PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.

Slides:



Advertisements
Similar presentations
STEM Agenda Week 31 4/8 – 4/12. Agenda 4/8 Learning Target: Brainstorm and research wind turbine ideas. Agenda: Turn in Safety Pledge!!! Review Wind Turbines.
Advertisements

Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Public – Final phenotypes algorithms and implementation results: Work that has been tested, validated, implemented, and ready to be shared with the public.
MyFloridaMarketPlace Roundtable May 20, 2003 MyFloridaMarketPlace.
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
MSD-I Project Review Modular Motion Tracking Sensors 1.
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Small-Scale Solar Power Solar Power Rangers ~ Phillip Hicks 31 January 2008.
Pinwheel Technologies (C3)
The Power of the Wind and New Mexico 4-H Karen Paige Northern Stars 4-H Club NM 4-H Adult Leaders Forum November 5, 2011.
PDR: 2/21/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 1/31/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 2/22/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Funding engineBilling engine Funding engine.
Concept Design Review Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
The Chip Set. At one time, most of the functions of the chipset were performed by multiple, smaller controller chips Integrated to form a single set of.
1 Intelliform This demonstration is designed to provide an overview of how Intelliform works. We have tried to illustrate not only the power, but the ease.
Cash Given Definition… Ready money, such as money in hand, petty cash (used in businesses), bank account balance, and money market accounts. In my own.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Hair Straightener Redesign
How to Sell More Homes with Consumer-Direct Marketing.
Utilizing Website Marketing & Technology to Increase Sales & Profitability Timothy Howard Clarity Connect, Inc. Holly Springs, NC
IOT5_ GISFI # 05, June 20 – 22, 2011, Hyderabad, India 1 Internet of Things Work Group Coordination Plan WG Chair.
Total Item Price: $ Dollars. Website: Price: $60.00.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
1. Fundamentals of Global Energy Business Michael J. Orlando University of Colorado - Denver week 1: Demand for Energy video 3: Innovation transforms.
Who Thinks They Have Disaster Response Fully Handled?
LIS-560 Database Assignment Kelly’s Kids Database Design by Chrystie Kroeker Boggs.
Chapters 8.5 & 8.6 Problem Solving with percents Exploring percent of increase or decrease.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
WEEK 1 You have 10 seconds to name…
Project Meeting 12 Paul Capelli, Matt Bernstein, Jared Segal.
Working Group 1: Evolving 911 Services Status Update December 3, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Designed by: Nathaniel Lageman Colin Kreft Jerry Lynch Benjamin Sepe EDSGN GE TRANSPORTATION: OFF-GRID TELECOM BASE STATION.
Managing Your Money Using a Budget By Eleonore Marino.
Percent of Change. Objective: To find the sale price of various items. To use the percent of change formula to find discount.
CIM Media Production Staff Center for Interactive Media structure.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 7, 2008.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review January 31, 2008.
Wind Turbine Power Plant. Sources ●
Overview of the Web Development Process.  Website Strategic Plan (Planning)  Content and Site Architecture (Planning)  Website Strawman (Planning)
Senior Design SR22 Canard September 28, Meeting Objectives 1.Decide on deliverables for PDR (20min) 1.Establish a presentation for Tuesdays Trip.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Created By:-
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Project Assessment & Estimates 1. Concept Retailer Experience.
TOSCA Interop SC – Proposed Timeline for Discussion Revised Sept 10, 2012 Matt Rutkowski.
More about Solar Energy and Its Uses. Solar Panel in Mandeville Envisolarenergy located in Louisiana offers high quality, cost effective solar panels.
EDD 581 Week 5 Individual Action Research Proposal, Section Two To purchase this material click 581-Week-5-Individual-Action-Research-Proposal-
EDD 581 Week 6 Individual Action Research Proposal, Section Three To purchase this material click
IT 210 Week 1 CheckPoint Input Data and Output Process To purchase this material link Input-Data-and-Output-Process.
Plan of Attack Identified Contacts for Consortium Members
WIND TURBINE GENERATORS.
دانشکده سرمایه گذار مبانی و مدل
Website Call
Advanced Energy Vehicle
Call : Website: -
Plagiarism By Heather Branch
Company Name Bill Receipt Additional Notes:-­‐ Item No: Particulars
 WEBSITE:
 WEBSITE:
Compendium Online tool
Presentation transcript:

PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni

Action Items Generator – Model Generator – Model Capable of functioning in best case scenario Capable of functioning in best case scenario Smaller model unable to handle > 2.5 A for worst case scenario Smaller model unable to handle > 2.5 A for worst case scenario Website Website Used template found online Used template found online Ready for regular updates with ease Ready for regular updates with ease

Website: Before and After

Current Status Decided on Drag-Based Design Decided on Drag-Based Design Based on building abilities Based on building abilities Designing airfoils would be difficult on budget/time Designing airfoils would be difficult on budget/time Not trying to reinvent the wind turbine Not trying to reinvent the wind turbine On-schedule On-schedule

Next Week’s Action Items Group Concept Group Concept Finalize concept and complete report Finalize concept and complete report Start CAD drafts Start CAD drafts Create a Bill of Materials Create a Bill of Materials Look for prices on various items Look for prices on various items Batteries Batteries Materials for frame/base Materials for frame/base

Questions? Questions?