First international Design Review of the MYRRHA accelerator. Spoke Cryomodule Design Bruxelles- 12/13 November 2012 First international Design Review of.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Superconducting Spoke Resonator Cavities and Cryomodules
1 Requirements Conformance for SRF cryomodules October 2014 Lund P. Bosland (on behalf of the CEA/Irfu and CNRS/IPNO teams) ESS elliptical cryomodules.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS cavities interfaces
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Rossana Bonomi ESS Cryomodule Status Meeting, 9/1/2013.
1.3GHz Input Coupler for ILC
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
TIARA PP TIARA Final Meeting 27 th November 2013 – Daresbury TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
1 SLHiPP2013 meeting – Louvain la Neuve Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : +33.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Spoke Cavities developments in Europe CNRS/IN2P3/ IPN– Paris-Sud University Sébastien Bousson On behalf of the IPNO team.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
PIP-II SSR1 Cryomodule Technical Issues Leonardo Ristori TTC Meeting
Status of the beta=0.65 cavity RF desigN
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
WP5 Elliptical cavities
at STFC Daresbury laboratory
T5.2: Harmonization - Material and Component Reference
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
V. Veshcherevich Cornell University
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ESS elliptical cryomodule
Cryomodules Challenges for PERLE
FLUX TRAPPING STUDIES ON LOW BETA CAVITIES
Magnetic shielding and thermal shielding
HWR and Test Cryomodule for China ADS
Presentation transcript:

First international Design Review of the MYRRHA accelerator. Spoke Cryomodule Design Bruxelles- 12/13 November 2012 First international Design Review of the MYRRHA accelerator. Spoke Cryomodule Design Bruxelles- 12/13 November 2012 Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

SUMMARY  Introduction  General Specifications and Overview.  Spoke Cavity Design.  Power Coupler Design  Cold Tuning System Design  Magnetic Shielding Design  Cryostat Design Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

INTRODUCTION The main objectives for the first Mid-Period were :  Preliminary design of auxiliary components Power Coupler- OK (Optimization remains) CTS OK - (Optimization remains) Magnetic Shield - Only conceptual  Preliminary design of spoke Cavity : RF design - OK Mechanical design - in-work (close to completion) Cavity Helium tank - only conceptual  Preliminary design of Cryostat Conceptual design fixed Cryogenic design fixed (in collaboration with ACS Task 4_2) Preliminary Overall sizing – OK Providing a first CAD model of the complete Cryomodule -OK Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

General Specifications and Overview MAX T3_3 = Detailed design of the Spoke CM for End 2013 Two Cells Spoke MHz,  geom = 0.35 T Op = 2 K, P mean loss RF = 10 W P max RF losses fault tolerance ~ 17 W E acc max nominal = 6,2 MV/m E acc max fault tolerance = 8,2 MV/m 2 Cavities per CM P Load = 2 to 16 KW CW. P nominal max = 8 KW P max fault tolerance = 16 KW No Focusing components inside CM P Loss Static = 2K P max cavity helium tank = 1.5 bar P design cavity helium tank = 2 bar Spoke Section Reference pattern Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

SPOKE BAR GEOMETRY : feedback from the two Single-Spoke resonators and Triple-Spoke resonator fabrication (EURISOL) Base (H field area): no racetrack shape  3D weld seams are not easy (Spoke bar-to-cavity body connection) no cylindrical shape  Hpk too high Conical shape is chosen Center (E field area): racetrack shape is ok SPOKE CAVITY (1/4) Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

SPOKE CAVITY (2/4) Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 GOALS Epk/Eacc < 4.4 Bpk/Eacc (mT/MV/m) < 8.3 CST MicroWave Studio 2012 Model created with the 3D CAD tools of MWS Symetries: ¼, BC: Magnetic planes, Tetrahedral mesh, Nb tetrahedrons~ st mode calculated (TM010) Optimisation of a dozen parameter Optimized RF parameters Optimal beta0.37 Vo.T 1 Joule & optimal beta0.693 Epk/Ea4.29 Bpk/Ea [mT/MV/m]7.32 G [Ohm]109 r/Q [Ohm]217 2K for Rres=20 nΩ5.2 E+09 Pcav for Qo=2 E+09 & 6.4 MV/m [W]9.35 Lacc=0.315m=optimal beta x c x f

