Measures to increase ATC capacity. a) taking all reasonable steps to fully exploit the existing capacity of the air navigation system; b) developing plans.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Welcome Safety Regulatory Function Handbook April 2006.
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Airport considerations and airport solutions Session 5 Presentation 3.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Continuous Climb Operations (CCO) Saulo Da Silva
Airspace Organization
EUROCONTROL CRDS 22-24/11/2004 ICRAT 1/15 ICRAT 2004, Zilina, November 22-24, 2004 Towards the traffic synchronisation in a Functional Airspace Block Lenka.
The main causes of the air traffic congestion are:
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
ICAO Provisions for Safety Management
Protection Values for VOR-Defined ATS Routes
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
HCI in Safety-Critical Applications: ATC Systems Aslan Neishaboori.
IS Audit Function Knowledge
Project Time Management
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
EFRAG’s preliminary position on the IASB Supplementary Document Financial Instruments: Impairment Draft comment letter 28 February 2011.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Survey of Traffic and Radar Controller Communication and Workload
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
Dushanbe 14/3/2013 DoQuP Model 1 DoQuP Project WP.1 - Deliverable 1.3 The DoQuP Model: milestone of the DoQuP project Marina Cavallini CRUI.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
THE RESEARCH ON THE INFLUENCE OF WORKLOAD ON THE OCCURRENCE OF DIFFERENT TYPES OF ATC ERRORS Samartseva Elena IAN-519 Samartseva Elena IAN-519.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
LECTURE 4: ICAO CHART requirements
© 2011 LAIC Aktiengesellschaft © Ifield Computer Consultancy Limited 2013 ATRAK-AISS Aeronautical Information System Services.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Impact of Operating Context on the Use of Structure in Air Traffic.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
EFRAG’s preliminary position on the IASB Supplementary Document Financial Instruments: Impairment Draft comment letter 28 February 2011.
Workshop on preparations for ANConf/12 − ASBU methodology
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Workshop on preparations for ANConf/12 − ASBU methodology
FISHING EFFORT & CPUE.
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
Continuous Climb Operations (CCO) Saulo Da Silva
AIR TRAFFIC CONTROL SERVICE
Giancarlo Buono Nicosia, April 13th 2018
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
How to conduct Effective Stage-1 Audit
Balanced Approach to Noise Mitigation
Balanced Approach to Noise Mitigation
Presentation transcript:

Measures to increase ATC capacity. a) taking all reasonable steps to fully exploit the existing capacity of the air navigation system; b) developing plans to increase the capacity of the ATC system where required, particularly in the terminal airspace, so as to be able to meet the forecast traffic demand of the users. Such plans should take account of the need for effective SIDs and STARS, development of segregated VFR and IFR routes, assessment of impact of noise abatement procedures and curfew windows, development of procedures to accommodate emergency situations, etc.; negotiating letters of agreement between adjacent States to ensure the development of proper procedures for coordination and transfer of control. In this context, efforts should be made where possible and practicable to design sectorization independently of artificial boundaries, such as existing borders;

the need for effective SIDs and STARS, development of segregated VFR and IFR routes, assessment of impact of noise abatement procedures and curfew windows, development of procedures to accommodate emergency situations, etc.; (c) negotiating letters of agreement between adjacent States to ensure the development of proper procedures for coordination and transfer of control. In this context, efforts should be made where possible and practicable to design sectorization independently of artificial boundaries, such as existing borders; d) developing procedures between units to improve flow management to make maximum use of the available ATC capacity;

(e) ensuring that new measures to be adopted are introduced with minimum delay and preferably simultaneously by adjacent units; (f) designing ATC procedures for handling arriving aircraft in order to provide the best exploitation of available runways and landing capacity. This should be achieved in conjunction with the users’ requirements for optimum descent and direct path; and (g) achieving efficient arrival/departure operations through improved runway/taxiway design, such as the provision of parallel taxiways and high-speed runway exits.

