GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.

Slides:



Advertisements
Similar presentations
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Advertisements

Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
SUNY Fredonia Summer 2014 Projects
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Onondaga County CSO Abatement Gray Project Update.
Presented by: Ronald O. Nichols LADWP General Manager
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
IMPROVING COAST WALK TRAIL Friends of Coast Walk Vision-Mission-Actions to Date.
Calvin College Wind Energy Project Engineering 333, Fall 2006 Calvin College Wind Energy Project Engineering 333, Fall 2006 To demonstrate Calvin’s interest.
Storage Tanks Impact on Water Quality and Assessing Performance Presentation 3 April 2015.
Basic Hydraulics Irrigation.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
1 Fork Union Sanitary District Financial Overview January 6, 2010 (Updated for May 5, 2010)
Stormwater Academy: Green Roofs Green Roof Design and Operation Operation (Part IV) 2006 FSA Annual Conference June 14, 2006 By Marty Wanielista and Mike.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Backbone Engineering Clark Larsen, Kendrick Shepherd, and Brett Thomas.
TRILLIONAIRE SCOREBOARD $100 $200 $300 $500 $1,000 $2,000 $4,000 $8,000 $16,000 $32,000 $64,000 $125,000 $250,000 $500,000 $1 TRILLION Click the $ for.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Low Impact Development (LID)
Proposed Retail Rate Change Effective January 1, 2008.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Arlington Park Arlington Park is an improperly maintained and operated sewage treatment lagoon. There are approximately 30+ families using this lagoon.
TOWN OF PENETANGUISHENE PAYETTE RESERVOIR UPGRADES July 24, 2014.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Appeal Tuesday, January 14, Background Appeal Grounds Design Modification Options Community Feedback Staff Recommendation.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Gate Rehabilitation – Phase 1 NS09, NS10 and NS12 Contract C98045C03 Prebid Meeting – Technical Presentation May 9 th, 2013.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
View display boards and speak one-on-one with staff
4th Annual Construction Law Summit
TOWN OF Penetanguishene Payette Reservoir Upgrades
Parkland/Brookdale Interceptor Replacement
Mitigation.
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
Harbour Island Force Main Replacement
Metropolitan Tunnel Redundancy Program Update
Larimer County: engineering
Presentation transcript:

GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012

THE PROBLEM… The Gibson Island Water Storage Tank is Nearing the End of Its Design Life The existing tank is over 40 years old and needs repair  Deteriorated coatings and corroded exposed steel  Deteriorated concrete foundation  Structural defects

FINDING THE BEST SOLUTION… The County Compared Rehabilitation Versus Replacement  The results of a December 2009 engineering study recommended the total replacement of the existing tank.  The study concluded that rehabilitation of the existing tank is impractical given its condition and age.

FINDING THE BEST SOLUTION… The County Investigated Alternative Tank Sites and Configurations  An engineering study was performed to evaluate possible new tank sites and select the most optimal location and configuration.

FINDING THE BEST SOLUTION… The County Investigated Alternative Tank Sites and Configurations  The new tank should be a ground storage tank (non- elevated) to maintain current invisibility to public view.  Only three locations exist on the Island having ground elevations high enough to hydraulically support a new ground level tank

FINDING THE BEST SOLUTION… The County Investigated Alternative Tank Sites and Configurations  Location 3 determined to be least favorable option: Within Critical Area Close proximity to surrounding homes  Location 2 feasible but less favorable option: Within Critical Area Lower ground elevations require taller tank Requires construction of access road and additional system piping

FINDING THE BEST SOLUTION… The County Investigated Alternative Tank Sites and Configurations The results of an August 2011 engineering study concluded:  Location 1 (Adjacent to the existing tank) is the most optimal site  Capacity: 220,000 gallons  Height: 30 feet  Diameter: 36 feet  Material: Coated Steel or Concrete

THE PROPOSED NEW TANK… Existing Tank  Capacity: 173,000 gallons  Height: 25 feet  Diameter: 35 feet  Material: Painted Steel New Tank  Capacity: 220,000 gallons  Height: 30 feet  Diameter: 36 feet  Material: Coated Steel or Concrete

NO IMPACT TO THE ENVIRONMENT…  Once the new tank is completed, the existing tank will be demolished and the area will undergo restorative landscaping  No disturbance within Critical Area  No net loss of vegetative cover

WHAT YOU CAN EXPECT DURING CONSTRUCTION  No noticeable changes to water pressure or water quality  The new tank will remain hidden from view from the road and surrounding residences  Traffic and noise will be minimal during construction

Questions? For general inquiries & further information: Mr. Kyle Massey Presentation will be made available online at: