Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Will CO2 Change What We Do?
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Capacity Valuation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
Modeling and simulation of the Power Energy System of Uruguay in 2015 with high penetration of wind energy R. CHAER*E. CORNALINOE. COPPES Facultad de Ingeniería.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
California Energy Commission Workshop Nuclear Power Plant Issues
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Avoided Costs of Generation
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Wholesale Power Price Forecast 01/28/03 Current Trends Update Jeff King January 31, 2003.
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Resource Adequacy Technical Committee Meeting April 6, 2011.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Resource Adequacy Steering Committee Meeting October 4, 2011.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
Northwest Power Planning Council, January 2001 Electricity Price Forecast Sensitivity Analysis Jeff King Regional Technical Forum January 9, 2001.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
Power System Marginal CO2 Production Factors Jeff King Northwest Power and Conservation Council Presented to the RTF April 18, 2006.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Demand Response in the 7th Power Plan
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
Study Results Drought Scenario Study
Planning Reserve Margin
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation to Joint WEIB/CREPC Meeting April 23, 2003

Western System Adequacy2 The concern, exemplified by Northwest capacity additions

Western System Adequacy3 Purpose of this assessment To explore an approach for relatively quick assessment of future system adequacy. To assess near-term (through 2006) conditions using this approach. To identify information needs and availability to support this type of assessment.

Western System Adequacy4 What are we measuring? Index of unserved energy Forecast unserved energy by month as fraction of annual average load. A comparative measure of adequacy. Not greatly meaningful in absolute terms. Reserve margin Difference between monthly peak load and supply capacity, divided by monthly peak load. Not quite, but close to “Planning Reserve” convention. Has comparative value; probably some absolute significance as well.

Western System Adequacy5 The modeling tool The EPIS AURORA © Electric Market Model, a proprietary computer model of the western power system. Forecasting future resource additions Test resource cost-effectiveness through iterative dispatch runs. Plants having uneconomic going forward costs are retired. New units having positive net present value are added. Model seeks a least-cost resource mix. Forecasting power prices Calculate hourly market clearing prices by load-resource area. Hourly area price = variable cost + dispatch premium of most expensive resource required to meet load for that hour.

Western System Adequacy6 Geographic Scope 16 load-resource areas, defined by transmission bottlenecks Individual generating units (~3300) Fuel price forecasts for ea. LRA Load forecast for ea. LRA Load curtailment blocks for ea. LRA Transmission capacity, losses & costs between LRAs New resource options for ea. LRA

Western System Adequacy7 Modeling approach (1) The primary output of the model is wholesale prices. However, the following (& more) are available on an annual, monthly and hourly basis. Loads Supply (capacity & capability) Fuel use Emissions Transmission loading Curtailment The latter is of particular use for this assessment

Western System Adequacy8 Modeling approach (2) Set up AURORA © input data sets to simulate the WECC system for years 2000 through began with Power Council database ca: Jan 2003 reviewed & updated NPPC database, focusing on resource additions & retirements. WRAT members very helpful. Base case hourly resource dispatch poor Northwest hydro conditions calculated unserved load Ran variations on the base case that considered plausible developments that might impact ability to serve load.

Western System Adequacy9 Base Case assumes poor Northwest hydro Northwest hydro approximating 2001 for each study year. Projects under construction are completed as scheduled. Projects scheduled for retirement are retired as scheduled. Operating reserve (non-dispatchable) - 6.5% for each LRA NPPC medium load growth forecasts. EPIS AURORA default seasonal & daily load shapes. SBC and RPS resource additions (CA, MT, OR, NV, AZ). Transmission upgrades (between AURORA L/R areas): P15 (3950 > 5400MW between ) S. CA - Baja (408 > 1361MW in 2005)

Western System Adequacy10 Base Case Loads

Western System Adequacy11 Base Case resource additions & retirements

Western System Adequacy12 Base Case: no shortfall potential evident through 2006

Western System Adequacy13 Sensitivity cases A - C A. Some projects scheduled for completion are not completed. Asmp: Post-03 completions not achieved (-4373 MW). Result: Small shortfall potential in B. Retirements in addition to those currently announced. Asmp:Economic retirements from AURORA capacity addition study (-420 MW). Result: No significant change from Base Case. C. RPS/SBC additions are less than forecast. Asmp:RPS/SBC additions 50% of forecast (-975 MW). Result: No significant change from Base Case.

Western System Adequacy14 Sensitivity cases D - F D. Reduced availability of non-hydro resources. Asmp: Non-hydro FOR increased by 2% (-2590 MW in ’06). Result: Small shortfall potential in E. High load growth. Asmp: Load growth rates increased by 1%/yr. Result: Shortfall potential appearing in 2004, significant by F. Plausible combination of “downside” factors. Asmp: Base + combo of downside sensitivities. Result: Shortfall potential appearing in 2004, very significant by 2006.

Western System Adequacy15 High load growth: Incipient shortfall potential evident beginning summer 2004

Western System Adequacy16 Plausible Combination of downside factors: significant shortfall potential by 2006

Western System Adequacy17 Plausible Combination of downside factors: Potential shortfall by WECC subarea

Western System Adequacy18 Reserve margin under plausible assumptions suggests return to 2000 conditions

Western System Adequacy19 Findings & Observations Shortfall potential comparable to 2000 might return by 2006 under plausible conditions. Summer problem in all WECC areas Winter problem as well in Northern areas Results are sensitive to load recovery & growth assumptions While the comparative results of the approach are probably reasonably indicative, the absolute estimates of shortfall are much less certain Hydro capability is a significant uncertainity.

Western System Adequacy20 Observations regarding data needs Good information regarding resource additions, retirements and loads are tough to come by. CA & Northwest data generally available, other areas more difficult. Needed information re planned additions & retirements: name type capacity status (in-service, active construction w/service date) anticipated service date general location Consistent, unique plant nomenclature would be helpful.