EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay
OUTLINE The Framework General Physics Case The “Intermediate Generation” Facilities Results of the EURISOL Design Study Future Initiatives
The Framework Radioactive Ion (Rare Isotope) Beams have transformed the landscape of Nuclear Structure over the last quarter century. Major discoveries have revealed unforeseen behaviors of the nucleus Understanding of the nucleus requires a multifaceted approach Low intensities are the major impediments to further progress Fragmentation and ISOL facilities are complementary and should be developed in parallel
The Nuclear Chart and Challenges
Radioactive beam production: Two complementary methods GANIL/SISSI, GSI, RIKEN, NSCL/MSU GANIL/SPIRAL, REX/ISOLDE, ISAAC/TRIUMF High energy, large variety of species, Poor optical qualities Low energy, chemistry is difficult, good beam qualities IN FLIGHT SELECTION
NuPECC recommends the construction of 2 ‘next generation’ RIB infrastructures in Europe, i.e. one ISOL and one in-flight facility. The in- flight machine would arise from a major upgrade of the current GSI facility: FAIR, while EURISOL would constitute the new ISOL facility The Previous LRP The Current European Situation Construction of intermediate generation facilities: SPIRAL2, HIE- ISOLDE, SPES and of FAIR has begun or is about to begin. Design and prototyping of the most specific and challenging parts of EURISOL has been carried out in the framework of EURISOL_DS. EURISOL must go beyond FAIR and offer the best of both worlds : ISOL and Fragmentation
ISOL Roadmap in EUROPE FROM 2025 SPIRAL – LNS - EXCYT TODAY
CIME Cyclotron Acceleration of RI Beams E < 25 AMeV, AMeV for FF Production Caves:: RNB C converter+UC x target fissions/s p- & n-rich RNB (transfer, fusion-evaporation, DIC) Superconducting LINAC: Stable-Ion beams E ≤ 14.5 AMeV HI A/q=3, 1mA E ≤ 20 A MeV p,d, 4 He (A/q=2 ions), 5mA Possible extension to A/q=6 ions Heavy-Ion ECR p,d source RFQ LINAG Exp. Area (AEL) Direct beam line CIME- G1/G2 caves Existing GANIL Exp. Area Existing GANIL Accelerators Low energy RNB DESIR
EURORIB’08, Giens, June 9-13 Aims of the HIE-ISOLDE upgrade Intensity : Linac Energy from 3 to 10A MeV Coulex for all RIB Transfer reactions Efficiency low energy + accelerated Selectivity Beam “quality” Reduced phase space Bunching Polarization.....
EURORIB’08, Giens, June 9-13 SC linac M. Pasini Max energy for different A/q :
The SPES LNL: The SPES LNL: a multi-user project Applied Physics with proton beam 70 MeV 550 A (possible upgrade up to 1mA) High intensity proton linac: TRIPS source - TRASCO RFQ 30 mA, 5MeV Neutron facility for Medical, Astrophysics and Material science. Neutron source up to n s -1 Thermal neutrons: 10 9 n s -1 cm -2 Production Target: UCx fission s -1 ) Primary Beam: 200 A, 40 MeV protons from a 2 exit ports Cyclotron (750 A, 70 MeV ) Re-accelerator: ALPI Superconductive Linac up to 11 AMeV for A=130 Approved for construction
TABLE 1). Participants in EURISOL Design Study ParticipantCountryParticipantCountry GANIL (coordinator) FranceInst. Physics VilniusLithuania CNRS/IN2P3FranceWarsaw UniversityPoland INFNItalyInst. Phys. BratislavaSlovakia CERNEuropeU. LiverpoolUnited Kingdom U. C. LouvainBelgiumGSI DarmstadtGermany CEAFranceU. SantiagoSpain NIPNERomaniaCCLRC DaresburyUnited Kingdom U. JyväskyläFinlandPaul Scherrer InstituteSwitzerland L.M.U. München GermanyInst. Phys. LatviaLatvia FZ JülichGermanyStockholm. U. MSLSweden EURISOL DS: 20 Participants 4 1/2 years; 30 M Euros
What is EURISOL?
= 0.03 = 0.78 Ion sources RFQ 176 MHz HWRs 176MHz Elliptical ISCL 704 MHz 1 GeV/q H-, H+, 3 He MeV/u 100 keV 60 MeV/q140 MeV/q >200 MeV/q D+, A/q=2 Charge breeder Low-resolution mass-selector UC x target 1+ ion source n-generator = = 0.14 = 0.27 = QWR ISCL 88 MHz 3 QWRs ISCL 88 MHz 8 HWRs ISCL 176 MHz Spoke ISCL 264 MHz MeV/u (for 132 Sn) To low-energy areas Secondary fragmentation target A possible schematic layout for a EURISOL facility 4-MW target station = spoke ISCL 325 MHz High-resolution mass-selector Bunching RFQ To medium-energy experimental areas = 0.65 Elliptical ISCL 704 MHz = 0.09, = 0.15 H- H+, D+, 3 He MeV/u MeV/u To high-energy experimental areas RFQs Charge selector One of several 100-kW direct target stations
EURISOL Target Building
EURISOL MMW Targets
Spoke cavity IPN Orsay 2 prototypes at =0.15 and =0.35 fabricated and successfully tested at 4.2 K. This technology is the basis for the 3- Spoke required by the Driver linac Spoke cavity tuner EURISOL Task 8: Sébastien Bousson – IPN Orsay
Secondary Fragmentation of a 132 Sn beam Cross Sections measured at GSI
Secondary Fragmentation of 132 Sn at 150A MeV
CERN GANIL RUTHEFORD LNL Legnaro
Timescale for EURISOL : Transition period; contacts with funding agencies and political bodies 2012 : Application to be included in ESFRI list (support from NuPECC & LRP necessary) 2013 : Call for preparatory phase : EURISOL Preparatory Phase 2017 : Choice of Location : Preparation of TDR : Construction 2025 : First Beam
The “Transition” Period ( ) The EURISOL project office The EURISOL collaboration: (MOU between all laboratories interested in furthering EURISOL; in preparation) The EURISOL User Group (Established with elected executive committee; will federate scientific community and update physics case; A. Bonaccorso, chair ) The EURISOL Network in ENSAR (included in ENSAR application; will coordinate EURISOL focused R&D at current facilities and fund Town Meetings; 150 KE; leader Y. Blumenfeld) The EURISOL work package in TIARA : (included in TIARA application; Define and Prepare R&D platforms for EURISOL; up to 500 KE; leader S. Bousson – Orsay) Requests to NuPNET for pan-European funded R&D through national funding agencies (approx 1ME each – at most 1 to be funded) – Liquid metal target tests – Beam splitter – ECRIS beam merger EC support for global projects: Possibility of EC support up to 1 ME to expand EURISOL into a global (worldwide) project; suggestion from Brussels still to be investigated.
Conclusions Major RIB developments are proceeding worldwide (FRIB, TRIUMF, RIKEN, KoRIA…) and competition will be fierce. The LRP must propose an ambitious roadmap to maintain and strengthen Europe’s leadership in the field This plan should be based on FAIR and the “intermediate” ISOL facilities (SPIRAL2, HIE-ISOLDE, SPES) in the near term, and EURISOL in the longer term.