3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Perfect Competition. Chapter Outline ©2015 McGraw-Hill Education. All Rights Reserved. 2 The Goal Of Profit Maximization The Four Conditions For Perfect.
FURTHER CONSIDERATIONS (By Frank Wood and Alan Sangster, 2005)
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Learning Objectives After studying this chapter, you should be able to: Recognize revenue items at the proper time on the income statement. Account for.
Supply Chain Operations: Planning and Sourcing
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Statement of Cash Flows Chapter 13.
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
Dealing With Uncertainty
1. 2 Duration Duration is the weighted average of the times that the principal and interest payments are made. where t is the time of payment C t is the.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
©The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin Chapter Ten Planning for Capital Investments.
MSE608C – Engineering and Financial Cost Analysis
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Ratio Analysis A2 Accounting.
This week its Accounting Theory
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
Role and Components of Project Evaluation
Other Reporting Issues
BPA FY 2003 Financial Condition Update: Liquidity Tools to Bridge the Gap Confidential – Sensitive Information BPA has a number of liquidity tools to bridge.
Introduction to Bonneville Power Administration
Measuring Financial Performance 1 ENTREPRENEURIAL FINANCE.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Bonneville Power Administration This information is being released externally by BPA on February 9, 2009 as an ad hoc report or analysis generated for.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Financing Activities: Contributed and Earned Capital Shareholders’ Equity: Common Stock Other Paid-in Capital Retained Earnings.
ADVANCED SHORT-TERM LIQUIDITY ANALYSIS Chapter 9.
Hydro Power 102. Hydroelectric Models in the Northwest.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
1 BPA Financial Choices Closeout Presentation for Fitch Ratings November 26, 2002.
Energy Northwest Executive Board Meeting February 27, 2003.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
IMO BUSINESS PLAN Financial Overview September 30, 2003 Regulatory Affairs Standing Committee.
Needles Powers Crosson Principles of Accounting 12e Adjusting the Accounts 3 C H A P T E R © human/iStockphoto.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Chapter 11 McGraw-Hill/IrwinCopyright © 2010 The McGraw-Hill Companies, Inc. All rights reserved.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Cost Management Session 3. Overview Theory Exercise: 1.39; 1.42; 1.50;
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
Analyzing Financial Statements
Bonneville Power Administration Significance of Rating Agency Ratings May 2002 Predicisional.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Personal Finance Chapter 13
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Pre-decisional page 1 (for discussion only) Roy Fox, BPA Enterprise Risk Manager January 28, 2005 Fish Cost Components Workshop PBL Rate Case Risks and.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Northwest Power Planning Council Review of Bonneville’s fish and wildlife funding and cost management strategies Briefing to the Northwest Power Planning.
Profitability Analysis
California Product Offerings
Reporting and Interpreting Sales Revenue, Receivables, and Cash
Tutorials Amsterdam Business School
Overview of Working Capital Management
© OnCourse Learning.
Chapter 8 Overview of Working Capital Management
Presentation transcript:

3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent of water condition. With Slice, BPA’s revenues will vary less with varying water conditions. If BPA signs Slice contracts, BPA’s ability to meet its treasury payment obligations under poor water conditions should improve. This comes at the expense of higher revenues during times of above average water conditions. Slice Impacts on BPA’s Revenues dampening effect Net Revenues w/o Slice (traditional) Net Revenues after Slice Increasing Water Supply BPA Net Revenues

3/16/20002 Slice Customer Profiles Three utilities were randomly selected for detailed evaluation –Utility A gets 14% of its load served by BPA (which translates to 1.0% Slice). –Utility B gets 80% of its load served by BPA (which translates to 1.1% Slice). –Utility C gets 65% of its load served by BPA (which translates to 3.8% Slice). For each customer three charts are provided to profile how Slice would work for the customer. –A chart of the customer’s Net Requirement overlaid with three different levels of Slice (low, average, and high) –A chart that shows the sensitivity of the customer’s cash flow to the timing of the runoff. –A chart that shows the customer’s accumulated cash flow for high, median, and low water conditions. The Accumulated Cash Flow graphs represent (throughout the year) how the customer’s accumulated benefit/cost compares to the alternative of serving its Net Requirement with PF (please note that contract and risk management expenses as well as transmission costs on surplus Slice sales have not been reflected and would lower the net benefits even further)

3/16/20003 Accumulated Cash Flow The Accumulated Cash Flow graphs represent (throughout the year) how the customer’s accumulated benefit/cost compares to the alternative of serving its Net Requirement with PF. Accumulated cash flow is similar in concept to a checking account balance, if by July the result is positive the customer would have a net benefit from Slice for the year. These charts are based on hydro-regulation and market price assumptions similar to those used in BPA’s ‘02 Power Rate Case. Hydro-regulation studies simulate the operation of the Federal resources under the reoccurrence of 50 historical water conditions ( ). Although BPA has attempted to do a comprehensive economic analysis, certain costs have not been included that would have an impact on the overall economics (excluded expenses include contract implementation, risk management, as well as transmission costs on surplus Slice sales)

3/16/20004 Slice Requirements/Surplus Deliveries Customer A Customer A gets 14% of its load service from BPA. The filled in area is the requirements portion of Slice. The surplus portion of Slice is shown for high, average, and low water. The customer’s Net Requirement is indicated by the heavy line.

