Clean Air Project: Team Big Green SpaceGasm Final Presentation Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Colorado Space Grant Consortium DemoSat-B Colorado State University Matthew Jui, Ian Patterson, Mark Spowart, Todd Wallis June Colorado Space Grant.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
Dynamo Team Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Launch Readiness Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Team Poptarts Final Presentation Saad Alqahtani Kyle Skjerven Charles MacCraiger Connor Jacobsen Matt Busby Alexa Warly Corinne Desroches 11/29/11.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Team Name Final Presentation Team Members Date Rev
Cydonia Final Review Presentation 6 December 2007 Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Echo  Final Presentation Andrew Berg, Shawn Carroll, Cody Humbargar, Jade Nelson, Jared Russell, Austin Williamson
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Team Andromeda Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick 2 October 2012.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Victorious Secret Final Presentation Crawford Leeds Jacob Broadway Tanya Hardon Devan Corona Dylan Reed November 29, 2011.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Project HUSP: Humidity/UV-c Sensor Payload Team Parro Presentation of Flight Results NSBF, Palestine, TX.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Team Honey Badger R.A.H.D. Final Presentation Team Members: Kyle Daniels, Logan Harrop, Annie Kelly, Gabe Frank Jason Leng, Karyn Perdue, Josh Whipkey,
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Team Honey Badger R.A.H.D. Critical Design Review October 18, 2012 Josh Power Karyn Science Kyle Team Leader C+DH Annie C+DH Zach Budget + Science C&DH.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
O2n Cloud Nine Critical Design Review
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team Super 8: Sat Morpheus Final Presentation
Pima Community College ASCEND Flight: Spring 2010 A post-mortem!!!
Team SCREAM Launch Readiness Review
Presentation transcript:

Clean Air Project: Team Big Green SpaceGasm Final Presentation Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong December 2, 2010

Mission Overview  Mission objective: Take measurements of the concentrations of carbon monoxide, carbon dioxide, and methane gases  Purpose of Mission: The team’s interest in the quality of air and changes that were recently experienced over the past few years  Hypothesis: Concentrations have increased during the course of the year 2

Design Overview  Three Sensors: CO, CO2, and Methane  Arduino and MicroSD Shield  Required Components  Camera, Hobo, Heater, and Batteries 3

Functional Block Diagram 4

Results and Analysis  microSD memory card failed to store data due to a simple error in code  Unable to compare predicted to actual data  Colorado Department of Public Health and Environment  Does not provide data on carbon dioxide and methane gases as initially expected  Team did not closely study what the department did or did not provide  Data provided for carbon monoxide is not significant  Online archived data dates to March

Results and Analysis  Team able to show expected increase in at least one gas: carbon dioxide  Shortfall: Readings taken from Mauna Loa Observatory in Hawaii 6

Results and Analysis  HOBO temperature data: 7

Images from Camera 8

Flight Overview  Sensors were functional but could not store data on microSD memory card  Camera took images but memory card filled about halfway through the flight  HOBO successful took and stored internal and external temperatures and relative humidity  Heater system function (minimum internal temperature: -2.90°C)  Structure suffered minimal damages 9

Failure Analysis  Not structural error  The structural suffered minimal damages  Internal components suffered no damages  Not electrical error  All the connections were present  Failure rooted in software 10

/* Big Green SpaceGasm Java Code to be uploaded to Arduino */ //Add the SdFat Libraries #include //Create the variables to be used by SdFat Library Sd2Card card; SdVolume volume; SdFile root; SdFile file; char name[] = "BGSGfinaldata1.txt"; //Create an array that contains the name of our file. char contents[256]; //This will be a data buffer for writing contents to the file. char in_char=0; int index=0; //Index will keep track of our position within the contents buffer. String inin; int sensorValueCO = 0; int sensorValueCH = 0; int sensorValueCO2 = 0; String CO; String CH; String CO2;.... char name[] = "BGSGfinaldata1.txt"; Final Code Used on Launch Day char name[] = "test1.txt"; Correct Code That Will Be Used Next Launch =BAD

