The Performance Based Rating (PBR) Methodology as applied by Meralco A presentation by Romeo Junia to the Freedom from Debt Coalition (FDC) Task Force.

Slides:



Advertisements
Similar presentations
- GDP 2011 versus 2010 – increase by 5.5%
Advertisements

VECO OWES CONSUMERS P2.2 BILLION AS OF APRIL 2014 Presented during a Public Hearing called by the Cebu City Council on May 28, 2014.
Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
1 Northeast Public Power Association Electric Utility Basics Electric Rates and Cost of Service Studies.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
July 2014 National School Lunch Program. ADE Health & Nutrition Initiates Administrative Review of schools’ lunch program & follows up with any findings.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
The Community Renewable Energy Amendment Act of 2013.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Analyzing Your Finances
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
Vicente C. Camilon Jr. TUCP Party-List. The Mission of the Energy Regulatory Commission (ERC) “The Energy Regulatory Commission will promote and protect.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
NAGKAISA! Laban sa EPIRA Wilson M. Fortaleza Training/Workshop September 24, 2012 ALU Mariners’ Court, Cebu City.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
University of Minnesota Office of Internal / External Sales Fiscal Year-End Actions for Internal/External Sales Organizations.
Review of the Economic System Planning Criteria June 15 th, 2012 / RPG.
Financial Management Back to Table of Contents. Financial Management 2 Chapter 21 Financial Management Analyzing Your Finances Managing Your Finances.
Outline 1)Power rates have doubled with EPIRA 2)EPIRA has re-concentrated ownership of the power industry to a few 3)EPIRA legitimized onerous contracts.
Copyright © 2003 Pearson Education, Inc. Slide 10-0 Ch 10 Learning Goals 1.Concept of cost of capital 2.Determine the annual percentage cost of individual.
KEY ACCOUNTING CONCEPTS ACTG 6920 Session 2 Professor Kile.
Government Service Insurance System GSIS stand on the By WINSTON F. GARCIA President and General Manager meralco issue.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Riga Latest developments in Estonia.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Philippine Feed-In Tariff System Implementation 1.
Integrated Electric Utilities formed 1900s NPC created 1936 Electric coops created NPC developed nationwide grid Generation nationalized to NPC Electric.
Wholesale Electricity Spot Market (WESM)
ERC’s Role in the Regulation of the Power Generation Rates ERC’s Role in the Regulation of the Power Generation Rates S.B.Allam National Economic and Development.
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
A people’s review on the impact of the Electric Power Industry Reform Act of 2001.
 The Business Environment  The Tax Environment  The Financial Environment.
ERRA 4th Annual Conference May 19, Budapest, Hungary. Latvia Country Update UPDATE ON REGULATION Ainars Čunčulis Head of Energy Department Public.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
ERRA Workshop on Regulatory Monitoring of Electricity Sector Almaty, Kazakhstan, January 31 – February 2, 2006 Implementing the Chart of Accounts and Reporting.
EFFICIENCY FIRST FOR MISSOURI’S ENERGY FUTURE Becky Stanfield, NRDC October 21, 2014 MPSC Statewide Collaborative Meeting.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
REVISED UNIFORM REPORTORIAL REQUIREMENT (URR)
Electric Power Industry Reform Act (EPIRA)
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
All our strategies are aligned with our Vision which is to become Asia’s benchmark of excellence in power regulation, and our Mission to promote and protect.
- GDP 2011 versus 2010 – increase by 5.5%
The competition enforcement in regulated sectors
DEPRECIATION & CAPITAL RECOVERY UNDER LIBERALIZATION ITU/BDT ARAB REGIONAL WORKSHOP ON “SECTOR REFORM & LIBERALIZATION” MARCH 9-11, 2004 DR. ALY ELFAR,
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
WATER REGULATORY AUTHORITY
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

The Performance Based Rating (PBR) Methodology as applied by Meralco A presentation by Romeo Junia to the Freedom from Debt Coalition (FDC) Task Force on Power May 2012

MERALCO AND OTHER UTILITY ISSUES PHILIPPINE ELECTRICITY RATES, ESPECIALLY IN THE MERALCO FRANCHISE AREA, ARE THE HIGHEST IN ASIA AND THE FIFTH HIGHEST IN THE WORLD. 1. TONGA, AS OF 6/1/11, US CENTS 2. DENMARK, AS OF 11/1/11, US CENTS 3. GERMANY, AS OF 11/1/11, US CENTS 4. BRAZIL, AS OF 1/11/11, US CENTS 5. PHILIPPINES, AS OF 3/1/10, US CENTS.

