. (November, 2011)

CONTENTS Anomalies in T&D Loss Computation Concept of AT&C Losses Pre-requisites for obtaining baseline AT&C losses Methodology for establishing AT&C Losses for Project Area Sample Calculation for Baseline AT&C Losses

ANOMALIES IN T&D LOSS COMPUTATION In Indian Power Sector, T&D Losses, as computed in the past, over several decades, never represented the true picture about losses in the system. Similar is the situation in a number of developing countries. The Method & Procedures enable manipulations in computations. The functionaries (Officers & Staff) could present a good picture to reflect their efficiency, while the ground reality could be different. Contd...

ANOMALIES IN T&D LOSS COMPUTATION In absence of feeder metering separating Agriculture & Domestic Consumption, substantial portion of T&D loss, including theft of electricity, gets attributed to agricultural consumption. Also, T&D loss was being computed taking into account electricity bills issued to consumers as accrued income & not on actual collection. Contd...

ANOMALIES IN T&D LOSS COMPUTATION Just by overbilling, one could show a much lower than actual loss. Therefore, T&D loss figures did not capture the major gap between the Billing and the Collection, apart from large amount of theft. Theft and deliberate manipulations by staff get subsumed in excess Billing (Which would obviously never get collected) To get over this problem, concept of Aggregate Technical & Commercial (AT&C) loss was introduced.

TECHNICAL LOSSES CONCEPT OF AT&C LOSSES Factors causing Technical Losses: Transformation Losses (at various transformation levels) High I2R losses on distribution lines due to inherent resistance and poor power factor in the electrical network Inadequate Planning & Design, irresponsible overdrawals by Consumers Overloading of existing lines and substation equipments Absence of upgradation of old lines and equipments Low HT: LT ratio Contd...

CONCEPT OF AT&C LOSSES TECHNICAL LOSSES Factors causing Technical Losses: Poor repair and maintenance of equipments Non-installation of sufficient capacitors Requirements for calculating Technical Losses: 33 kV and below HT network Line Diagrams Line Diagrams for each of distribution transformers and LT circuits upto poles/feeder pillars Voltage levels, Power factor and Current loading on HT/LT network & network equipments Line lengths, cross section & nature of material, network equipment’s load curve etc Contd...

CONCEPT OF AT&C LOSSES COMMERCIAL LOSSES Discrepancy in Meter Reading Factors causing Commercial Losses: Discrepancy in Meter Reading Untraceable consumers Stopped/defective meters Temporarily disconnected consumers continuing in billing solution Premises found locked Contd...

CONCEPT OF AT&C LOSSES COMMERCIAL LOSSES Metering Factors causing Commercial Losses: Metering Meter tampering Bypassing of meters Usage of magnets to slow down the meters Tampering of PT circuits CT/PT ratios (in case of HT meters) Contd...

CONCEPT OF AT&C LOSSES COMMERCIAL LOSSES Factors causing Commercial Losses: Theft by direct hooking Tapping of LT lines to indulge in theft through direct hooking Sometimes even drawing an underground cable direct from Distribution Transformer Contd...

CONCEPT OF AT&C LOSSES COMMERCIAL LOSSES Collection efficiency Utility is not being able to collect the complete amount billed by it. Absence of Energy Accounting & Auditing In case of unavailability of arrear figures, the collection efficiency figures can be more than 100%. Revenue collected shall exclude the arrears. In above cases efficiency needs to be restricted to 100% and shall be used for computation of AT&C losses.

PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES Metering of Energy Input Points of Project Area On incoming lines of 33/11 kV sub-stations located within project area. On 33 kV, 11 kV feeders emanating from sub-station located outside project area but supplying power to HT/LT consumers located within project area. Contd...

PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES Ring-fencing of Project area electrical network Import/export meters at the boundary of those lines that are feeding outside as well as inside project area so that import and export of energy can be measured for project area. These lines may emanate from the sub-stations located within or outside project area. Import/export meters on the dedicated feeder emanating from sub-stations located within project area but feeding outside project area. Import/export meters on 33/11 kV sub-stations LILO/tie lines. Contd...

PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES Segregation of Rural Loads within Project Area For HT (11kV) feeders, providing power to mixed category of consumers including agricultural (rural), commercial, domestic etc., within project area, utilities may segregate these feeders through installation of separate HT feeder for such loads. Contd...

PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES Billing & Revenue Collection System Billing system is to be able to provide data like sales, revenue billed and collected for entire project area. The current billing system is designed in a way that sale data can be extracted for 11 kV feeder or for distribution centers (DCs) as whole. Utilities to make provisions to account for sales happening outside project area. Contd...

PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES Computation of Input Energy To install meters at input points of each of feeders (66 kV, 33 kV, 11 kV etc.) and read them at pre-defined intervals. In case of LILO, net input energy to the project area of the feeder shall be considered. If 66 kV or 33 kV feeder is directly feeding to a dedicated consumer and that consumer(s) is within project area, input of such feeder shall be considered as part of input energy to the project area.

METHODOLOGY FOR ESTABLISHING AT&C LOSSES FOR PROJECT AREA Computation of Sales The billing for metered consumers can be done through energy recorded by meters and the applicable tariff. In case of unmetered consumption Norms established by respective state regulatory commission (SERC) for assessment of unmetered consumption. In case SERC norms are not defined, a consumption of 150 (Units) kWh for each 1 kW of sanctioned connected load. The assessment is allowed only for limited period of time and the utilities are required to complete 100% metering within 6 months. Contd...

METHODOLOGY FOR ESTABLISHING AT&C LOSSES FOR PROJECT AREA Computation of Billing Efficiency Billing Efficiency = Total Units Sold (kWh) Total Input (kWh) Computation of Collection Efficiency Collection Efficiency = Revenue Collected (in Naira) Billed Amount (in Naira) Computation of AT&C Losses AT&C Losses = {1-(Billing Efficiency x Collection Efficiency)}x100

COMPUTATION OF AT&C LOSSES