Conclusion  Data from external sources remain inconclusive  However, learned much from our failures  Now able to store the data that was recorded during flight  Find more reliable external source with which to compare our data  Re-flight in April 2011 highly anticipated and will yield conclusive data 12

Appendix 13

Lessons Learned  Carbon dioxide sensor short circuited due to too high of voltage/current  Camera should take images over longer time intervals  Conduct more system tests, namely for sensors and software  Ensure sensors taking data  Data being stored on microSD card and is retrievable 14

Flight Readiness  Source of error has been traced to the code  Error was repeated with various tests done to affirm the source of error lay with code  Code rewritten and error solved  Structure does not need to be mended  For re-flight, new batteries with Velcro and a new CO 2 sensor will be needed  Must be stored in dry, cool area 15

Requirements Flow Down: Level 0 16 NumberDerivationDescriptionCompliance 1 M.S. Payload must ascend to an altitude of approximately 30.5 kilometers with a balloon provided by the Edge of Space Sciences Payload reached an altitude of approximately 30.3 kilometers 2 M.S. Payload must collect and store science data related to the mission objective (Please see failure analysis) 3 M.S. The payload must carry an active heater system, keeping the internal temperature of the payload above -10°C (Please HOBO data) 4 M.S.The payload must be constructed from foam core The payload was constructed from foam core. 5 M.S. The total mass of the payload must not exceed 850 grams and the budget of the project must not exceed three-hundred dollars. The payload had a final weight of 782 grams and cost $ M.S. The payload must allow for a HOBO H and the provided external temperature cable The payload included the HOBO H and the provided external temperature cable 7 M.S. The payload must allow for a Canon A570IS Digital Camera with two AA lithium batteries The payload included the Canon A570IS Digital Camera with two AA lithium batteries 8 M.S. The payload must have contact information written on the external of the payload, alongside an United States flag The payload had contact information written on the external of the payload, alongside an United States flag 9 M.S. The team will be ready to launch on November 6, 2010, at Windsor, Colorado, at 6:50 AM. The Gateway to Space class launched on November 6, 2010, at Windsor, Colorado, at 7:40 AM 10 M.S. The team shall adhere to all safety procedures outlined in the proposal All safety procedures have been followed

Requirements Flow Down: Level 1 17 NumberDerivationDescription 1 O1Payload must remain attached to the flight string during the mission 2 O7The payload must be functional, retrievable, and capable of flying multiple times. 3 O2 The payload will carry carbon monoxide, carbon dioxide, and methane gas sensors to record the concentrations of each gas at different altitudes 4 O5 The entire payload, including all electrical components and structural materials, will weigh 781 grams 5 O6 The HOBO H shall measure and record measurements of internal temperature and the provided external temperature cable will record external temperatures during the mission. 6 O7A Canon A570IS Digital Camera will take and store images during the flight. 7 O2 Program the Arduino microcontroller with the integrated development environment using the Java programming language 8a O2Interface the carbon monoxide gas sensor to the Arduino microcontroller 8b O2Interface the carbon dioxide gas sensor to the Arduino microcontroller 8c O2Interface the methane gas sensor to the Arduino microcontroller 8d O2 Test the functionality of the gas sensors individually and then test the functionality of the sensors integrated together on the Arduino microcontroller by placing the sensors behind the exhaust pipe of a running automobile that belongs to a member of the team. 8e O10The team will adhere to all safety measures and protocol when testing system functionality. 9 O2, O3 Provide the necessary power to each electrical component and ensure that the recorded data is being properly stored 10 O1, O2, O3, O4 Create a structure that can withstand the forces and extreme temperatures experienced during flight 11 O10 The team will have a functional and flight-ready payload to turn-in on check-in, November 5, 2010, and launch day, November 6, 2010.

Mass and Cost Summary

Message to Next Semester  Course is challenging, but an invaluable and exciting learning experience  Communication, among others, is crucial  Subsystems can have own timetable  During full systems testing, each subsystem must be functional  If not, testing cannot continue until addressed  Time is not an ally  K.I.S.S. model – Keep It Simple Stupid  Given a measure of freedom  Remember constraints on costs, weight, and time 19