USC Football Recruiting Database System. Team 6 Client: Jared Blank with USC Football. Revati Kadu Natasha Karnik Akshay ArasMike Nicosia (IV & V) Abhishek.

Slides:



Advertisements
Similar presentations
CLINIC MANAGEMENT SYSTEM
Advertisements

Offline and Web-based tools development to support the TSA By Reymar Gooding.
FUNDAMENTALS OF COMPUTER SYSTEMS OCR GCSE Computing.
An Improved Approach to Project Estimation Based on Software Artifact Reuse by David T. Henrickson.
Essential Introduction to Computers. What is a Computer? An electronic device, operating under the control of instructions stored in its own memory, that.
Essential Introduction to Computers
The Business Case for Spend Analysis May 7, 2014.
1 RUP Workshop By George Merguerian Senior Partner Business Management Consultants
DISC Database and Innovative Software in the Community (DISC) 1 October 9th, 2011 ARMS 1098B Design Review.
Interpret Application Specifications
Implementation/Acceptance Testing CSE Week 8 / 1 CSE9020 Case Study Week 8 Implementation and Acceptance Testing.
Lecture 6 - Project Planning. Lecture 6: Project Planning Overview Creating an outline plan –Work Breakdown Structure –Identifying tasks Waterfall and.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Picture Users Making Art Chat An interactive communication tool.
City of LA Personnel Department Mobile Application Team 02 1.
Project Management and Scheduling
11 MAINTAINING THE OPERATING SYSTEM Chapter 5. Chapter 5: MAINTAINING THE OPERATING SYSTEM2 CHAPTER OVERVIEW  Understand the difference between service.
 Our system is a Web based system.  The question is what does a recruitment consultant do?  A recruitment consultant is the intermediary between companies.
Release & Deployment ITIL Version 3
1 Team Management System (TMS) By DACCIT Pvt. Ltd., Indore.
TRR ARB Presentation Women at Work Website Redesign.
“Here’s why you need the new wheels, too…” Shawn and Steve Image from
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Share Document Management Records Management Logic-driven Workflow Auditing and compliance Relevant Search Knowledge and Expertise discovery Blogs and.
GroundsOpsStaff (Last Updated 9/9/2010) A Grounds Operations and Staffing Computer Application Based on APPA Operational Guidelines for Grounds Management.
Build a Free Website1 Build A Website For Free 2 ND Edition By Mark Bell.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Overview of Windows and Microsoft Word. Operating System Performs 3 functions –Controls the hardware of the computer Screen, keyboard, disk drives, etc.
Assignment 2 Project: Sea Urchin Sporting Goods Team Members: Gwn Hannay, Debbie Carlton, Susan Dalgleish Daniel Barnes, David Cooper.
TEACHER FEEDBACK WEBSITE HTVN TEAM. AGENDA 1.TEAM INTRDUCTION 2.PROJECT OVERVIEW 3.PLAN 4.PRODUCT ARCHITECTURE 5.DATABASE DESIGN 6.TEST PLAN & TEST REPORT.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
TRANSITION READINESS REVIEW GOTRLA TEAM 15 Aayush Jain, Ankith Nagarle, Anushila Dey, Deepak Earayil, Elaine Lo, Nidhi Baheti, Presha Thakkar, Suhani Vyas.
EZee iCafe System. Contents Introduction Current Scenario Proposed Solution Architecture / Block Diagram Hardware / Software Requirements Features Benefits.
Project Dragon Small Business Website Content Management System.
Computerized Exam Engine prepared by Nader Elkhuzundar
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
© Paradigm Publishing Inc. 4-1 OPERATING SYSTEMS.
Module 2 : Part 1 INTRODUCTION TO HARDWARE & SOFTWARE INTRODUCTION TO HARDWARE & SOFTWARE.
Online Music Store. MSE Project Presentation III
 What are CASE Tools ?  Rational ROSE  Microsoft Project  Rational ROSE VS MS Project  Virtual Communication  The appropriate choice for ALL Projects.
Agenda  Project Overview  Project Goal & Scope  Estimates  Deadline  Project Environment  Delivery Plan  Project Plan  Team Structure  Risk Analysis.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
K15T2-Team 5- PoD Team Software Project Management.
UNIVERSITI TENAGA NASIONAL “Generates Professionals” MODULE 2 : Part 1 INTRODUCTION TO HARDWARE & SOFTWARE.
1 Software Maintenance and Evolution CSSE 575: Session 4, Part 2 Software Maintenance Process Steve Chenoweth Office Phone: (812) Cell: (937)
The Business Case for Spend Analysis. What is spend analysis? What could you do with better spend visibility? Where does the data come from? Why not do.
ONLINE INTRUSION ALERT AGGREGATION WITH GENERATIVE DATA STREAM MODELING.
Computer Organization & Assembly Language Chapter _ 04 Ghazanfer Mirza.
Presented By Shrikant Ravindra Kamble MCA 3 rd year.
This presentation will provide us a proposal of an overview of the hiring and training plan, performance, potential opportunities and recommendations for.
Library Management System. Aim : To develop a project titled “LIBRARY MANAGEMENT” and is developed to maintain the operation done in a library. To develop.
GSU-Schedule File Transformation Tools Presented by: Radhika Eedara Pratima Dharmala Phanendar Movva Advisor: Dr. Soon Ok Park CPSC Spring 2016.
Manage your projects efficiently and on a high level PROJECT MANAGEMENT SYSTEM Enovatio Projects Efficient project management Creating project plans Increasing.
Project Management PTM721S
Chapter 2-Introduction to Making Multimedia
Managing the Project Lifecycle
USC e-Services Software Engineering Projects
Transitional Readiness Review Team 08
Computer Aided Software Engineering (CASE)
ShareTheTraining TRR ARB Presentation Team 11
DCR ARB Presentation Team 5: Tour Conductor.
USC e-Services Software Engineering Projects
Mission Science By Team 07.
Project Management Chapter 11.
Chapter 2-Introduction to Making Multimedia
Presentation transcript:

