Seven Helpful Charts Diane Ritter. The Charts Cause-and-EffectRun (Trend) Chart Measure Time Flow ChartPareto Chart Measure Histogram Measurement Measure.

Slides:



Advertisements
Similar presentations
Quality Improvement: Problem Solving
Advertisements

Statistical Process Control for Short-Runs
TOOLS OF TQM Abdulla Jassim Abdulla. INTRODUCTION Data-Driven Methodology Data generated by processes Statistical interpretation Seasonal variations New.
Employee Services – Space Requirements
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4.
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
PDCA CYCLE.
OMSAN LOJİSTİK. Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 7: Improving and Monitoring.
Suggested Flow of the Software
Kenneth J. Andrews EMP Gen-X: Manufacturing Analysis What is the process?Build & test of AXIS machine for a specific Customer Who is the customer?MegaPower-
Statistical Process Control Managing for Quality Dr. Ron Lembke.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19.
Quality, Time, and the Theory of Constraints
Flow charting symbols CHECK SHEETS Check sheets explore what and where an event of interest is occurring. Attribute Check Sheet Order Types 7am-9am 9am-11am.
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Hilton Maher Selto 7 Managing Quality and Time to Create Value McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
© 2006 Prentice Hall, Inc.7 – 1 Operations Management Chapter 7 – Process Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
High Lights of SAP Business One for Manufacturing.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19 May.
Total Quality Management BUS 3 – 142 Tools of Quality Week of Mar 7, 2011.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Quality Improvement: Problem Solving Quality Tools and Techniques.
1 Presented by: Dr. Husam Arman Quality management: Tools and Techniques.
Overview of Total Quality Tools
Lean Systems and Six-Sigma Quality
TOOL MANAGEMENT INTRODUCTION
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
From Research Prototype to Production
Supply Chain Doctors The Supply Chain Doctors Supply Chain Management Kimball Bullington, Ph.D.
Requisition Training March 26, 2009 RAYMONDVILLE ISD.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis & Quality 4 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
12 Functions of Food Service
Courtesy Sujiths Consultancy Serviices, Coimbatore Does your organization has any of the following problems? Are you searching for solutions to prove your.
“Without the Cost of Waste …”
Business Process Analysis
44095: IT for Management Review & Part 2 Requirements By:Ian Perry Room: C41C Tel:
Syllabus Highlights CSE 1310 – Introduction to Computers and Programming Vassilis Athitsos University of Texas at Arlington 1.
Measure : SPC Dedy Sugiarto.
Lean Healthcare - The Identification of Waste in Healthcare
On the basis of data Collection of life saving patient transfer to higher center, we found that about 53.19% of patient were transferred more than one.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Introduction to Quality Improvement Tools We are what we repeatedly do. Excellence, then, is not an act but a habit. ARISTOTLE.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Process Mapping Dr. Nishan Sharma University of Calgary, Canada March
THE 7 BASIC QUALITY TOOLS AS A PROBLEM SOLVING SYSTEM Kelly Roggenkamp.
Basic Quality Control Tools. Flowchart Check sheet Cause-effect diagram Pareto chart Histogram Scatter diagrams Control chart.
© 1998 Prentice-Hall, Inc. Statistics for Managers Using Microsoft Excel, 1/e Statistics for Managers Using Microsoft Excel Statistical Applications.
Flashy Flashers, Inc. Sarah Giles Jarred Plazak Melissa Osborn Haoman Qin Kate Truckor Nereida Rodriguez Joe Sessin BUAD 3020:004 “Love Thy Customer As.
Inventory Management Definition: STOCK:
OPERATIONS MANAGEMENT Goods, Services and Value Chains MOHD FARHAN ISMAIL TEEBAN THATCHANAMURTHI ADAMU ABDULLAHI IDRISU ROSHASMAWI.
Balanced Scorecard: Quality, Time, and the Theory of Constraints
SYSPRO Business Model Flows
PURCHASE ORDER PROCEDURES
Daily routines A day in the life of Jane.
Inventory Control.
Hilton • Maher • Selto.
Lean Healthcare - The Identification of Waste in Healthcare
Chapter 4 Inventory Management.
Chapter 11 Total Quality Management and Continuous Improvement.
Seven Helpful Charts Diane Ritter.
BUS 308 Competitive Success-- snaptutorial.com
BUS 308 Education for Service-- snaptutorial.com
BUS 308 Teaching Effectively-- snaptutorial.com
Abdulla Jassim Abdulla
Run Charts Slide 1 of 3 Run Charts Defined
Scatter Diagrams Slide 1 of 4
Microeconomics Pt.3: What Is Supply?.
Presentation transcript:

Seven Helpful Charts Diane Ritter

The Charts Cause-and-EffectRun (Trend) Chart Measure Time Flow ChartPareto Chart Measure Histogram Measurement Measure Control Chart Measurement Time UCL LCL xx Measure Scatter Diagram

Cause and Effect: “Wrong Hospital Meals” GOAL, Memory Jogger Wrong meals served to patients on both shifts Equipment PeopleProcedures Policies Lack of funds Outdated “clothespin” system Fear of computers Unclear menu Training Antiquated Poor set-up Lack of time Unmotivated Overworked “Doctor’s Disease” Handwritten instructions poor Lack of awareness No system No feedback to person making mistakes Lack of staff Lack of attention in dietary Disciplinary policies Lack of funds Hiring policies in dietary Lack of emphasis

Flow Chart: “From Bed to Work” Sunrise NoNo NoNo Yes Start coffee Sleep late Wait NoNo NoNo NoNo NoNo Yes Shower Get Dressed Eat Breakfast Drive to Work Arrive at Work Iron Clothes Watch TV Take Bus Park & Walk Yes Bathroom Available Clothes Ready Read Paper Car Available Park in Lot Alarm goes off

Flow Chart 2: “P.C. Board Flow” Incoming Material: Components P.C. board Post Assembly Touch-up Pass Ship Q.C. Auto Test Q.C. Wave Solder and Cleaning Hand Assembly Rework/S crap Auto Insertion Vendor Repaired Use as is Rework/S crap Fail Pass

Flow Chart 3: A simple flow diagram - The mail order process YES NO BEGIN FILL OUT ORDER FORM RECEIVE ORDER; INSPECT IT SHIP GOODS TO CUSTOMER RECEIVE GOODS; INSPECT THEM PROCESS THE COMPLAINT COMPLAIN TO SUPPLIER SUBMIT ORDER END GOODS ACCEPT- ABLE? INFORMATION COMPLETE? RETURN ORDER FORM TO CUSTOMER MAIL ORDER SUPPLIER CUSTOMER (CLIENT)

Flow Chart 4: Ordering Supplies Yes No Item out of stock Item Delivered! Notify Sergio (Item and Quantity). Delivery varies from 4-8 weeks. Deliver Next Day. Mail to University Stores. Fill out Order Form. Procurement Issues a Purchase Order. Send to Procurement Office (RICE 501). Procurement faxes the order to vendor. Deliver next day. University Stocked Item? University Approved Vendor?

Pareto Chart: “Types of Injury”

Run (Trend) Chart: “Emergency Room Admissions” Goal, Memory Jogger

Histogram: “Print Density” Goal, Memory Jogger Black Density of Print

Scatter diagram: “Drive Time” Goal, Memory Jogger

Control Chart Measurement Time UCL LCL xx Measure

Seven Helpful Charts a. Control, b. Cause-effect, c. Scatter diagram, d. Flow, e. Pareto, f. Run (trend), g. Histogram 1. There is a situation you are unhappy about. It is a complicated situation, so it is difficult to keep track of all of the variables in your head. 2. You have a complicated process you would like to improve. It’s not clear that everyone would identify the same steps. 3. You have identified a number of problems and want to work on the biggest problem first. 4. You are often late for work and want to understand why. 5. You have identified several reasons for why you are late for work and want to prioritize the list. 6. A hospital speculates that it has admissions “bulges” because of holidays. 7. You want to determine how frequently something occurs. 8. You want to plot a relationship between two variables. 9. You want to separate abnormal from normal variation 10. You want to determine whether a process is stable. 11. A Manufacturer wants to know if there is a correlation between shelf life and the stability of their product. 12. A print shop starts to receive complaints about the density of its print. The shop workers figured the density was always the same. 13. Your company submits many proposals to the federal government. They have identified a number of problems with the process and want to fix them in order of importance. 14. The ordering process takes too long and you want to understand why. 15. The rooms listed in the Schedule of Classes are sometimes not the rooms that courses end up meeting in.