Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015.

Slides:



Advertisements
Similar presentations
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department October 8, 2009.
Advertisements

Structural Steel Construction
Bridge Building 101 Presented by KEEN.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
By : Prof.Dr.\Nabil Mahmoud
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Chapter 34 Bridge Construction.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Bridges unit 101.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
 Project Delivery  Design Considerations  Lessons Learned.
Small Caunton …… 19 th March 2015 for. Agenda Brief Introduction to Caunton Some context Small changes taken Small changes we’d like to see.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
Johnson Street Bridge Replacement Project Quarterly Update May 7, 2015.
Appendices Subpart R Steel Erection
Steel Erection These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
The GNWT Action Plan – The Levelton Report Jan 18, 2011 Yellowknife 1.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Partners in Progress Forming Bonds with GECs to Build Roads.
ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Bond Oversight Committee Meeting Fourth Quarter 2015 January 26, 2016.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
College of Engineering, EEIC Ethical Dilemmas Ethical dilemmas arise when there are multiple Stakeholders with conflicting interests. Good ethical practice.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1% Sales Tax Commission Board Meeting June 3, 2015.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Totally Precast Concrete Bridges
High Bridge Re-Deck Project
Replacement of Vehicle Bridge over Spring Creek
Engineering Terms Bridge Unit.
Using project records to show delay and disruption
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Beam Pipe and Service Support Structure Production Progress
City-wide LED Street Light Conversion Program
Issaquah-Fall City Road
COLUMNS SLIDE SHOW.
Totally Precast Concrete Bridges
Far Experimental Hall Hutches Civil Construction
Transportation vehicles
Commissioners Presentation
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
East Hall under construction
Presentation transcript:

Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015

New Intersection Harbour & Esquimalt Road

Delta Hotel Access

Rest Pier Completion

West Abutment

Bascule Pier Big Pour

Intermediate Pier

New Project Schedule Key Milestones Steel Fabrication & ShippingMarch 1, 2015 – June 5, 2016 (66 weeks) Bridge Machinery FabricationFeb. 23, 2015 – Nov. 23, 2015 (39 weeks) Bridge Decks – EastJune 26, 2015 – Oct. 23, 2015 (17 weeks) Bridge Decks – WestJune 26, 2015 – Sept. 18, 2015 (12 weeks) Bridge Machinery InstallationNov. 23, 2015 – Feb 1, 2016 (10 weeks) Site Shut DownFeb. 23, 2016 – June 5, 2016 (15 weeks) Steel Bridge ErectionJune 5, 2016 – Sept. 18, 2016 (15 weeks) Bascule Span (Miscellaneous):Sept. 18, 2016 – Nov 27, 2016 (10 weeks) Traffic shift/bridge ready for trafficJan. 15, 2017 DemolitionJan. 15, 2017 – April 16, 2017 (13 weeks) Project completionJune 25, 2017

Project Contingency ItemAmount Initial Contingency $2,515,000 Value Engineering Savings $ 300,000 Current Contingency Commitments -$1,344,573 Projected Contingency items -$1,870,500 Contingency Shortfall -$ 400,000

Financial Impact Description of CostsAmount Insurance$ 280,000 Additional city costs$ 420,000 Professional consulting services $1,800,000 Current contingency shortfall $ 400,000 Legal costs for mediation$ 400,000 Unallocated contingency to completion $1,500,000 Total$4,800,000

Project Budget – Costs Presented to Council in March These costs were recently presented Council and an additional $4.8 million was requested for the project $1.5 million was granted by Council This brings the total budget for the Johnson Street Bridge Project to $94.3 million

Steel Fabrication

Steel fabrication restarted in March New quality control oversight program now in place in the steel fabrication plant Work done to improve Quality Management Plan and Inspection and Testing Plan

Steel Fabrication Non-destructive examination of Orthotropic Steel Deck mockup to inspect quality of welds

Steel Fabrication Truss web plates after plasma cutting. Quality Control verifying traceability of material

Steel Fabrication Regular inspections by the fabricator and the contractor’s quality control consultants Ensures the bridge is constructed to the highest standard of the design – any steel not meeting the highest quality and safety specifications will be not be accepted by the City

Steel Fabrication Overhead robotic gantry welding equipment used in the production of orthotropic deck panels

Steel Fabrication Ring flange plates cut and beveled, prior to bending to the radius of the rings

How the Bridge is Constructed The steel bridge has six main components: two rings, two forward trusses, a counterweight and the steel deck The counterweight and steel deck connect the ring and truss structures together to form the complete bridge

How the Bridge is Constructed

Fabrication begins with the rings Starts with cutting, rolling, and splicing together of curved plates that form the ring The sides and middle areas of the rings are made by splicing together sections of steel plate to create three complete web-like elements per ring

How the Bridge is Constructed Robotic welding of the orthotropic steel deck test panel

How the Bridge is Constructed After the pieces are complete and inspected, they are aligned and the ring is progressively welded together The trusses are fabricated in a similar fashion to the rings by creating long, slender pieces of steel, which are then progressively assembled into a fully welded structure

How the Bridge is Constructed

The deck is constructed with a series of orthotropic panels (a steel plate with welded ribs for added support) that are spliced together and connected with the floor beams The deck and floor beams are later connected to each truss to create a fully welded structure

How the Bridge is Constructed

When the components are complete, inside the steel fabrication factory there are a number of trial assemblies and tests to ensure the bridge performs as it is designed to After the bridge has been assembled, tested and measured in position, the machinery responsible for the raising and lowering of the bridge will be installed

How the Bridge is Constructed

The various bridge components will then be painted and packaged for shipping to Victoria on an ocean freight vessel The estimated timelines are: –Fabrication – 7-9 months –Trial erection – 2-3 months –Painting – 1-2 months –Travel time from China to Victoria – 2 months

Seismic Design

Presentation in March to explain the seismic design to Council The design standards for the Johnson Street Bridge that the H&H final design are based on are the most comprehensive and relevant design requirements for bascule bridges in North America

Seismic Design The new JSB has been designed as a “Critical Bridge” – the equivalent to the definition of “Lifeline Bridge”, the performance required by the City The design of new JSB will allow the bridge to be available to all traffic after a design earthquake of 1/1000 years.

Seismic Design The JSB is being designed and constructed to a very high seismic standard meeting the most stringent current codes in North America The JSB will “be usable by emergency vehicles and for security/defense purposes immediately after a large earthquake, e.g. a 2500-yr return period event”

Machinery Fabrication

Mediation

Next Steps Next Quarterly Update to Council in May Continued onsite work by PCL Arrival of the steel bridge span in June 2016 Updates to Council as needed on contingency and possible project cost savings

Thank You Questions