Budget Shortfall Options Ian Wyatt - Atkins JIP on Bursting Disks for Shell & Tube Exchangers – 2 nd Stakeholders Meeting.

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Positive isolation of dangerous fluids is providing a safe environment during.
Advertisements

Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
BakerRisk also has the ability to utilize other software tools to complete a full flare system analysis: ChemCad® Dynamic flare header hydraulics Flare.
Potential Benefits of Small-scale Distributed Generation: A Case Study Proposed project for partial fulfilment for a Master of Technology Mandy Armstrong,
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
ENVIRONMENTAL MANAGEMENT PLAN
Introduction to Safety Relief Systems
Promoting Energy Efficiency In Buildings in Developing countries.
The views expressed in this paper are those of the individual authors / presenters and are not intended to represent the views or position of BP on the.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Gas Lift Production – Impact on Tubular Connections Presented by Gloria A. Valigura, Shell International E&P Patrick E. McDonald, Mohr Engineering, a div.
STHE Overpressure Protection
Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam at the desired temperature and pressure.
Pipeline Qra Seminar Title slide Title slide.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
1 Investor 27 Oct Overview i2O offers a solution to huge problem of water leakage Managed service with recurring revenue Seeking £4m to reach.
Heat Exchanger & Classification Prepared by: Nimesh Gajjar
A Presentation on HEAT EXCHANGER DESIGN
ISO OPERATIONAL CONTROL
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
Fermilab requirements and recent FEA Analyses PH-DT Engineering Office, CERN 06/05/2015 Page 1 CERN, May 6th 2015.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
All images © Mat Wright Ensuring quality – what can be learnt from the UK and the rest of Europe? Santiago June 2014 Geoff Fieldsend.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
The Family of Shell and Tube Heat Exchangers P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Family members with Simple Geometrical.
DEVELOPING FIRE TESTS FOR FCV AND HYDROGEN VEHICLES Glenn Scheffler Consultant for the US Department of Energy August 2010 DEVELOPING FIRE TESTS FOR FCV.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
DETERMINE Working document # 4 'Economic arguments for addressing social determinants of health inequalities' December 2009 Owen Metcalfe & Teresa Lavin.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
R 2.09/96, LBB of VVER-1000 NPP TACIS Project: R8.01/98 - DISSEMINATION OF RESULTS: "TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS" Tacis R2.09/96, “LBB.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 Original ATE brake force reducing valves Double the control options – mechanical, hydraulic.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Materials Integration by Fission Reactor Irradiation and Essential Basic Studies for Overall Evaluation Presented by N.Yoshida and K.Abe At the J-US Meeting,
Safety-related Issues for the Disposal of Intermediate Level Waste (ILW) Dr. Jürgen Wollrath Federal Office for Radiation Protection (BfS) Department Safety.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Land Use, Land Use Change and Forestry (LULUCF) European Commission expert group on forest fires Antalya, 26 April 2012 Ernst Schulte, DG ENV on behalf.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
22 March The Institute of Petroleum’s “Guidelines for the Design and Safe Operation of Shell and Tube Heat Exchangers to Withstand the Impact of.
Green Initiative for energy efficient eco-products in the construction industry GREEN-IT Project: EIE Acronym: GREEN-IT Duration:
Thermag VII, Turin, Italy
Advanced Post Graduate Program in Piping Design & Engineering with PDMS & CAESAR-II
PRESSURE CONTROL VALVES (PCVs)
M. Z. Bezas, Th. N. Nikolaidis, C. C. Baniotopoulos
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Table of Contents: Design
ISO New England System R&D Needs
Safety Valve Suppliers inn UAE | Ali Salman Trading Company
Modelling Internal Arc
Nick Bonvoisin Secretary to the Convention on the
Maintenance Apart from safety, maintenance is needed to keep plant in an acceptable condition. Maintenance of this kind must be reviewed on an economic.
ESS elliptical cryomodule
Integrated River Basin Management
Strategic Environmental Assessment (SEA)
Chapter RESOURCE ACCESS AND DEVELOPMENT
Presentation transcript:

Budget Shortfall Options Ian Wyatt - Atkins JIP on Bursting Disks for Shell & Tube Exchangers – 2 nd Stakeholders Meeting

Heat Exchanger Design - Essential HE 1. Establish design criteria and engineering analysis requirements to assess if guillotine fracture is credible based on the following: The mechanical properties of the materials of construction used in heat exchanger tubes, baffles, etc. Degradation of the materials through corrosion or erosion. Minimum tube thickness specification required to prevent guillotine fracture. Vibration analysis to ensure that the likelihood of guillotine fracture is minimised. Sensitivity analysis of process variations which should be carried out as part of the engineering analysis to ensure that the design is robust, e.g. flow, pressure, temperature etc. Gathering industry heat exchanger data.

Heat Exchanger Design - Essential HE 2. Establish design criteria that determine when transient effects need to be considered for overpressure protection of STHEs: Determine if differential pressure limits can be established below which transient effects from a tube rupture can be ignored. Determine the maximum allowable transient overpressures (peak pressure and duration) in the shell, under tube rupture conditions, below which fast acting pressure relief is not required. Extend the University of Sheffield work on heat exchanger stress distribution. HE 3. Determine the impact of transient loads on the piping systems if bursting disks are not applied for overpressure and develop appropriate design guidelines to ensure that the piping design is robust but not overly conservative.

Relief Device Selection - Essential RD 1. Conduct shock tube tests at the same scale as typical relief device sizes encountered in real applications to establish the response times under a range of overpressures ( %). RD 2. Establish mechanical integrity criteria for relief valves for use in tube rupture service. RD 3. Establish the range of process conditions for which conventional relief valves could be utilised to protect against tube rupture and those for which bursting disks are required. This needs to consider aspects such as differential design pressure between low and high pressure side of exchanger, relief device speed of response etc. Alternate relief valve types and manufacturers’ products will be taken into account.

Design Guidelines - Essential DG 1. A design decision flowchart that takes designers through the engineering analysis required to develop the overpressure protection design for a shell and tube heat exchanger. DG 2. Relief device selection criteria for tube rupture. DG 3. Relief device set-point selection criteria. DG 4. Design criteria for overpressure protection of piping connected to heat exchangers. DG 5. Design criteria for the interface between the relief devices and the relief disposal (flare) system. DG 6. Lessons learned from operating experience of STHEs. DG 7. Instrumentation requirements for detection of tube rupture and bursting disk rupture.

Essential Tasks & Cost Estimates Researcher: £120,000 Engineering Study: £150,000 Energy Institute: Project Management: £30,000 Contingency: £30,000 Total Estimate: £330,000

Proposed Structure The fee for operating companies or safety regulators sponsors is £30,000 The fee for other participants (e.g. design houses) is £15,000 Relevant in-kind contributions may be accepted from other participants, such as from relief valve manufacturers, heat exchanger design software specialists, etc. Target fee of £330,000 can be achieved with: 11 operators Or 10 operators + 2 others Or 9 operators + 4 others Etc Need 11 “operators”

Considerations Minimum 50% Funding Keep Researcher fully funded Need to provide guidelines Some guidelines require analysis Management & Contingency proportional to total funding

Cost Reductions

Resulting Engineering Tasks