MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Controls and Monitoring Implementation Plan J. Leaver 03/06/2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
MICE Computing and Software
Jean-Sebastien Graulich, Geneva
Controls & Monitoring in MICE
The Online Detector Control at the BaBar experiment at SLAC
Presentation transcript:

MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End Electronics Jean-Sebastien Graulich, Geneva

Organization  Online Group created  Charges “The online group is responsible of making sure the software and disposition of information available in the control room allows efficient data taking and enough online information to verify data quality as it is taken and immediately after”  Composition Detector DAQ : J.S Graulich (Group Leader) Control and Monitoring: J. Leaver & P. Hanlet Online Reconstruction: L. Coney MLCR Manager: C. MacWaters MICE CM January 2009Jean-Sébastien GraulichSlide 2

Control and Monitoring  Controls & Monitoring Leader (J. Leaver): Identify control requirements of each section of MICE Decide on most appropriate solution Coordinate the effort of those involved in implementing agreed solution Define work packages to be undertaken by DL or other appropriate groups in the Collaboration  DL remain in charge of EPICS infrastructure - and continue to be most important EPICS resource  Pierrick Hanlet will focus on Monitoring Archiving of existing data (Magnets, etc) Unified Monitoring panel MICE CM January 2009Jean-Sébastien GraulichSlide 3

Individual Project Status Updates  Decay Solenoid & Cryogenic System Several upgrades, including: Automatic operation sequences, Remote monitoring of the fridge via a web interface, additional vacuum monitoring & interlocks,...  Hydrogen System Special training and evaluation of technical solutions have started  Fermilab Beam Position Monitors FNAL BPM software complete Used for calibration after the noise problem fixed last month  Tracker AFEIIt configuration, control & monitoring software complete Successfully tested with DATE using Tracker 1 cosmic ray stand Finalisation of DATE integration details required James Leaver - Imperial College

Target CAM  Target Control Design of extra monitoring & interlocks for Target Chiller complete Addition of a “dip permit” derived from combination of Personnel Safety & temperature monitoring interlocks  Target Monitoring Target dip depth ISIS signals (Beam Losses, Beam Position, etc…) MICE CM January 2009Jean-Sébastien GraulichSlide 5

MICE CM January 2009Jean-Sébastien GraulichSlide 6

Target Beam Loss Monitors  BLM IOC supplies interface to data archive written by local DAQ  Clients provide virtual scope display, history plots & analysis  Functionally complete Refinements in progress Pierrick Hanlet - Fermilab DAQ

CAM Suggested Improvements  Currently have a collection of EPICS-compatible subsystems  need to combine into single integrated control system Use Alarm Handler Standard EPICS tool that can warn operators of dangerous/abnormal conditions (if properly configured) Input from MICE community: which systems/parameters should trigger alarms? Extend use of Archiver Presently used for cryo monitoring - not yet widely used elsewhere Input from MICE community: which parameters should be archived? Further use of web interfaces for remote monitoring Scripting languages for automation Perl, Python, Tcl/Tk, etc. Above all, make use of the vast range of existing EPICS solutions – DON’T REINVENT THE WHEEL! Brian Martlew - Daresbury Laboratory

Detector DAQ  Progress since CM22 TOF1 included in the DAQ and in the trigger New flashADC (500MHz) installed for CKOV Computer Clock synchronization fixed Not 100% satisfactory: PCs are synchronized to each other but not to the outside world (firewall issue) Progress has been slower than foreseen  Known issues Limit on the number of particle events From DAQ and from Online Monitoring ( about 40 Particles/Spill ) Not expected and needs more investigations Event reconstruction Recent, dramatic, unexpected mismatch between the number of particle triggers in the two crates (for some runs) -> Serious Event building problem !  Interface with EPICS becomes a top priority MICE CM January 2009Jean-Sébastien GraulichSlide 9

Online Software  Unpacking library needs upgrade New fADC (V1731) for CKOV New version to be distributed next week  Interface with G4MICE First task is to reproduce online histograms (David Adey) See Software session for more details  Know issues Online monitoring GUI tends to get stalled at the end of a run Online monitoring histograms are not labeled according to detector names That is a feature! Need better Online plots for fADC Current plots found not efficient in detecting broken channels Not straight forward task (fluctuating baseline) MICE CM January 2009Jean-Sébastien GraulichSlide 10

MICE CM January 2009Jean-Sébastien GraulichSlide 11 FEE Issues  Cross Talk Issue Affect TOF stations New design is under study  FADC firmware upgrade Needed for significant reduction of data volume Less samples per Particle event (currently 512 whereas only 60 are necessary Zero suppression (to be tested) Delicate operation  Splitter/Shaper Production for TOF2 Board production is finished in Sofia Discrete components are in hand in Geneva Mounting will start in February  Missing TDC/fADC for TOF2 Should be ordered by Ludovico/Maurizio (funding issues)  FEE for EMR (aka SW) Technical design approved by TB

MICE CM January 2009Jean-Sébastien GraulichSlide 12 Schedule Milestones  New Milestones for DDAQ  Target DAQ included in Detector DAQmid February  DAQ migration to the DAQ/Control networkMarch 06  Installation of the Online Reconstruction FarmMarch 06  Upgrade of fADC firmwareMarch 06  TOF2 Shaper/Splitter ProductionStarted – mid March  CAM data in Online Data Streamend of April  Tracker integrated in DAQ and OLMend of April  TOF TDC Clock Synchronizationend of April  DAQ review May 2009  Burst Gate Signal in the Trigger Systemneed beam  Approval of SW/EMR Front End Electronicsdepends on INFN  Production of SW/EMR Front End ElectronicsSeptember 2009

MICE CM January 2009Jean-Sébastien GraulichSlide 13 Outline DDAQ  TOF1 has been integrated into DAQ, Trigger and OLM  CKOV readout has been upgraded  Many recent milestones have been missed  Serious problem with event building discovered  Target DAQ is about to be integrated to Detector DAQ  FEE for SW/EMR and TOF2 are priority tasks CAM  Good progress with individual projects  Need concerted effort to integrate all existing systems into a coherent whole, using existing EPICS tools wherever possible  Need to agree upon what additional controls/monitors are required and establish standard routines for initiating & coordinating new work Any help & suggestions from the MICE community are most welcome ALL  Work plan is drawn to have all the current issues solved before May for Step II