SPOKE CAVITY (3/4) Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 Epk Bpk Lcav=435mm Next steps: - Qext calculation - Lorentz forces detuning factor - Mechanical optimization

SPOKE CAVITY (4/4) Preliminary mechanical FE simulations (ANSYS) have been performed on Model 0. Tenue to Vacuum (1 bar)50 Mpa (V.M)With Donut stiffener Mechanical longitudinal Stifness5000 N/mm25 Mpa for 1 mm elongation Buckling Critical Pressure2.5 barsSpecification : P max inside helium Tank = 1.5 bars Mechanical Eigen mode60 HzFirst mode with non global deformation  RF frequency shift. (Without Donut Stiffener) Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

POWER COUPLEUR (1/2) WARM WINDOW A Power Coupler 350 MHz, 20 kW CW (designed), 50 . WARM WINDOW Was manufactured, in the framework of Eurotrans and successfully tested at 8 kW (amplifier limitation) CW on a 350 MHz, beta 0.15 Spoke cavity in a Cryomodule configuration. Basis for design 2 CF16 ports for vacuum measurements. 1 port for electron emission measurement pick up 1 water cooling loop Plain Copper Antenna CF 63 on cavity Thermal interception at 70 K (~15 W solid conduction) and ~ 10 K (~3 W solid conduction) The Design (SNS Type) will be kept as if for MAX Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

POWER COUPLEUR (2/2) A conservative outer conductor lenght of 300 mm was taken to start the cryomodule design. Detailed simulations, for the thermal aspects remain to be done. A passive barometric compensation system (ESS Type) was studied in order to balance the atmospheric pressure force between the Coupler and the cavity train. Vacuum vessel assembly flange Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November MHz Coax line Warm Window block Fixation rods to vacuum vessel fixed point) Fixation rods to coupler (mooving point) Barometric compensation bellow Thermal contraction bellow 80 K Thermal interception 5/10 K Thermal interception Same Area

Cold Tuning System One CTS was designed and tested on a Beta = 0.15, 350 MHz Spoke cavity in the framework of Eurotrans. The main parameters ( Cavity RF frequency sensitivity, Stiffness, Helium Tank relevant dimensions…) are similar with the MAX Spoke cavity. This design is taken for the Spoke MAX CTS Design. In addition an optimized design, in term of stiffness, is under study on a similar CTS for ESS 350 MHz Spoke cavities. CTS (CEA ‘Soleil’ Type) for Eurotrans 350 MHz Spoke cavity General studies on reliability (C&C, reliability of stepping motor and reductor) are conducted in the frame of the MAX Task T3_1. The CTS detailed Design will be achieved once the Cavity Helium Tank is completed.. Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Magnetic Shielding No detailled study is done yet on the Magnetic Shielding. No simulation on the magnetic field effect and the sizing of the Shield. As conceptual design we assume that the Magnectic Shield is : - Made of Cryoperm - Cooled down actively - Composed of two skins Cavity Cool Down Phase During Cool down phase the Cryoperm is first cooled and reach the optimal temperature (below 70 K) before the cavity becomes SC. In Stationary operation the shield only attached to the cavity helium tank reach an equilibrium temperature. Assemblies of the different parts of the shield are made with screws  Requires long cooling tube ~ 8 m per cavity. This concept was succefully tested on SPIRAL2 CM B. A more practical concept as trapping the cryoperm inside the Helium Tank may be considered…. SPIRAL 2 Concept Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Cryostat Design / Overview Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 Warm valve (No Cold Valves) Adjustable supporting posts Power couplers Cavity train supporting frame Cryogenic line connection Level measurement and relief valves circuit chimney 2 K phase separator reservoir Cold Tuning System Actively cooled down magnetic shield Barometric compensation 5/10K heat interception loop Copper thermal shield (40/80K 4/3 bars) Sliding and adjustable fixture to cavity train supporting frame (TTF Type) Cavity pumping port Coaxial 350 MHz Line

Cryostat Design / Overview Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 Diagnostics box position and size ?. Longitudinal gain of space is still possible.

