DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Contract CloseOut.
Roadmap for Sourcing Decision Review Board (DRB)
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
 Capacity Development; National Systems / Global Fund Summary of the implementation capacities for National Programs and Global Fund Grants For HIV /TB.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Module five: Session Two M5S21. Training objective To review the various financing options available to road contractors M5S22.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
DOE OFFICE OF INDIAN ENERGY Project Development and Finance Workshop Day 3 1.
DOE OFFICE OF INDIAN ENERGY Step 2: Project Options 1.
DOE OFFICE OF INDIAN ENERGY Key Project Development and Financing Concepts 1.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Security Assessments FITSP-M Module 5. Security control assessments are not about checklists, simple pass-fail results, or generating paperwork to pass.
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
“Here’s why you need the new wheels, too…” Shawn and Steve Image from
A Case Study in Community Wind New Ulm Public Utilities Commission - Success with Due Diligence Welcome.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Information Systems Security Computer System Life Cycle Security.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Security Assessments FITSP-A Module 5
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
NIST Special Publication Revision 1
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Management & Development of Complex Projects Course Code - 706
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
ANATOMY OF A DEAL: FINANCING Peter Y. Flynn, Bostonia Partners.
Software Project Management
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
Project Life Cycle.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Physical Inventory Why? 1 Barbara A. Finnegan, CPPM CF.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Rob Connatser NSS Instrument Work Packages and XLPM.
TechStambha PMP Certification Training
(Additional materials)
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Malama Chileshe Energy Economist COMESA Secretariat
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1

2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation

Potential OptionsRefinementImplementation Operations & Maintenance Step 4: Implementation 3 Purpose: Contract for, realize physical construction of project Tasks: Finalize project agreements Finalize vendor contracting process Finalize preconstruction tasks Realize construction and equipment installation Realize interconnection Realize project commissioning leading to commercial operations Output: Completed project (operation)

Step 4: Implementation 1.Financial closing (if applicable) 2.Contract execution 3.Construction of project  Contract oversight/quality control  Change control 4.Commissioning  Testing and verification  Interconnection verification (utility) 4 Variable effort relative to project scale

1. Financial Closing (if applicable) The process of completing all project-related financial transactions, finalizing and closing the project financial accounts, disposing of project assets, and releasing the work site. 5 A few key steps: Establish and communicate final date for all financial transactions and account closings well before closing Verify all items from the Statement of Work have been completed before disbursing final payments Collect all financial records and verify all financial obligations have been satisfied Close all financial accounts Transfer or dispose of assets according to the acquisition plan

2. Contract Execution Verify contract documentation Obtain contract approvals Book the contract Transfer project responsibility to project manager 6

3. Construction of Project Project developer orders equipment and begins construction or installation Construction manager coordinates work of various trades Close coordination with tenants if building is occupied Frequent communication between all parties to minimize possible issues 7

4. Commissioning 8 Planning Determine objectives and strategies Assemble project team Compile and review building and equipment documentation Investigation Conduct site assessment Develop functional test and monitoring plans Analyze test results Compile master list of deficiencies and recommend improvements Implementation Accepted recommendations are put in place Repairs and improvements Retesting and re-monitoring Fine-tuning Hand-off and Integration Final documentation of commissioning effort is presented Develop and present plan for future commissioning efforts including recommended procedures for specific equipment, frequency of testing, analysis of results, periodic reporting, key players, and budget requirements

Potential OptionsRefinementImplementation Operations & Maintenance Step 4: Hypothetical Community Example – Outputs 9 Photo from Byers and Renier Construction, NREL Completed and operating project New ownership organization completed (if needed) Project Implementation Success Project generating electricity Project developed within budget

Project Risk – Facility-Scale Post Step 4 10 RisksRisk Assessment Post Step 4 Development Loss/waste of development resources Medium; now with more assurance of success Site Improper orientation or project affected by shade Low; some may be assumed by host Inadequate foundation or structural integrity Low; developer assessed Site control for challenges for safety/security purposes Low; some assumed by host Permitting Tribe-adopted codes and permitting challenges Low; permitting completed Utility interconnection challenges None Finance Capital constraints None; project constructed/commissioned Incentive unavailability or insufficiency Low to none; allocated to developer Construction/ Completion Engineering, procurement, and construction difficulties None; EPC complete Cost overruns None; construction complete Schedule overruns None; construction complete Operating Output shortfall from expectedLow; allocated to owner Technology O&M failureLow; allocated to owner or O&M contractor Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & Analysis NOTE: Underlining signifies that the risk assessment outcome changes during the step at hand.

Project Risk – Community-Scale Post Step 4 11 Risks Risk Assessment Post Step 4 Development Poor or no renewable energy resource assessment Not identifying all possible costs Unrealistic estimation of all costs Incorrect estimation of long-term “community” energy use Utility rules and ability to offset use with centralized production Low; site picked Low; detailed model Low; final projection None; executed Site Structural (e.g. rooftop solar, wind loading, soil conditions) Installation safety (e.g., wind tower, hazard for adjacent sites) Site control for safety/security purposes None; addressed Low; site secure Permitting Tribe-adopted codes and permitting requirements Utility interconnection requirements Low; complete None; complete Finance Capital availability Incentive availability risk None; finalized Construction/ Completion EPC difficulties Cost overruns Schedule None; contracted None; construction complete Operating Output shortfall from expected Technology O&M Assumed low, mitigable or allocatable Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & Analysis *NOTE: Underlining signifies that the risk assessment outcome changes during the step at hand.