3/16/20005 Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer A Customer Customer's ability to realize secondary revenue credits similar to that of PF customers is a function of market prices, the water supply, as well as the timing of the runoff. This graph illustrates for two pairs of similar water conditions (very high and slightly below average) how much effect the timing of the runoff has.

3/16/20006 Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer A This graph illustrates the Customer’s accumulated cash flow for three different water conditions. The Customers net benefit/cost for the year was sorted from highest to lowest, the water years selected were the 2nd highest benefit, the median, and the 2nd worst cost.

3/16/20007 Slice Requirements/Surplus Deliveries Customer B Customer B gets 80% of its load service from BPA. The filled in area is the requirements portion of Slice. The surplus portion of Slice is shown for high, average, and low water. The customer’s Net Requirement is indicated by the heavy line.

3/16/20008 Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer B Customer's ability to realize secondary revenue credits similar to that of PF customers is a function of market prices, the water supply, as well as the timing of the runoff. This graph illustrates for two pairs of similar water conditions (very high and slightly below average) how much effect the timing of the runoff has.

3/16/20009 Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer B This graph illustrates the Customer’s accumulated cash flow for three different water conditions. The Customers net benefit/cost for the year was sorted from highest to lowest, the water years selected were the 2nd highest benefit, the median, and the 2nd worst cost.

3/16/ Slice Requirements/Surplus Deliveries Customer C Customer C gets 65% of its load service from BPA. The filled in area is the requirements portion of Slice. The surplus portion of Slice is shown for high, average, and low water. The customer’s Net Requirement is indicated by the heavy line.

3/16/ Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer C Customer's ability to realize secondary revenue credits similar to that of PF customers is a function of market prices, the water supply, as well as the timing of the runoff. This graph illustrates for two pairs of similar water conditions (very high and slightly below average) how much effect the timing of the runoff has.

3/16/ Slice Impacts on Customer’s Accumulated Cash Flow ( within the year ) Customer C This graph illustrates the Customer’s accumulated cash flow for three different water conditions. The Customers net benefit/cost for the year was sorted from highest to lowest, the water years selected were the 2nd highest benefit, the median, and the 2nd worst cost.

3/16/ Slice System Obligations The amount of Slice power delivered to a customer is indexed to the generation of the Federal Base System after all System Obligations of the Federal System are satisfied. This is being done to prevent the Slice customer from avoiding the impacts of BPA’s System Obligations. By taking System Obligations off the top, the Slice customers assume their proportionate share of the impacts of the System Obligations. The net of all these obligations will reduce the total power they have available under the Slice contract.

3/16/ Slice System Obligations Cont. Canadian Entitlement - The Canadian Entitlement is an obligation of the United States to return one- half of the benefits in the United States that result from building Mica, Arrow and Duncan Dams in Canada. These benefits increase over the life of the Slice contract. To satisfy this obligation, the Slice customers will receive less surplus energy over the life of the Slice contract. Hourly Coordination - The Hourly Coordination increases the efficient operation of Grand Coulee through Priest Rapids Dams. There is a constant exchange of energy between Bonneville and the owners of Wells, Rocky Reach Rock Island, Wanapum and Priest Rapids Dams. At times, Bonneville will receive energy and at other times, Bonneville will deliver energy. To satisfy this obligation, the Slice customers will need to be prepared to have their entitlements under Slice adjusted consistent with the impact to Bonneville. This will reduce their ability to market a portion of their Slice energy more than an hour in advance. Pacific Northwest Coordination Agreement (PNCA) - The PNCA increases the efficiency of all projects in the Northwest, both Federal and non-Federal. It provides certain rights and obligations, which vary over time, to all generating utilities in the Northwest. A Slice customer’s entitlement to Slice energy will be increased when Bonneville receives energy under the PNCA and decreased when Bonneville delivers energy under the PNCA. The Slice customer has no independent rights under the PNCA but must do whatever Bonneville chooses to do under the PNCA (receiving or delivering energy).

3/16/ Slice System Obligations Cont. Non-Treaty Storage Agreement (NTS) - The NTS utilizes storage space at Mica and Arrow Dams in Canada. The Slice customers have no direct rights under the NTS but must do whatever Bonneville chooses to do under the NTS (receiving or delivering energy). Biological Opinion - The Biological Opinion will reduce the generating capability in certain times of the year to promote the rebuilding of the fishery stocks in the Northwest. Having the Biological Opinion be a System Obligation prevents the Slice customers from getting out of the Federal System reductions for fish. System Commitments to the Transmission Business Line (TBL) - The TBL is the load control operator for most of the Northwest. The Federal System provides all the necessary inputs to maintaining the reliability of the energy deliveries to the Northwest. The Slice customers will be obligated to provide their share of this obligation that will reduce the amount of surplus they receive under the Slice contract.

3/16/ Proposed Slice Ten-Year Contract Minimum Normal Subscription contracts are being offered for 3, 5 or 10-year periods. BPA expect that the Slice contract will only be offered for a 10-year period. Slice shifts the risks that Bonneville faces directly (including weather, water supply variability, and fish costs) to the Slice customer. Over a 10 year period, BPA and the Slice purchaser can expect a balancing of those risks. A shorter term would be less likely to experience that balance. The Slice contracts will include a right for the customer to convert all or a portion of the customer’s Slice requirements purchase to other Subscription products if the contract is non-functional (i.e. if FERC doesn’t approve Slice rate or if future Slice rate is inconsistent with FERC approved Slice rate methodology, not “if the product is uneconomic”)