USC Football Recruiting Database System. Team 6 Client: Jared Blank with USC Football. Revati Kadu Natasha Karnik Akshay ArasMike Nicosia (IV & V) Abhishek Venkatesh Aishwary Kumar (IV & V) Amruta Chitnis Aditya Shukla (IV & V)

Transition Readiness Review Outline Operational Concept Overview Demo of the Product Support Plan Data Reporting and Archiving Summary of Transition Plan Feedback

Operational Concept Overview - Abhishek Venkatesh

Project Background Current System Developed System Success Critical Stakeholders Organizational Goals

Project Background USC Football program: large number of people involved during the recruiting process. The idea : develop a program to efficiently support this process. High Level Impact:  Better management of prospective applicants & players  Better client participation in other administrative activities.  Improved online repository of classified player information

Current System Personal records of player’s information are stored in Excel. There are more than 150 records, hence, lot of time is spent in searching for the recruit’s information. Jared uses information stored in Excel to make phone calls. Spends approx. 2 hours for 150 phone calls regarding updates.

Developed System  The new system provides a database which stores information of potential recruits. The user obtains information using this database. The new system can send text messages to the recruit’s mobile phone. There are 2 sets of users – Executive and Standard, each with different privileges.

Success Critical Stakeholders Jared Blank – Client Standard User: Football Coaches, supporting staff System maintainers Developers  Revati Kadu ( Project Manager)  Natasha Karnik (Life Cycle Plans and Prototypes)  Akshay Aras (Project Coordinator)  Amruta Chitnis (Systems Architecture and Project Tracking)  Abhishek Venkatesh (Operational Concept and Analysis)  Potential Recruits

Organizational Goals OG1: Better way of storing information and improved way of searching by having information stored in a database OG2: Efficient operational capability via text messaging functionality.

New and changed requirements Data reporting: Printout of important content (already satisfied) Issue of budget discussed with the client. Hence a particular COTS was chosen.

Product Demo - Natasha Karnik - Amruta Chitnis

Support Plan - Natasha Karnik

Hardware Requirements A hard disk. Monitor or display device, and graphics card Standard 101/102 key keyboard Standard mouse Built-in Network Card

Software Requirements Windows XP Professional 2005 IIS Server.NET Framework MS Access Microsoft Visual Studio 2005 Internet Explorer/ Mozilla Firefox

Support Responsibilities The development team IV&V Client Users Maintainers

Data Reporting - Revati Kadu - Akshay Aras

Based on Business Case Analysis Project Duration: 24 weeks, 2 semesters. Positive ROI (0.62) starting year Number of Developers for 577a: 6 577b: 5

Effort for Developers Effort* from start of 577a for 6 developers till date. Planned: 1183 Actual: 1212 Effort* from start of 577b for 5 developers till date. Planned: 697 Actual: 723  *Person Hours Above information is based on calculations done using progress reports of each semester. Till date: 4/11/2006

Source Code Estimates Revised COCOMO (v1.4) Estimate: 1601 Current Code Count estimate (hand count method): 1802

Project Issues Configuration Management. COTS Re-analysis.

Transition Plan Summary - Akshay Aras

Changes in Transition Plan Transition Strategy Transition Process

Changes in Transition Plan Identification of Maintainers Addition of Maintenance Prospective IDE Un-Installation

Transition Strategy Fault Free Installation Decision on Multiple Nodes Maintenance Readiness

Transition Process Pre-Deployment Maintenance Data Pre-Loading Staged Training Operation Guides

Feedback / Q & A

Thank You!!