SNUG 2013 Napier 7 th November Auckland JTOC Presented by Michael Daley
JTOC – Joint Transport Operations Centre JTOC general update
SCATS in Auckland SCATS is finally on the move 5 year’s in the making Merger - Transit NZ and LTSA Mergers – Auckland Councils Merger – RTA and Maritime Safety into RMS and Transport for NSW Licenses needed re-doing for both AT and NZTA SCATS until August 2013 SCATS migration to (started this week!)
The Numbers We have 9 Regions with provision for 11 Regions in our license Migrating of sites between Regions is underway to “load balance” the regions from an SI/SA perspective Intersections = SCATS sites (incl 122 Ramp signal sites) 21 Isolated sites
Upgrading the Auckland System This has been a challenge in many different ways! Progressively managed upgrades Communications Server Environment SCATS software From the we have progressively migrated ALL leased line communication circuits primarily to ADSL Cheaper operating costs Not tied to one location for SCATS servers The last circuit was changed over in Sept 2013
Communications No more leased line circuits Many comms solutions ADSL – 608 sites VDSL – 21 sites + CCTV Private copper – 81 sites (mostly Auckland CBD) Fibre – 152 sites WiMax Wireless – 14 sites 3G – 1 site Multi connected – 12 sites
SCATS Environment Servers migrated from physical operating Windows Server 2003 Now ALL servers are operating in a Virtual Machine environment running Windows Server 2008 R2 SCATS ran well under this setup Next steps after migrating to is to prepare and test the failover/fail back systems
SCATS Upgrade Until August 2013 running version Major data cleanup required for preparation of migrating to Variation routines and action lists mostly Intermediate jump to (bridging version) completed in Sept 2013 New licenses and dongles required for Many headaches around licensing and naming conventions Most SCATS Regions will change name to marry up with Signal maintenance area’s Tricky issues around connecting physical Network dongles to Virtual servers SCATS requires more Central Manager data processing Upgraded SCATS CM Access database to SQL server express
SCATS Upgrade SCATS Central Manager upgraded to on Monday this week RED network dongles cannot be updated by user New dongles are required if you purchase more site licenses Regions will be upgraded over the next two weeks Licensing issues – Dual licensing now in use Server license and Client license required for 3 rd party ITS connected applications Bus priority broken for two days until RMS figured out how to license external 3 rd party ITS applications
SCATS Applications In addition to the core applications: SCATS History Reader (ALL sites, not just those in IDM’s) SCATS Alarm Analyser SCATS Communication Analyser SCATS Traffic Reporter SCATS Alert SCATS Action Runner (new for SCATS 6.9 onwards) If anyone is interested I can show these in use.
CCTV Two systems in operation currently GVD DvTel 102 camera’s on GVD 353 camera’s on DvTel 455 camera’s available for Traffic monitoring
JTOC Technical Services Team Managed by Matthew Hoyle Primary functions Traffic signal and ramp signal operations Route Optimisation – 4 year programme to optimise Arterial road signals Year 1 – 75 sites Year 2 – 150 sites Year 3 – 100 sites incl Auckland CBD Design reviews – per year Most customer initiated complaints/queries – per week Data requests or signal maintenance issues – per week VIP greenwave motorcades – 5-6 per year Traffic Signal Software development – 100 per year
Assets and Contracts Team Managed by James Wickham Responsible for managing the Signals and CCTV/Electronic signs contracts (non-motorway) 4 Traffic Signal contract area’s Recent Asset Renewals program based on asset life Funding shortfall Traffic Signal Recommended Replacement Annual Quantity Average Useful Life (Years) ComponentNorthCentralWestSouthTotal 15Controllers Lanterns Pedestrian Callbox Poles Target Boards CCTV Camera Electronic Sign
Loops – estimated total for Auckland exceeds (8000 for Traffic signals and 2000 for ramp Signals) Recent Fault Analysis Traffic Signal Fault report period from 01/07/2012 to 30/06/2013 Fault1-Jan2-Feb3-Mar4-Apr5-May6-Jun7-Jul8-Aug9-Sep10-Oct11-Nov12-DecTotal Audio Tactile Fault Comms Fault Controller Fault Cowl Missing/Loose Detector Fault Graffiti Lamp Fault Lantern Out of Alignment Lantern Repair/Replacement Lights Out Loop Not Working OverHead Lamp Out Ped Not Working Pole Repair/Replacement Road Works/Loops Not Working Total
Other JTOC and AT/NZTA Teams JTOC Motorway management operators (Peter Bathgate) NZTA National Travel information advisors (Toni Skiffington) AT Busways Operations IS Services at JTOC (John Burns) Management and Admin AT Traffic Services (Ken Lee-Jones) Auckland Motorways Alliance
Challenges Construction of the Western Ring Route for SH16 (Northwestern Motorway) Waterview Tunnel Waterview interchange construction Raising and widening of SH 16 – Waterview to Pataki interchange Widening of SH16 – Western Springs to Waterview Widening of SH16 – Te Atatu to Royal Rd Congestion and managing effects of traffic on and off the motorway onto ocal arterials
Thank you