THE WORLD’S HIGHEST AT TODAY’S RATE OF P13.40 PKWH FOR SOME MERALCO CUSTOMER CLASSES, OR THE EQUIVALENT OF 44 US CENTS, WE WOULD BE THE SECOND-HIGHEST IF NOT THE HIGHEST RATE IN THE WORLD. OTHER COMPARABLE RATES ARE: – USA, US CENTS – UK, US CENTS – SINGAPORE, 22 US CENTS – THAILAND, 9.79 US CENTS – ITALY/IRELAND, 28 US CENTS.

HOW IT HAPPENED HOW DID ALL THESE BECOME POSSIBLE? ALL THESE HAPPENED WHEN ERC ADOPTED A RATE SETTING METHODOLOGY CALLED “PERFORMANCE BASED REGULATION”, OR PBR, ABANDONING “RETURN ON RATE BASE” OR RORB.

UNDER RORB – UTILITY HAD TO INVEST FIRST BEFORE IT COULD COLLECT ITS COSTS AND ITS INVESTMENTS. IT WAS A RECOVERY MECHANISM. – WHILE THERE WAS PREVIOUSLY NO CLEAR CRITERIA UNDER RORB AND UTILITIES COULD JUST CHARGE ANYTHING TO THE CUSTOMERS, THE SC REFUND ORDER IN LUALHATI VS MERALCO SET VERY CLEAR GUIDELINES AND CRITERIA FOR COST RECOVERY. UNFORTUNATELY, ERC SHIFTED TO PBR RIGHT AFTER THAT LANDMARK DECISION FOR CONSUMERS. – RETURN ON ASSETS WAS CAPPED AT 12%.

UNDER PBR – MERALCO SUBMITS ITS 4-YEAR BUDGET OR ANNUAL REVENUE REQUIREMENT. THIS IS THE SO-CALLED RATE RESET PROCESS. – ERC APPROVES THE 4-YEAR BUDGET IN ONE SWEEP. – ARR IS CONVERTED, YEARLY, INTO THE MAXIMUM AVERAGE PRICE OR MAP AND TRANSLATED INTO DIFFERENT RATES FOR DIFFERENT CUSTOMER CLASSES. THIS IS WHERE DISCRIMINATORY RATES ARE INSTITUTED AND DISTORTED COSTS AND PRICES IN THE ARR ARE PERPETUATED. – THE PROCESS IS VERY TECHNICAL AND LITIGIUOUS RESULTING IN MERE TOKEN COMPLIANCE WITH PROCEDURAL AND SUBSTANTIVE DUE PROCESS FOR CONSUMERS. – RATES UNDER PBR HAVE REACHED THE ROOF – FROM P0.70 PKWH UNDER RORB TO P PKWH UNDER PBR. – UNDER PBR, MERALCO’S NET EARNINGS INCREASED FROM P3.2 BILLION TO P14BILLION IN JUST FOUR YEARS. – THE 12% CAP ON RETURN ON CAPITAL HAS BEEN LIFTED.

TRACKING MERALCO’S RATE: – FEB., RORB - P0.70 PKWH – JUNE, RATE UNBUNDLING, P PKWH – INITIAL SHIFT TO PBR – JULY, PBR (1 ST & 2 ND REGULATORY PERIODS) – MAY, PBR RATE, P PKWH – APRIL PBR, RY 2010 MAP, P PKWH – JANUARY PBR RY 2011 MAP, P PKWH – JUNE, PBR RY 2012 MAP, P1.60PKWH – JUNE, PBR RY 2013, P PKWH.

BASE CALCULATION RATE COMPONENTS, USING A 200 KWH CUSTOMER AS BASE CASE: TOTAL BILL: P2,462.00/ JUL-AUGUST 2012 BILLING – GENERATION P1, % – TRANSMISSION % – SYSTEM LOSS % – DISTRIBUTION (MERALCO) % – SUBSIDIES % – GOV’T. TAXES % – UNVERSAL CHARGES %

MERALCO COUNT FOR CUSTOMERS IN THE KWH CLASS BASED ON DOCUMENTS SUBMITTED BY MERALCO IN ERC CASE , FOR MAP 2012 – 1,268,332 – THE BIGGEST CUSTOMER CLUSTER.

