EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.

Slides:



Advertisements
Similar presentations
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
Advertisements

EURISOL Peter Butler University of Liverpool
Status of the EURISOL Design Study and Plans for FP7 Peter Butler University of Liverpool.
1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
ESF Workshop The future of stable beams in Nuclear Astrophysics NCSR Demokritos, Athens, Greece December 14-15, 2007 Organizing Committee S. Harissopulos.
EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
NuPECC: Towards a New Long Range Plan for Nuclear Physics in Europe Guenther RosnerEuNPC Bochum 18/3/20091.
EURISOL User Group Charter –Objectives of the User Group –Organization Next actions in the light of the future of EURISOL.
EURISOL Transition period MYRRHA and
A. FaccoJoint EURISOL-EURONS Town Meeting Helsinki, Overview of accelerators for EURISOL Alberto Facco (INFN-LNL) on behalf of the EURISOL DS.
Ion Accelerator Complex for MEIC January 28, 2010.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
Eurisol driver: heavy ion capabilities A. Pisent, M. Comunian, A. Facco, E. Fagotti, (INFN-LNL) R. Garoby (CERN), P. Pierini (INFN-MI)
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Challenges for EURISOL and the EURISOL Design Study Yorick Blumenfeld.
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
Town meeting – Helsinki – 17 th September 2007 Overview on EURISOL targets Thierry Stora on behalf of the Target Tasks.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
The Youngsters in Theoretical Nuclear Physics An Ace up France’s sleeve in the RIB competition.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Heavy Ion Accelerator for RIB KoRIA in International Science & Business Belt S. W. Hong Sungkyunkwan University S. W. Hong Sungkyunkwan University Nov.
Nuclear physics: the ISOLDE facility
1 M. Lewitowicz Introduction Performances of SPIRAL 2 Physics of SPIRAL 2 Fundamental Physics and Applications Organisation and Collaborations Next Actions.
exchangeswith AnPHA AnPHA NSAC NSAC + ALAFNA Review status of the fieldReview status of the field Issue recommendations to advance t to advance the science.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Obergurgl -02/10/2007Lecture 2. The Story so far We looked at a) our present theoretical understanding of Nuclear Structure b) Some simple physics.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
RADIOACTIVE ION BEAMS AT B.RANNOU W.MITTIG M.G.ST LAURENT (GANIL France)
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
Mapping Studies In preparation NuPECC Handbook 2004 “International Access to Nuclear Physics Facilities in Europe”, 5th Edition In print NuPECC Long Range.
SPES. 1.Develop a Neutron Rich ISOL facility delivering Radioactive Ion Beams at 10AMeV using the LNL linear accelerator ALPI as re-accelerator. 2.Make.
Introduction to SPIRAL 2 Design goals of the baseline project
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
Coseners meeting Sept Future of European ISOL Peter Butler.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
Nuclear physics: the ISOLDE facility Magdalena Kowalska CERN, PH-Dept. on behalf of the CERN ISOLDE team Lecture 2:
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
Ion Accelerator Activities at VECC
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
SPES Selective Production of Exotic Species. SPES Steering Committee - Operative since july meetings – next on March All documents (minutes,
The Future of EURISOL Results from the Design Study
for the EURISOL Steering Committee
TTC - JLab - Bob Laxdal - TRIUMF
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Progress of BRIF and CARIF
Nuclear Physics in France
BEAM INTENSITIES WITH EURISOL
Superbeams with SPL at CERN
Introduction TO PHYSICS WITH SPES
Presentation transcript:

EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay

OUTLINE The Framework General Physics Case The “Intermediate Generation” Facilities Results of the EURISOL Design Study Future Initiatives

The Framework Radioactive Ion (Rare Isotope) Beams have transformed the landscape of Nuclear Structure over the last quarter century. Major discoveries have revealed unforeseen behaviors of the nucleus Understanding of the nucleus requires a multifaceted approach Low intensities are the major impediments to further progress Fragmentation and ISOL facilities are complementary and should be developed in parallel

The Nuclear Chart and Challenges

Radioactive beam production: Two complementary methods GANIL/SISSI, GSI, RIKEN, NSCL/MSU GANIL/SPIRAL, REX/ISOLDE, ISAAC/TRIUMF High energy, large variety of species, Poor optical qualities Low energy, chemistry is difficult, good beam qualities IN FLIGHT SELECTION

NuPECC recommends the construction of 2 ‘next generation’ RIB infrastructures in Europe, i.e. one ISOL and one in-flight facility. The in- flight machine would arise from a major upgrade of the current GSI facility: FAIR, while EURISOL would constitute the new ISOL facility The Previous LRP The Current European Situation Construction of intermediate generation facilities: SPIRAL2, HIE- ISOLDE, SPES and of FAIR has begun or is about to begin. Design and prototyping of the most specific and challenging parts of EURISOL has been carried out in the framework of EURISOL_DS. EURISOL must go beyond FAIR and offer the best of both worlds : ISOL and Fragmentation

ISOL Roadmap in EUROPE FROM 2025 SPIRAL – LNS - EXCYT TODAY

CIME Cyclotron Acceleration of RI Beams E < 25 AMeV, AMeV for FF Production Caves:: RNB C converter+UC x target fissions/s p- & n-rich RNB (transfer, fusion-evaporation, DIC) Superconducting LINAC: Stable-Ion beams E ≤ 14.5 AMeV HI A/q=3, 1mA E ≤ 20 A MeV p,d, 4 He (A/q=2 ions), 5mA Possible extension to A/q=6 ions Heavy-Ion ECR p,d source RFQ LINAG Exp. Area (AEL) Direct beam line CIME- G1/G2 caves Existing GANIL Exp. Area Existing GANIL Accelerators Low energy RNB DESIR

EURORIB’08, Giens, June 9-13 Aims of the HIE-ISOLDE upgrade  Intensity : Linac  Energy from 3 to 10A MeV  Coulex for all RIB  Transfer reactions  Efficiency low energy + accelerated  Selectivity  Beam “quality”  Reduced phase space  Bunching  Polarization.....

