Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.

Slides:



Advertisements
Similar presentations
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Goshen Area Bus Reconfiguration
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Recent ERCOT Events Lessons Learned
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Load Shed Service for Import Information Session Market Services April 17, 2014.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
WECC and NERC Protection Criteria and Standards
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Demand Response in Midwest ISO Markets February 17, 2008.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Peak RCCo Performance Metrics Draft –November 2013.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Reliable Power Reliable Markets Reliable People Demand Response in Alberta’s Wholesale Electricity Market Demand Response Working Group Kick Off Meeting-
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
Ancillary Services Market at Watt-Ex. 2 WHAT ARE ANCILLARY SERVICES?  Maintain stability of electricity grid  Dispatched by the System Controller (AESO)
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Market Participant Experiences with Demand Side Bidding and Future Direction Linda Roberts, EA Technology Richard Formby, EA Technology.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Operations Report Kent Saathoff System Operations ERCOT.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Renewable Energy Challenges: System Stability
Wind Management at MISO
Black Start Overview.
Phase Angle Limitations
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Energy and Ancillary Services Design Stream Working Group Meeting 6
Project WECC-0100 Update Load Modeling Task Force
Solar Eclipse Overview August 2017
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Project WECC-0100 Update Load Modeling Task Force
Planning Reserve Margin
Solar Energy Commercialization
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment Jerry Mossing Director, Operations Planning Paul Barry Director, Market Services

2 Purpose Provide information to the Demand Response Work Group (DRWG) that helps the group understand : –what operational situations that may require resources to manage, –What resources are currently available, –How these resources are used, and –Experience to date Opportunity for the DRWG to ask questions and provide feedback.

3 AESO Operations Concern There is a strong possibility that sometime in the next several years; –transmission constraints may increase, Delays in north south, south west, etc. –supply shortfall events may be more frequent, LTA metrics indicate decreasing supply margin however no trigger action at this time –wind’s fast down-ramps exceeding system ramp up capability. MOF implementation underway. Approximately 11,000 MW in the queue. –Each of these operating situations: will be managed using procedures that ultimately end in manual load curtailment procedures. (e.g. OPP 5xx, OPP 801, etc.) contains a gap between the point where supply runs out and manual (involuntary) load curtailment is necessary. The gap is demand response.

4 AESO Operations Price responsive loads acting independently have an impact to the energy market –Independent action by a significant amount of load in response to System Marginal Price (SMP) has a direct impact to AIES supply demand balance. –Regulating reserve volumes may mask some of the effect but most often a generator dispatch is required. –System Marginal Price changes with generator dispatch –The cycle may repeat, depending on many factors including volumes and prices in the merit order

5 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time

6 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time No requirement to be in the merit order Independent action by load(s) has a direct impact to the supply/demand balance and will cause generator dispatch and SMP will change E.g. An unintended consequence - 50 MW need for supply could result in 300 MW load response

7 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time Manual processes involving phone calls and paper. Doesn’t scale to large number of participants No measurable response other in real time The program exists but no MW (only kW)

8 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time Inter-ties – emergency energy agreements Many steps, not many MW LSS, DOS are likely price responsive loads 3% voltage reduction, pleas, non-essential loads = fluff

9 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time AESO directs DFO curtailment volume as a percentage of load. DFO procedures identify load breakers to trip. TFOs carry out the procedures as they have 24/7 control. SCADA required to be effective in 10 minutes. Load curtailments may be rotated between breakers during longer duration events. The breakers used in these procedures must be coordinated with UFLS (so as to preserve load in some of the UFLS blocks) This is typically when the terms rotating outages or brown outs are used, even for short duration events.

10 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time Under frequency event caused by BC tie line trip during high BC import Also used when Alberta is islanded Automatic action, load breakers are tripped by relay (either UF or tie trip) Allows operating criteria to be met while enabling high BC imports though preventing firm load loss for N-1. LSS loads may be price responsive.

11 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time Safety net for extremely large loss of generation This is the last automatic action to keep the system up before generators trip to protect their equipment. WECC requirement The breakers used in these procedures must be coordinated with manual load shed procedures (so as to preserve some load in the manual load shed blocks)

12 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time Contingency Reserves WECC requirement No concurrent use Technical requirements well defined, including performance requirement

13 Current Load Response Supply Shortfall Transmission Constraint (Downstream or Load pocket) Wind Fast Ramp Down High Import Large Loss of Generation (Alberta or in WECC) Loss of One Generator Operating SituationENMO & ASMOProceduresLast Resort PRL VLCPInter-ties LSSSUPL Involuntary Curtailment Involuntary Curtailment Involuntary Curtailment ILRAS LSS UFLS SUPL UFLS Fluff DOS EOSTrigger DTS Time The possibility exists that in the next few years supply shortfall, transmission constraints and wind power ramps will result in more frequent involuntary curtailment. No reasonable mechanism or program exists to fills this gap. Demand response programs that establish loads who can voluntarily curtail load prior to involuntary curtailments seems a reasonable approach to preserve reliability and FEOC? Can a comprehensive demand response program be implemented in time? When exactly is the need? Whose job is it?

Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Commercial Experience

15 AESO Commercial Experiences Load Participation –20MW for supplemental reserves –120MW for under frequency mitigation –An incremental 100MW expressed interest recently in providing an under frequency mitigation service Majority of dealings with pulp and paper related customers AESO yet to contract with a Demand Aggregator Up to 240MW for ILRAS during supply shortfall events * VLCP – created by way of EUB Negotiated Settlement in 2000 to balance supply/demand – no longer used * DOS – alleviates abnormal conditions (* not AESO Commercial dealings)

16 Questions/Comments on Implementation

Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Thank you!