GENERATION: – DE-REGULATED – COMPETETIVE – PASS-THROUGH COST – MERALCO HAS APPLIED FOR ERC APPROVAL OF ALLEGED UNDER RECOVERY FOR GENERATION, FOR YEAR 2011 ONLY, AMOUNTING TO P1.8 BILLION. IT IS ALSO ASKING FOR 8.9% INTEREST AMOUNTING TO P162MILLION. – UNTIL THERE IS A SURPLUS IN SUPPLY, THERE WILL BE NO TRUE COMPETITION IN THIS SECTOR. – NOTE THAT THE COA REPORT OF DECEMBER 2009 INDICATED THAT MERALCO MAY HAVE OVERCHARGED P2.7BILLION IN ITS GENERATION RATES.

TRANSMISSION: – REGULATED MONOPOLY – SUBJECT TO THE SAME REGULATION AS MERALCO UNDER PBR – WHEN POWER RATE WAS BUNDLED UNDER NPC, THIS WAS BARELY P0.60 PKWH – ANCILLARY CHARGES ARE COLLECTED FROM CONSUMERS AND THERE SHOULD BE VERIFICATION IF THIS HAS BASIS.

SYSTEM LOSS: – ORIGINALLY CAPPED BY LAW UNDER RA 7832, THE ANTI PILFERAGE LAW. – MERALCO CURRENTLY REPORTS 7.13% SYSTEM LOSS. – SL INCLUDES GENERATION COMPONENT, DESPITE THE FACT THAT SL IS ESSENTIALLY LINE LOSS. – UNDER A 200 KWH HOUSEHOLD, IF THE 7.13% SL IS APPLIED TO MERALCO DISTRIBUTION RATE ONLY (P462.53), THE SL CHARGE WILL ONLY BE P33.07 PKWH INSTEAD OF P155.54, OR A SAVINGS OF P AT ANNUAL SALES OF 30BILLION KWH, THAT MEANS P36.7 BILLION LESS CHARGES TO CONSUMERS.

DISTRIBUTION: – PBR IS REVENUE-SETTING, NOT COST RECOVERY AS MANDATED BY EPIRA. – CONSUMERS ARE STILL QUESTIONING THE ARR FOR THE 3 RD REGULATORY PERIOD. MR. URIEL BORJA HAS BROUGHT THIS UP TO THE SUPREME COURT. – MR. GENARO LUALHATI SAYS THE REGULATORY ASSET BASE OF MERALCO IS BLOATED BY P39 BILLION. – MR BORJA SAYS THE CAPITAL EXPENSE PROGRAM IS OVERPRICED – BY AS MUCH AS 500% TO 900%. – MERALCO APPLIED FOR P18BILLION UNDER-RECOVERY FROM THE 2 ND REGULATORY PERIOD. ERC GRANTED P20BILLION. – MERALCO APPLIED FOR P2.04BILLION REGULATORY LIAISON AND COMPLIANCE, ERC GRANTED P2.2BILLION. – RETURN ON RATE BASE NOW CALLED WACC OR WEIGHTED AVERAGE COST OF CAPITAL IS 14.97%. AT ONE TIME THIS WAS 15.5%. CAP UNDER RORB WAS 12%. – RAB IS NOW P126BILLION. THIS RESULTED FROM APPRAISAL INCREASE AND CAPEX COLLECTIONS FROM CONSUMERS, NOT INVESTMENT OR EQUITY INFUSION BY THE OWNERS. THIS HAS RESULTED IN A HIGH RETURN ON CAPITAL THAT THE OWNERS DID NOT PUT IN. RETUIRN SHOULD BE BASED ON EQUITY RATHER THAN RAB. – MERALCO IS GIVEN/ADVANCED BY CONSUMERS ITS WORKING CAPITAL, AND CONSUMERS ARE EVEN CHARGED INTEREST OR CARRYING COST FOR THAT CAPITAL. – ACCORDING TO MR LUALHATI’S COMPUTATION, MERALCO’S DISTRIBUTION RATE SHOULD ONLY BE P0.90 PKWH, THUS MERALCO SHOULD REFUND CONSUMERS P21BILLION. – THE SO-CALLED RATE TRANSLATION RESULTS IN RESIDENTIAL CUSTOMERS PAYING MORE THAN COMMEFRCIAL-INDUTRIAL CUSTOMERS, AT MORE OR LESS DOUBLE THEIR RATE. – THERE ARE INTRA-CLASS SUBSIDIES THAT RESULT IN DISCRIMINATORY PRICING. PRICE ALLOCATION IS BY REGULATORY FIAT AND NOT COST OF SERVICE.