A detailed traffic forecast regarding major traffic flows in a particular flight information region (FIR) or area composed of several FIRS should be prepared. Such forecasts should be used to determine the development of airspace and flow management as far ahead as possible and for a period of at least five years and in such a form that it can be used by all concerned with the planning of the air navigation system. They should indicate both average traffic demand and peak values, as well as seasonal, weekly or diurnal changes in future traffic demand. States should continuously review the capacity of their ATC system in order to ensure that it can be adjusted to accommodate forecast traffic demands.

CONTINGENCY PLANNING Status of contingency plans Contingency plans are intended to provide alternative facilities and services to those provided for in the regional air navigation plan when those facilities and services are temporarily not available. Contingency arrangements are therefore temporary in nature, remain in effect only until the services and facilities of the plan are re-activated and, accordingly, do not constitute amendments to the regional plan requiring processing in accordance with the “Procedure for the Amendment of Approved Regional Plans”. Responsibility for developing, promulgating and implementing contingency plans (a) the state responsible to provide ATS. (b) The state responsible to provide ATS over high seas. (c) The state responsible to provide ATS in the area of another state.

Techniques for ATC Sector/Position Capacity Estimation Knowledge of the capacity of air traffic control sectors or ATC operating positions is necessary for two reasons. Firstly, for long-term planning, adequate warning is required of any future shortfall in capacity, as indicated by traffic forecasts. Secondly, if there is already a shortage of capacity requiring the application of flow control, it is necessary to know what the capacity is, in order to limit air traffic to a level which does not overload the system or penalize the operator A considerable amount of work has been devoted in recent years to methods of estimating capacity. Of particular interest has been the work proposed by the United Kingdom, Directorate of Operation Research and Analysis (DORATASK Methodology for the assessment of ATC en-route sectors capacity - DORA Interim Report 8818; the application of this technique to current London Terminal Area Sectors.

Messerschmidt, BGlkow und Blohm (MBB) of Germany resulting in the development of a procedure to quantify the control capacity of ATC working positions, known as the “MBB Method”. DORATASK. The proposed DORATASK work centred on the assessment of the workload carried by the radar controller, summing the time spent on routine and conflict resolution (observable) tasks on the one hand, and planning (nonobservable)tasks on the other. In addition to these twointerrelated elements of the controller’s tasks, there was a third element - a “recuperation” time. This was a minimum proportion of time not allocated to specified tasks (observable or non-observable) but considered essential for the safe operation of the sector.

Observable tasks are those which can readily be recorded and timed by an outside observer; examples include radiotelephony (RTF) and telephone communication, strip marking and direct-voice-liaison coordination. Routine tasks, for a particular aircraft, are those which must be carried out even if there are no other aircraft in the vicinity.

Non-observable tasks are those which are carried out almost continuously by the busy controller in parallel with the observable tasks, and which cannot generally be directly recorded or timed by the observer. These tasks, which include monitoring the radar screen and planning future actions, are, however, critical to the business of the sector controller. The non-observable workload was determined by calculating, for each aircraft within the sector area, hqw many strips it produces and how many other strips already present on the boards must be checked against it when it is first given to the radar controller. This number of checks was then multiplied by a “time per strip check” to give the total non-observable workload. The time for a strip check was not considered as a duration time for a physical task but as a factor calculated when the model was calibrated to reflect the time taken by the whole planning task. The latter was the main aspect of DORATASK which required more detailed research. This kind of workload would be increased significantly during a peak flow of traffic.

The workload measure for a given sector and traffic sample was the sum of the observable and non-observable workload times. To arrive at capacity it was necessary to determine a minimum proportion of time that the controller must have for recuperation if the sector was to continue to be operated safely. This proportion was likely to increase with the length of time that a “capacity” flow rate was expected to continue. Initially it was assumed that the sector would operate at capacity for no more than one hour without either the controller changing or the traffic declining. The amount by which the traffic flow was to be set at a lower rate in order for safe operation to continue was studied further. While it was assumed that the time spent per strip check, which determined the weight given to the planning workload, was two seconds, the following conclusions were derived:

“THE AVERAGE WORKLOAD AT CAPACITY MUST BE LESS THAN 80 PER CENT AND WORKLOADS OF 90 PER CENT MUST NOT BE EXCEEDED MORE THAN 2.5 PER CENT OF THE TIME.”