February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.

Slides:



Advertisements
Similar presentations
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Advertisements

ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
4th Electron-Ion Collider Workshop, Hampton University, May BNL R&D ERL and Coherent Electron Cooling test at RHIC Outline Goals of R&D ERL.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
EIC Meeting, Stony Brook University, January 10, 2010 Dmitry Kayran for MeRHIC group EIC Meeting January , 2010 MeRHIC: Injection System.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Low Emittance RF Gun Developments for PAL-XFEL
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Dmitry Kayran Beam commissioning.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
Beam Dynamics in MeRHIC Mike Blaskiewicz On behalf of MeRHIC/eRHIC working group.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Parameter [units]Tune-up beam"low" chargehigh currenthigh charge Kin. injection energy [MeV]2.0 – Maximum beam energy [MeV]16 –
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
An Electron source for PERLE
Beam Commissioning Adam Bartnik.
Beam dynamics simulation with 3D Field map for FCC RF gun
Plans of XFELO in Future ERL Facilities
Options and Recommendations for TL and Dumps
Have a chance to operate your own beam at CERN
WP11: electron and proton beam testing
DC Injector and Space Charge Simulation Status
Joint Accelerator Research JGU & HZB
ERL High-Current Technology
Thermal emittance measurement Gun Spectrometer
LCLS Gun Commissioning Status & Plans David H
Magnetized Electron Beam for Ion Cooling at JLEIC
Electron Source Configuration
R. Suleiman and M. Poelker October 12, 2018
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
MEBT1&2 design study for C-ADS
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Update on ERL Cooler Design Studies
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D ERL R&D: G5 test and Commissioning Plan

February 17-18, 2010 R&D ERL Dmitry Kayran Why we are doing the G5 test? G5 test is first stage of ERL commissioning –Most of all ERL components can be tested during G5Test Will demonstrate of high brightness SRF Injector operating The high energy at the end We will measure: »Projected emittance in both planes »Bunch length and longitudinal tails »Slice emittance »Energy spread To have a base line for comparison of straight line and z-bend merger system performance

February 17-18, 2010 R&D ERL Dmitry Kayran G5Test: Components SRF Gun and 5cell cavity, Cryosystem for both 1MW Klystron and 50kW RF power supplies, LLRF Vacuum chambers, pumps, control Cathode, Deposition System, Transport Car, Laser, Laser Control Magnets and Power Supplies: HTS solenoid, solenoids, steering dipoles, quadrupoles, 14° dipole (ERL 60° dipole will be used) Instrumentation: beam profile monitors, beam position monitors, beam current monitor

February 17-18, 2010 R&D ERL Dmitry Kayran ERL setup

February 17-18, 2010 R&D ERL Dmitry Kayran G5 setup: no ERL loop in place, low average power

February 17-18, 2010 R&D ERL Dmitry Kayran Main parameters Charge per Bunch: nC Gun Energy: MeV Maximum Energy: 20 MeV Max. Average current: 500 nA Max. Rep Rate: 100 Hz Average Power: < 10 W First stage: G5 test setup SRF 5cell cavity SRF Gun Triplet Beam Profile Monitor Dipole Solenoids

February 17-18, 2010 R&D ERL Dmitry Kayran Electron beam parameters and regimes for G5test Start-upBase lineHigh charge CathodeCooperMulti-Alkaline Long. Pulse shape (FWHM)12 psec Sin(x)/x50 psec flattop70 psec flat top Trans. Pulse shapeGaussian2.5 mm sharp edge3 mm sharp RF frequency MHz Operational regemPulses of trains Rep. rate in train9.383 MHz Train length100 pulses Trains rep. rate0-1 Hz Charge per bunchupto 50 pC1.4 nC5 nC Gun kinetic energy2.0 MeV 2.5 MeV Max. Energy20 MeV Max average current0.001 mA Max average power20 W

February 17-18, 2010 R&D ERL Dmitry Kayran Quad Scan / Energy Analyzer At 20MeV two operational modes: 1.Straight ahead –projected emittance –transverse halo 2.With the bend –bunch length / long. halo /energy spread –slice emittance GUN S FCT Halo monitor S 5 cell RF - BPMs FC ERL quad triplet quad interchangeable screen/slit 0.3 m 14º - OTR/YaG screens Pepper-pot S Plan to do at low energy - Cathode QE and Cathode lifetime in SRF gun - Slice emittance - Projected emittance - Halo studies

February 17-18, 2010 R&D ERL Dmitry Kayran Achievable emittance (simulations) Gun 5-cell Solenoids (the last one is off) 1.4nC, BC L: 12º RF E: 2 / 16.7 MeV  : 1.3 µm 1.4nC Realistic L: 12º RF E: 2 / 16.7 MeV  : 2.3 µm 5nC, BC L: 14º RF E: 2.5 / 17.2 MeV  : 1.7 µm T c =0.4 eV Pepper-pot

February 17-18, 2010 R&D ERL Dmitry Kayran High-energy part Two operational modes: Straight ahead –projected emittance –transverse halo With the bend –bunch length / long. halo –slice emittance ERL quad 3let ERL quad 2let interchangeable screen/slit 16º Last flange of the 5-Cell Cavity YaG/OTR viewers

February 17-18, 2010 R&D ERL Dmitry Kayran Straight ahead path ERL quad triplet Last flange of the 5-Cell Cavity 0.25 m0.728 m1.7 m Observation station: expected min. rms. beam size ~ 130 μm. (Resolution ~55 μm) All triplet quads ON : G1=70.3, G2=-117, G3=66.6 G/cm (G max =400 G/cm) Beta-functions simulated by Parmela (All energies) and MADX (Cent. Energy only) Beam kinetic energy (MeV, Parmela): E ref =16.77 E max =16.8 (+0.2%) E min =16.2 (-3.4%) BC, 1.4 nC