SUBSIDIES: – RESIDENTIAL CUSTOMERS USING MORE THAN 100 KWH ARE PAYING THE LIFELINE SUBSIDY AND SENIOR CITIZEN DISCOUNT. THIS IS UNFAIR. – THIS SUBSIDY SHOULD BE BORNE OR PAID FOR BY GOVERNMENT FROM OUT OF THE VAT ON POWER.

GOVERNMENT TAXES: – VAT ON SYSTEM LOSS AND SUBSIDIES SHOULD BE REMOVED. HOW CAN LOSS AND AN INVOLUNTARY SUBSIDY BE TAXED? – VAT ON POWER SHOULD BE USED TO COVER THE LIFELINE SUBSIDY AND SENIOR CITIZEN DISCOUNT.

UNIVERSAL CHARGES: – WE SHOULD VERIFY IF PRIVATELY-OWNED DISTRIBUTION UTILITIES ARE CHARGING THEIR DEBTS TO THE UNIVERSAL CHARGE. – THERE SHOULD BE MONITORING OF THE POWER DEBTS AS THEY ARE SUPPOSED TO BE RETIRED FROM THIS AND THE PROCEEDS OF PRIVATIZATION.

MATTERS PENDING AT ERC: – MAP 2012: ERC CASE NO THERE HAS BEEN NO RULING ON THE MERITS BUT A SUPERVENING ORDER WAS ISSUED, RENDERING THE HEARING MOOT AND ACADEMIC. – MAP 2013: ERC CASE NO O54. NO HEARING ON THE MERIT BUT ALREADY IMPLEMENTED UNDER A PROVISIONAL AUTHORITY. THIS IS THE PROV AUTH THAT SUPERSEDED A PRIOR PROV AUTH (MAP 2012) WITH NEITHER CASE BEING RESOLVED ON THE MERIT. – APPLICATION FOR APPROVAL OF PRO-FORMA CONTRACT, ERC CASE NO , A VIRTUAL BLANK CHECK FOR MERALCO TO LEASE ASSETS. – APPLICATION FOR APPROVAL OF TWO POWER SUPPLY CONTRACTS – PANGEA AND SAN MIGUEL ENERGY. WE HAVE TO REVIEW THE DETAILS OF THE CONTRACTS. – APPLICATION FOR OVER/UNDER RECOVERY OF GENERATION, TRANSMISSION, SYSTEM LOSS, AND SUBSIDIES, FOR YEAR 2011 AND FOR FOUR PRIOR YEARS, UNDER A SEPARATE FILING. – APPLICATION TO SELL SAN MARCELINO PROPERTY, WE HAVE TO ESTABLISH OUR INTEREST IN THE PROCEEDS AND THE REGULATORY/TRANSPARENCY OF THE SALE ITSELF. – A VERY SIGNIFICANT CASE TO WATCH OUT FOR IS THE SETTLEMENT AGREEMENT, WHICH MERALCO MAY REVIVE ANY TIME SOON. AND WHICH WE COULD OR SHOULD BRING TO CRIMINAL JUSTICE ON OUR OWN.

WHAT CAN BE DONE: – IN THE CERA OVERCHARGES, WE OBTAINED A REFUND. – IN A COUPLE OF CASES AT THE APPELATE COURTS, INCLUDING THE SUPREME COURT, WE HAVE LOST AND WON. IN FACT, FDC ITSELF WON A SUPREME COURT DECISION THAT STRENGTHENED PROCEDURAL DUE PROCESS. WE JUST HAVE TO BE PERSISTENT. WE HAVE TO REGISTER OUR PROTESTS. WE HAVE TO ENTER OUR INTERVENTION. WE HAVE TO CHALLENGE AT EVERY TURN. – WE HAVE TO MATCH THE INTERVENTION IN THE ERC PROCEEDINGS WITH STREET/MASS ACTION. – CONTINUING EDUCATION OF THE CONSUMER, HEIGHTENED READINESS TO ENGAGE IN ALTERNATIVE FORUMS. – IN FACT, IF WE CAN CREATE A PEOPLE’S REGULATORY COMMISSION TO SHADOW AND TRACK THE ERC, WE WILL NOT JUST BE AIRING THE ISSUES, WE COULD EMBARRASS AND SHAME THE COMMISSIONERS BY CARICTURING THEM.