ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
The European Spallation Source Dave McGinnis Chief Engineer – ESS\Accelerator Division IVEC 2013.
RF Development for ESS at Uppsala University
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division , SLHIPP-1
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Page The High power proton accelerator for the European Spallation Source (ESS) S. Gammino Milano, 9 Marzo
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Dave McGinnis Chief Engineer – Accelerator Division
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
M. Munoz April 2, 2014 Beam Commissioning at ESS.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
AD retreat Accelerator 2012 December Mats Lindroos, David McGinnis, Suzanne Gysin, Jörgen Andersson and Steve Peggs.
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
WG-1 Session Cavity Performance Cryomodule Performance
Second SPL Collaboration Meeting, Vancouver May 2009
SPL Collaboration Meeting PAC2009
Hosting Orsay Walid KAABI
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
Implications of HOMs on Beam Dynamics at ESS
RF systems introduction
The SPL-based Proton Driver at CERN
RF introduction Anders Sunesson RF group leader
SNS-PPU upgrades the existing accelerator structure
ACCSYS Collaboration Board Triestre, 3rd october 2017
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs

ESS facility technical objectives: 5 MW (upgrade 7.5 MW) long pulse source ≤2 ms pulses ≤20 Hz Protons (H+) Low losses High reliability, >95%

ESS-Bilbao WORKSHOP PARTICIPANTS The workshop brought together more than 160 experts from across the world, leaders in the fields of high power proton accelerators, beam dynamics and targets, in a format and infrastructure that promoted open discussion, while maintaining the focus of documenting clear recommendations for future collaborative R&D efforts. Design update: ESSB Preparatory work

Reference group meetings RG1: CERN, 6 February 2009 Present: 7 people (ESS, CERN, BNL, CEA) Theme: Recent progress in SCRF technology and what implications this has on the ESS (2003) linac design Main outcome: Tentative parameter list for ESSS linac proposal RG2: Lund, 25 February 2009 Present: 9 people (ESS, CERN, BNL, CEA, TSL, MSL, FNAL) Theme: Develop the tentative ESSS linac design from RG1 Main outcome: PAC09 contribution RG3: CERN, 5 June 2009 Present: 20 people Theme: What can we learn from SNS and the SPL study? Main outcome: Demonstrated the necessity to prototype and perform (cold) acceptance tests of all structures. Decision to work on strong links to both SNS and CERN-SPL RG4: Århus, 9 October 2009 Present: 30 People Theme: Transition (energy) from NC to SC structures RG5: Bilbao, 23 November 2009 Present: 35 People Theme: Beam losses and operational simulations

Design update: ESSS Preparatory work Work with expert group (the ESSS linac reference group) MHz MHz

Many cavities! Approx. 200 cavities, RF distribution is a major part of budget! Minor default => Major problem, big risk Can we keep RF source and distribution budget under or at level with the 2003 design value? Structure Number of Tanks or Cavities Tank or Period Length Frequency RFQ1~ DTL3~ Single Spokes243.9 (4 cavity, FODO) Triple Spoke326.1 (4 cavity, FODO) Elliptical (0.65)40 (SPL : 42)6.2 (4 cavity, Doublet)704.4 Elliptical (0.92)96 (SPL : 200)12.8 (8 cavity, Doublet)704.4

In lay-out pictures

Lay-out of the full segmented linac

RF distribution Option Configuration Cost of 4 cavity (K- Euro) ForAgainst 1 Four cavities per Klystron 2420Fewest power sources Complexity, bulk, power overhead, fault tolerence 2 One Cavity per Klystron2880 Reduced hardware inventory, minimum R&D, fully independent control, minimum RF power overhead, best fault tolerance, easy upgrade to HPSPL Number of power sources 2a One cavity per IOT2520 As above, perhaps cheaper & more compact HPSPL would need doubling of IOTs, or larger rating IOTs 3 Two cavities per Klystron2520Half the number of klystrons Need full hardware set, associated R&D, Power overhead, Reduced flexibility wrt option 2 3-VM Two cavities per Klystron Without VMs 2370 Half the number of klystrons, more economical than Option 3 Risk for higher intensity?

RF test stand in Uppsala

ESS Guidelines (adopted by ESS STC) Starting point is the 2008 ESFRI Roadmap specification Performance parameters Neutron production 30 times SNS today Peak neutron flux 30 times ILL´s average flux Time-averaged flux equal to ILL Electrical power supply 32 MW to 38 MW Accelerator key parameters A proton linac Proton energy range: 1 to 2.5 GeV Pulse frequency range: 10 to 20 Hz Pulse length range: 0.8 to 2 msec Beam power nominal: 5 MW Beam on target: > 95 % reliability Beam loss: ~ 1 W/m Target station key parameters A single target station Cold and cold-thermal moderators A liquid metal target: mercury or lead-alloys, Solid rotating target as fall-back 22 beam ports (11 North, 11 South) or 11 beam ports South and 22 neutron guides North.

Base line for ESS – v0 Technical Design Report with cost to completion for the end of 2012: Proton linac: 5 MW, protons, ms pulse, 20 Hz at 2.5 GeV Aim for 1.0 ms pulse length Priority: i) power couplers (>1.2 MW?), ii) additional cryomodules and/or iii) higher energy Final decision on pulse length to be taken for the TDR Upgradable for higher power (repetition rate or pulse current) and for H MeV Higher energy: Size of moderator Distribution and direction of hadronic cascade

Examples of risks to be addressed High losses in the linac Action: Comprehensive studies of beam dynamics (simulations and theory) Poor reproducibility in cavity performance Action: Quality control during manufacturing and prototyping of a sufficient large number of cavities Limits in cavity performance due to field emission Action: Prototyping and comprehensive tests of complete cryomodule Lower power limit than expected of power couplers Action: Prototyping, sufficient conditioning facilities and contingency in linac design

Writing Group Project plan for the linac design update and prototyping Design Report for the end of 2012 Prototyping will run longer Responsibilities within WG S.Peggs – Beam physics C.Oyon – project planning M. Lindroos – coordination R. Duperrier – System WG schedule and milestones Status report 3 February STC Presentation of project plan 23 April STC Review and audit of Project plan before STC in October

Collaboration model for linac design! Work Package (work areas) 1. Management Coordination (ESS) 2. Accelerator Physics (ESS) 3. Infrastructure Services (Tekniker, Es) 4. SCRF Spoke cavities (Orsay, Fr) 5. SCRF Elliptical cavities (CEA, Fr) 6. Front End and NC linac (INFN, It, TBC) 7. Beam transport, NC magnets and Power Supplies (ÅU, Dk) 8. RF Systems (UU, Se)

Collaboration model: Required A collaboration to share interesting R&D, assure an all European effort and kick start the ESS work A strong Coordination Team in Lund to take the intellectual ownership of the design, to follow the work, to assure good project cost control, and to be responsible for project integration A collaboration board to assure good coordination and to address poor performance Use of common standards, web based documentation, regular reporting and appropriate costing tools Regular reviews of critical path deliverables and even milestones of large work packages (if at a single institute)

Synergies with SPL project at CERN 18

19

 =0.35  =0.15 Spoke resonators  Two 352 MHz (  0.15 and  0.35) fabricated and tested. Half-wave resonators Half-wave resonators  Two 352 MHz (  0.17 and  0.31) fabricated and tested Synergies for linac ALL SUCCESFULLY TESTED !

Conclusions The ESS linac project plan In progress… But at a stage when new partners can join! Looking forward to work together with new and old friends in Portugal