MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,

Slides:



Advertisements
Similar presentations
Development and validation of RasChain alignment systems for the pre-alignment of CLIC Niels van Bakel, Bram Bouwens,Harry van der Graaf, Henk Groenstege,
Advertisements

Alignment systems for GlueX GlueX Collaboration Meeting Bloomington, Indiana May 20-22, 2004 Courtesy of Dimos Sampsonidis, Aristotle University of Thessaloniki.
Detector R&D Jan Timmermans Programme: ≥ 2003
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
H. SCHMICKLER Alignment challenges for a future linear collider.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
RasClic: A long-baseline 3-point alignment system for Linear Accelerators H. Manaud Durand, J-P. Quesnel, T. Touzé CERN TS-SU, Geneva, Switzerland Harry.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
CLIC MDI Working Group QD0 external reference structure A. Gaddi, H. Gerwig, H. Hervé, N. Siegrist, F. Ramos.
The RASNIK Alignment System. Particle Physics CERN, Geneva, Swiss.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
March 2004LCWS Stanford Instrumentation of the Very Forward Region of a Linear Collider Detector Wolfgang Lohmann, DESY.
Alignment Bars Requirements Strategy Layout Length Prediction Shape Prediction Readout Scheme Model to predict bar shape in the experiment Calibration.
Muon-raying the ATLAS Detector
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Visualization of the Optical Alignment System of the Muon Endcap Spectrometer in the H8-testbeam set-up Maaike Limper Making pretty pictures!
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
(Some thoughts/reminders on) Calibration/alignment scenarios for ILD/ILC Jan Timmermans – NIKHEF Amsterdam 07 Sep 2014ILD meeting Oshu1.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
PACMAN : technical objectives Hélène Mainaud Durand.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
Jaak Lippmaa HIP, Helsinki University
Date of download: 10/14/2017 Copyright © ASME. All rights reserved.
Laser calibration systems
Layout of Detectors for CLIC
Need for Alignment Position of off-momentum proton w.r.t. beam
The Compact Muon Solenoid Detector
Alignment challenges for a future linear collider
Integration and IR Hall
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
The ATLAS Barrel Alignment Readout System
Presentation transcript:

MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege, Joris van Heijningen, Jan Koopstra, Helene Mainaud Durand,, Richard Rosing, Vivien Rude CERN, Nikhef IWAA 2012 Fermilab, Sept 13, 2012

X Y X Y X Y Alignment of two objects: - omit Z - omit rotZ Measure: - translation X - translation Y - rotX -rotY -Equivalent to -4 points (X,Y)

Momentum Measurement of charged particles in the L3 experiment: Chamber Position Monitoring Lorentz Force: Track Curvature measurement Detector Muon Particle Track Detector

Direct measurement: two anti // Rasniks: light source + image sensor lens … would only require path of sight of 20 mm 2 …. …. along beampipe…..!

Monitor X,Y of (both) QD0 end ref’s with respect to RR (with Rasniks) to be calibrated on 3D measuring machine

Rasnik Lines-of Sight spokes

Reference Ring RR

Spoke - length 3.5 m; - has only one function: to transfer radial position better than 1 μm Material: Zerodur: thermal expansion coefficient < 0.2 x 10 -6

Alignment is NOT influented by: - (common) deformation of RRs (sag, spoke load) - temperature of individual RR - (common) deformation of spoke wheel (spoke weight compression) - temperature of individual spoke wheel

Spoke tip on RR side: contact definition < 0.1 μm Steel ball Zerodur rod (6 mm x 6 mm x 3500 mm spoke support tube: flexo suspension

Inner spoke detailOuter spoke detail Precision ring QD0 support tube

Volume reserved for support plate of Rasnik/Rasdif Radial retraction for endcap opening

1983: 4QD Red Alignment System Nikhef (Rasnik) 1993: CCD Rasnik 2003: RasDif: long distance

Comparison Stretched Wire System versus RasDif (TT1) RasChain: interconnected Rasnik systems for basic CLIC units of 2010 mm MDI/QD0 alignment: vibrations - new (green) semiconductor lasers - shielding - image analysis software

diffraction plate simulated measured Thermal shielding of light path