ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC February 5, 2004.
Advertisements

February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
10/11/2011 COPS Schedule for Upcoming Resettlements ERCOT Mandy Bauld.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
1 Business Integration Update to PRS January 19, 2012.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ERS Update – DSWG Presentation September 21, 2012.
1 TAC Report to the ERCOT Board February 16, 2005.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
14 Minute Ramp Period Testing Workshop June 30, 2009.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
TAC Report to the ERCOT Board
Market Notice Regarding Off-line Units
Project Update and Summary of Project Priority List (PPL) Activity
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness

Agenda Update on implementation dates Next Steps Appendix

Re-cap of why changes are being made PUCT Project #31972 Informal/Unofficial summary –Among other changes, the PUCT project increased offer caps and market transparency/reporting requirements (Substantive Rule ) –Project History: PUCT Project Initiated in 2005 Adopted 8/10/06 Effective 10/1/06- ERCOT developed an series of reports and special webpage to meet the requirements ( ) –A successful lawsuit filed to suppress changes to many disclosures –ERCOT filed PRR697 to codify data posting changes in Protocols Approved by ERCOT Board on 4/18/07- (boxed language in protocols for lawsuit) –PUCT project approved to modify disclosure timing, resulting in lawsuit being dropped/dismissed 9/19/07 –Commission staff communicated that 9/22/07 shall be effective date for disclosures

Implementation Update since last DEWG meeting –2 Market Notices and Whitepaper released Market Notice sent 11/7/07 advising market of disclosure timing changes –M-B Entity-Specific Disclosures Required by P.U.C. SUBST. R day extract Market Notice sent 11/21/07 –M-B day Posting of Balancing Energy and Ancillary Services Bid stacks Three disclosures will be changed from monthly 180-day disclosures, to daily 60-day disclosures. The three impacted reports are: –Individual BES Bid Information- ( –Individual AS Bid Information- ( –Individual Replacement Bid Information- ( The ongoing 180-day extracts (which are monthly reports) will continue to post every first Tuesday of the month to coincide with those Operating Days prior to September 22, 2007, which are subject to 180-day disclosure and will continue to be posted through April of The new daily 60-day disclosure files will begin posting December 6, 2007.

Implementation Delivery of 90-day extracts still under review –Working with PUCT on implementation date other than 12/22/07 –Interplay with AIX migration and system lockdown over holidays has delivery in late-January unless manually performed –Modifies 3 extracts Energy Schedules Report: Final energy schedules by entity by area for each settlement interval.Energy Schedules Report –Change required – Change from 6 months to 90 days. AS Schedules Report: Final ancillary service schedules for each QSE for each area and service for each settlement interval.AS Schedules Report –Change required – Change from 6 months to 90 days. Change date range AND frequency to be DAILY Energy Schedules Report: Final energy schedules by entity by area for each settlement interval.Energy Schedules Report –Change required – Change from 6 months to 90 days. –Create 4 new extracts

Implementation Whitepaper released –Per DEWG request ERCOT Drafted Whitepaper and sent to DEWG 11/12/07 including Commission Language and Protocol Language Discussed the issue of new and modified extracts Discussed issue of Day-Ahead Report No feedback to date –Regarding the Day-Ahead report and A/S bidstacks ERCOT will be looking to change the timing of the AS bidstack, and removal/zero’ing of Quantities from Day-Ahead Report –The earliest this would occur is January 2008 with the 90-day extract changes –Parties that disagree with this change are asked to draft PRR to consider changes to section

APPENDIX History of PUCT order and Extracts Impacted

History PUCT Project #31972 Informal/Unofficial summary –Among other changes, the PUCT project increased offer caps and market transparency/reporting requirements (Substantive Rule ) –Project History: PUCT Project Initiated in 2005 Adopted 8/10/06 Effective 10/1/06- ERCOT developed an series of reports and special webpage to meet the requirements ( ) –A successful lawsuit filed to suppress changes to many disclosures –ERCOT filed PRR697 to codify data posting changes in Protocols Approved by ERCOT Board on 4/18/07- (boxed language in protocols for lawsuit) –PUCT project approved to modify disclosure timing, resulting in lawsuit being dropped/dismissed 9/19/07 –Commission staff communicated that 9/22/07 shall be effective date for disclosures

History PUCT reports added to ERCOT systems –System Adequacy Reports (Short, Medium, and Long-Term “PASA” reports) –Balancing Energy Reports- 48-hour disclosure of highest offer and QSE selected –A/S Offer Selected- 48-hour disclosure report –Balancing Energy and A/S Offers above Event Trigger- 7-day disclosure

History ERCOT evaluating/implementing PUCT disclosure reports –Created 12 SIRs to add and/or modify report –SIR Aggregated BES Report: Quantities and prices of offers for energy, in aggregated form, for each settlement interval and for each area, in the form of supply curvesAggregated BES Report Change required – Adjust deadline from 30 days after Op Day to 2 days after Op Day –SIR Aggregated AS Report: Quantities and prices of offers for each type of AS, in aggregated form, for each settlement interval and for each area where available, in form of supply curvesAggregated AS Report Change required – Current posting is too soon; must be greater than 1 day, but not more than 2 days after Op Day

History ERCOT evaluating/implementing PUCT disclosure reports (continued) –SIR Self-Arranged AS Report: Self-arranged ancillary capacity services for each service, for each settlement interval and for each area (where available) in aggregated formSelf-Arranged AS Report Change required – Currently posting too soon; must be greater than 1 day, but not more than 2 days after Op Day –SIR QSE-Specific BES Report: Portfolio offer curves for BES for each settlement interval in entity-specific form for each area.QSE-Specific BES Report Change required– Change from 180-day-MONTHLY disclosure to 60- day-DAILY disclosure

History ERCOT evaluating/implementing PUCT disclosure reports (continued) –SIR QSE-Specific AS and RPRS Report: Portfolio offer curves for each AS for each settlement interval in entity-specific form for each area where available.QSE-Specific AS and RPRS Report Change required – Change from 180-day-MONTHLY disclosure to 60- day-DAILY disclosure –SIR Energy Schedules Report: Final energy schedules by entity by area for each settlement interval.Energy Schedules Report Change required – Change from 6 months to 90 days. –SIR AS Schedules Report: Final ancillary service schedules for each QSE for each area and service for each settlement interval.AS Schedules Report Change required – Change from 6 months to 90 days. Change date range AND frequency to be DAILY

History ERCOT evaluating/implementing PUCT disclosure reports (continued) –SIR Resource Plans Report: Resource plans for each QSE for each area for each settlement interval.Resource Plans Report Change required – Change from 6 months to 90 days. Change date range AND frequency to be DAILY –SIR Actual Resource Output Report: Actual output from each resource in entity-specific form for each settlement interval for each area. NEW report; daily posting, 90 days after Op Day –SIR Dispatch Instructions Report: All dispatch instructions from ERCOT for BES and AS in entity-specific form for each settlement interval for each area. NEW report; daily posting, 90 days after Op Day

History ERCOT evaluating/implementing PUCT disclosure reports (continued) –SIR Resources Committed Report: Names of resources in portfolio that were committed, name of submitting entity, name of controlling entity for each resource in portfolio by interval. NEW report; daily posting, 90 days after Op Day –SIR Dynamic Scheduling Report: Load and generation resource output for each zone, for each entity that dynamically schedules in entity-specific form for each settlement interval. NEW report; daily posting, 90 days after Op Day