February 17-18, 2010 R&D ERL Dmitry Kayran Quad Scan: projected emittance Energy spread within the beam was a concern Only one quad of the 3let is used. Two other quads are off. Distribution: q=1.4 nC, BC. Vertical quad scan 2 nd quad scanned σ y, min =180 µm X max =±1 cm  y (PARM)=1.35e-6  y (“MEAS.”)=1.4e-6 Horizontal quad scan 3 rd quad scanned σ x, min =130 µm Y max =±1 cm  x (PARM)=1.35e-6  x (“MEAS.”)=1.41e-6

February 17-18, 2010 R&D ERL Dmitry Kayran The bend: energy and slice emittance ERL quad 3let ERL quad 2let interchangeable screen/slit 16º Last flange of the 5-Cell Cavity YaG/OTR viewers Nominal 3letx 1.1 nom. strengthx 0.9 nom. strength Triplet+dipole strongly focuse horizontally, regardless energy, providing good resolution

February 17-18, 2010 R&D ERL Dmitry Kayran Phase shift and slice cut Y vs X X vs Z 1 mm slit cuts a few degree slice Energy vs phase for 173º and 193º RF phase slit

February 17-18, 2010 R&D ERL Dmitry Kayran Slice parameters of misphased beam Optical functions show almost no difference for misphased beam. (Only X functions shown) Normalized slice emittance. No difference for misphased beam. (Only X emittance shown) Requirement for slice parameter measurements: Off-cresting should not strongly affect slice emittance and optical functions Slice  ’s and  ’s Slice normalized emittance

February 17-18, 2010 R&D ERL Dmitry Kayran Quad scan after bend  =3.5 m,  =-3.5, dp/p=0  =2 m,  =-2, dp/p=-0.1  =7 m,  =-7, dp/p=+0.1  =2 m,  =-2, dp/p=+0.1  =7 m,  =-7, dp/p=-0.1 Scheme is capable of accepting a large spread of initial optical functions Only vertical slice emittance is measured. Horizontal?

February 17-18, 2010 R&D ERL Dmitry Kayran G5test: conclusions G5 test will allow to check all majar components of R&D ERL gun, 5-cell cavity, diagnostics, control and other Developed G5 test + instrumentation will be good enough to measure Beam parameters : Projected Emittance Slice emittance for different time slices Bunch length and longitudinal tails

February 17-18, 2010 R&D ERL Dmitry Kayran BNL R&D ERL Status: complete (more about ERL status Schedule tomorrow) Design of major ERL components is completed. Hardware components are being manufactured and/or procured. ERL Enclosure (Vault) was constructed (2005) 5-cell Cavity is being processed and tested at JLAB, installed at 912. First cool down T=2K in March First Horizontal Cold Emission Test April 2009 The preparation chamber for SRF gun photo-cathodes under vacuum studies 1 MW Gun klystron (for SRF gun) including circulators and dummy loads installed, tested for full power 1MW 50 kW (for 5 cell 20 MeV SRF linac) installed, tested Recirculation loop magnets and injection line magnets have arrived and measured. Magnets power supplies were delivered/ installed. Loop vacuum system components have been delivered.

February 17-18, 2010 R&D ERL Dmitry Kayran BNL R&D ERL Status (count.) : RF control will be based on the new digital RHIC LLRF. The LLRF system is currently under development. (CET will use PLL based LLRF and move to digital LLRF then one is available). Machine protection system and control system (for CET) is installed/tested operational since April 2009 Laser room completion (April, 2009) Laser Gun drive laser arrived/installed/tested in May-June, 2009) G5 test additional components are designed/ordered (June 2009) Gun has been built at AES (November 2009) now is under vertical CETest in JLab to do list.. –SRF Gun Horizontal Cold Emission Test at BNL February 2011 –The magnets, vacuum system components G5 test will be installed during 2010 –ERL Extraction line component, magnets, vacuum chamber under design ( summer 2010)

February 17-18, 2010 R&D ERL Dmitry Kayran Commisionnig plan: ERL fully operational in 2011 We start commissioning of the R&D ERL in cell SRF cavity cold emission test (first cool-down March, ) First, we develop the straight pass (gun -- 5 cell cavity -- beam stop) test for the SRF Gun performance studies. (Beginning of 2011) #Metal cathode (low charge per bunch) #Multi-Alkaline Cathode (up to 5nC per bunch) # Will operate in train mode 10 MHz bunches in the train with: max duty factor 2E-5. maximum average current 1 μA, max average power to the beam dump 20 W Next, a novel concept of emittance preservation in a beam merger at the lower energy will be tested ( 2011) After recirculation loop completed, demonstrate energy recovery of high charge and high current beam. The prototype will serve as a test bed for studying issues relevant for very high current ERLs (end of 2011 ) Proof of principle coherent electron cooling ions in RHIC at ~ 40 GeV/n is feasible with existing R&D ERL parameters ( ERL available around 2012 )

February 17-18, 2010 R&D ERL Dmitry Kayran 2-3 MeV 20 MeV 2-3 MeV SC RF Gun SC 5 Cell cavity Beam dump BPM DCCT 1MW Klystron SRF Linac 50 kW Transmitter ready to operate Arc assembly QuadrupoleDipole Tested in BLD912 ready for gun First cool- down, March, 2009 T=2K Measured, ready to be installed BNL R&D ERL: in pictures

February 17-18, 2010 R&D ERL Dmitry Kayran Thank you! After the next talk there will be R&D ERL facility tour starts today at 10:50 a.m.