EURORIB’08, Giens, June 9-13 SC linac M. Pasini Max energy for different A/q :

The SPES LNL: The SPES LNL: a multi-user project Applied Physics with proton beam 70 MeV 550  A (possible upgrade up to 1mA) High intensity proton linac: TRIPS source - TRASCO RFQ 30 mA, 5MeV Neutron facility for Medical, Astrophysics and Material science. Neutron source up to n s -1 Thermal neutrons: 10 9 n s -1 cm -2 Production Target: UCx fission s -1 ) Primary Beam: 200  A, 40 MeV protons from a 2 exit ports Cyclotron (750  A, 70 MeV ) Re-accelerator: ALPI Superconductive Linac up to 11 AMeV for A=130 Approved for construction

TABLE 1). Participants in EURISOL Design Study ParticipantCountryParticipantCountry GANIL (coordinator) FranceInst. Physics VilniusLithuania CNRS/IN2P3FranceWarsaw UniversityPoland INFNItalyInst. Phys. BratislavaSlovakia CERNEuropeU. LiverpoolUnited Kingdom U. C. LouvainBelgiumGSI DarmstadtGermany CEAFranceU. SantiagoSpain NIPNERomaniaCCLRC DaresburyUnited Kingdom U. JyväskyläFinlandPaul Scherrer InstituteSwitzerland L.M.U. München GermanyInst. Phys. LatviaLatvia FZ JülichGermanyStockholm. U. MSLSweden EURISOL DS: 20 Participants 4 1/2 years; 30 M Euros

What is EURISOL?

 = 0.03  = 0.78 Ion sources RFQ 176 MHz HWRs 176MHz Elliptical ISCL 704 MHz 1 GeV/q H-, H+, 3 He MeV/u 100 keV 60 MeV/q140 MeV/q >200 MeV/q D+, A/q=2 Charge breeder Low-resolution mass-selector UC x target 1+ ion source n-generator  =  = 0.14  = 0.27  = QWR ISCL 88 MHz 3 QWRs ISCL 88 MHz 8 HWRs ISCL 176 MHz Spoke ISCL 264 MHz MeV/u (for 132 Sn) To low-energy areas Secondary fragmentation target A possible schematic layout for a EURISOL facility 4-MW target station  = spoke ISCL 325 MHz High-resolution mass-selector Bunching RFQ To medium-energy experimental areas  = 0.65 Elliptical ISCL 704 MHz  = 0.09,  = 0.15 H- H+, D+, 3 He MeV/u MeV/u To high-energy experimental areas RFQs Charge selector One of several 100-kW direct target stations

EURISOL Target Building

EURISOL MMW Targets

Spoke cavity IPN Orsay 2 prototypes at  =0.15 and  =0.35 fabricated and successfully tested at 4.2 K. This technology is the basis for the 3- Spoke required by the Driver linac Spoke cavity tuner EURISOL Task 8: Sébastien Bousson – IPN Orsay

Secondary Fragmentation of a 132 Sn beam Cross Sections measured at GSI

Secondary Fragmentation of 132 Sn at 150A MeV

CERN GANIL RUTHEFORD LNL Legnaro

Timescale for EURISOL : Transition period; contacts with funding agencies and political bodies 2012 : Application to be included in ESFRI list (support from NuPECC & LRP necessary) 2013 : Call for preparatory phase : EURISOL Preparatory Phase 2017 : Choice of Location : Preparation of TDR : Construction 2025 : First Beam

The “Transition” Period ( ) The EURISOL project office The EURISOL collaboration: (MOU between all laboratories interested in furthering EURISOL; in preparation) The EURISOL User Group (Established with elected executive committee; will federate scientific community and update physics case; A. Bonaccorso, chair ) The EURISOL Network in ENSAR (included in ENSAR application; will coordinate EURISOL focused R&D at current facilities and fund Town Meetings; 150 KE; leader Y. Blumenfeld) The EURISOL work package in TIARA : (included in TIARA application; Define and Prepare R&D platforms for EURISOL; up to 500 KE; leader S. Bousson – Orsay) Requests to NuPNET for pan-European funded R&D through national funding agencies (approx 1ME each – at most 1 to be funded) – Liquid metal target tests – Beam splitter – ECRIS beam merger EC support for global projects: Possibility of EC support up to 1 ME to expand EURISOL into a global (worldwide) project; suggestion from Brussels still to be investigated.

Conclusions Major RIB developments are proceeding worldwide (FRIB, TRIUMF, RIKEN, KoRIA…) and competition will be fierce. The LRP must propose an ambitious roadmap to maintain and strengthen Europe’s leadership in the field This plan should be based on FAIR and the “intermediate” ISOL facilities (SPIRAL2, HIE-ISOLDE, SPES) in the near term, and EURISOL in the longer term.