Cryostat Design / Assembly – Cold Mass  Inside Clean Room (Iso 4) Outside Clean Room  Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 Cavity + Coupler, first assembled on Clean Room trolley. Different components assembled on the CM suporting frame. This frame goes outside and inside Clean room

Cryostat Design / Assembly - Cryostating Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Cryostat Design / Cryogenic Loops Internal CM circuiteryQT max  Int & L t CD  P max 40/80 K Loop Cool Down (Ghe 4/3 bars)2g/sNC10 mm, 15 m9 hr115 mbar 40/80 K Loop Stationary (Ghe 4/3 bars)110 W86,2 K10 mm, 15 mNC4 mbar  5/10 K Loop (Lhe 3/1 bar)15 W10 KNC1 mbar  Mag. Shield Cool Down (LHe 1,2/1 bar)10 mm, 8 m0.3 hr180 mbar  Cavity Cool Down (Lhe 1,2/1 bar)1,2 hr  Cavity Stationary30 W<10 -1 mbar    Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Cryostat Design / Pressure Security Accident : Insulation Vacuum breakage. Volume LHe ~ 100 litres Surface He loop ~ 2,6 m 2 q = 6 kW/m 2 (CERN, Conservative) m’= 742 g/s T fluid out < 20 K P cav max =1.5 bar 1 x Burst Disk (K=0.6, F = 60 mm) P discharge = 1.33 bar+/- 10% m’ max = 750 T > 20 K 2 x Relief Valve (Circle seal type 500 F 1 ‘’) P oppening = 1.15 bar+/- 5% m’ max (each)= 120 T = 20 K. Prevent overpressure from Cool Down operation, Quench…without breaking the Burst Disk … Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Cryostat Design / Thermo-Mechanical Evaluations Conservative (To Be optimized)Q* 300K  70K Q 70K  2K Q 70K  10K Q 10K  2K Cavity frame- Solid Conduction (With 5K/10K Heat Sink) 22,6 WNC1,6 W0.11 W Power Coupler - Solid Conduction 30 WNC6 W< 0.1 W Beam Tube solid conduction (300K  2K Transition) 1,6 W0,1 WNC Burst disk pipe Solid Conduction (to be evaluated) < 2 W< 0.1 W Thermal radiation (30 layers ; 10 layers ) 30W (6W/m 2 ) 0.2 W (0,06 W/m 2 ) NC Thermal radiation (Beam tubes, measurement chimney) 2,74 W0.1 WNC Thermal radiation Power Couplers (to be evaluated) < 5W ???< 2W ?? Instrumentation, Wiring (to be evaluated) < 5 W< 0.5 W Cavity Frame (To be Optimized)  X  Y*  Z*  300K (100 Kg/Cavity)-0,1/+0,14-0,9/+0,9-0,6/+078 Cold ( 100 Kg/Cavity + thermal contraction)-3,6/+0,2-0,5/+0,5-2/+078 MPa *Require Optimizations Q 70 K < 100 W  To be reduced, Q 5K/10K < 10 W, Q 2K < 3,2 W Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012

Cryostat Design / Accelerator Hall Cross section Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012 Valve box not designed yet. Can be optimized to gain space (parallepipedic instead of cylinder). Height of the hall remains to be checked taking into account handling (tools, strategy…) of the different components. The vertical position of the LINAC depend on other components as elliptical cavity CM. Diameter, coupler lenght and Coupler doorknob and wave guides are in a first approximation compatible with a 1,5 m beam axis height. 700 MHz Elliptical cavity DoorKnob Preliminary LINAC Tunnel Dimensions RF amplifiers, electronic…Hall

Conclusions Spoke Cryomodule Design - H. SAUGNAC - First international Design Review of the MYRRHA accelerator- Bxl 12/13 November 2012  Conceptual and preliminary designs achieved for the main components.  Cavity RF optimization achieved, mechanical optimisation in-work  Components (CTS, Coupler, Cryostat…)optimization to be achieved in June 2013  CAD detailed design & assembly tooling from June  A Spoke cavity prototype without helium tank is planed to be manufactured (order before end 2012…). Cryogenic tests will be performed in 2013 in order to validate the RF Design and the Manufacturing process.