F. Fernandez www.albasynchrotron.es 28/10/2014 1 Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
An Advanced Linear Accelerator Facility for Microelectronic Dose Rate Studies P.E. Sokol and S.Y.Lee Indiana University.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Training Advanced Photon Source Operators: From the Street to the MCR Joseph Sutton Assistant Chief of Operations Advanced Photon Source Argonne National.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
1 1. Some recent views ( ) 2 Linac tunnel
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Dfernandez Computing & Controls Dec 3/4 MaxIV Control Systems for Accelerators and Automation David Fernández. ALBA Computing & Controls.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Operational experience of high-power RF at Diamond Light Source
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
B u d k e r I N P VEPP-4M tunnel view BINP accelerator facilities J/  and  physics  - lepton precise mass measurement  - physics 5 GeV collider.
Tango Meeting Grenoble September 5/ Claudio Scafuri, Elettra ELETTRA Status Claudio Scafuri
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S
Machine operation and daily maintenance management in SOLEIL
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
Magnet Power Supply System Overview
Coupling Correction at the Australian Synchrotron
ALBA capabilities towards contributions to the FCC study
Machine Operation and Progresses in SSRF
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
Workshop on Accelerator Operations
Operation Progress and Upgrade in SSRF
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Personnel Safety Systems
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source

F. Fernandez 28/10/2014 Outline Introduction –The ALBA synchrotron light source –How we operate Training –Needs –Steps –Manpower Experience and lessons learned 2

F. Fernandez 28/10/2014 Introduction – The ALBA synchrotron light source BOOSTER 100 MeV – 3 GeV STORAGE RING 3 GeV LINAC 100 MeV + 7 Beamlines + 2 BLs in construction

F. Fernandez 28/10/2014 Introduction – The ALBA synchrotron light source Booster and SR inst Booster comm. + SR inst SR comm BLs comm. and first Users Users Users and TopUp operators 6 new operators to replace and increase up to 7

F. Fernandez 28/10/2014 Introduction – How we operate 6 operators (7 in 2015) h TopUp from July’14 2 people on shift: operator + ACE OnCall service for critical subsystems Each operator specialized in one subsystem

F. Fernandez 28/10/2014 Training – Needs Basics of accelerators technologies and physics RF, PS, Beam Dynamics, Injection, Lifetime,... Operation procedures Startup, shutdown, beam preparation for users, injection,... First diagnose and intervention in all subsystems RF, Power Converters, Water cooling, Diagnostics, Pulsed elements, Vacuum, Device servers,... Radiation safety Radiation zones, radiation detectors, Personal Safety System,...

F. Fernandez 28/10/2014 Training – Steps Lectures on accelerators technologies and physics Procedures Radiation safety Hypothetical scenarios Hands on: Procedures and Fails Simulation 250 h 200 h 50 h 150 h FIVE MONTHS

F. Fernandez 28/10/2014 Training – Steps Lectures on accelerators technologies and physics 250 hours 1 lecture/day with homework Given by subsystems experts Including: Basics of accelerators Beam dynamics Acc. Subsystems (Linac, RF, Power Conv., Diagnostics,...) Equipment Protection System Personal Safety Systems Controls Civil engineering

F. Fernandez 28/10/2014 Training – Steps Procedures 200 hours Reviewed with Operators and Operators Group Head Followed in Control Room and Service Area Including: Startup and shutdown Beam preparation for users Injections HowTo Troubleshootings and reparations OPERATIONS WIKI

F. Fernandez 28/10/2014 Training – Steps Hypothetical scenarios 50 hours Examples You do not see any beam in the last fluorescent screen of the Linac. What would you do (flowchart)? You are trying to inject in the Booster, but yo do not see any beam in the DCCT. What would you do (flowchart)? You have beam in the Booster but you do not accumulate beam in the Storage Ring. What would you do (flowchart)? Done with Operators Group Head Discussion -> documentation -> discussion -> doc...

F. Fernandez 28/10/2014 Training – Steps Radiation safety 150 hours Legal requirement Generic course on Radiation Safety Given by an external company authorized by Nuclear Safety Council Covers: Interaction with matter, detection, dose, radiation zones, law,... Specific course on the ALBA synchrotron light facility Given by ALBA responsibles of the Accelerators, Safety and Controls Approved by the Nuclear Safety Council Covers radiation safety issues at ALBA ALBA accelerators ALBA beamlines Personal Safety System... and specific radiation safety issues at ALBA

F. Fernandez 28/10/2014 Training – Steps Hands on: Procedures and Fails Simulation 150 hours Injections (when decay mode) Startup / shutdown Beam preparation Participate in failures identification and solving Dedicated shifts on Fails Simulation

F. Fernandez 28/10/2014 Training – Manpower Subsystem Experts [h] Operators [h] Head of Operators [h] Total [h] Lectures Procedures Hypotetical cases--20 Radiation Safety80-- Hands On h

F. Fernandez 28/10/2014 Experience and lessons learned Hands on As Soon As Possible It is when they REALLY understand things Many questions arise Operations Wiki is also very useful for training It is good to involve existing operators on the training Hypothetical scenarios good for generating their own documentation Focus the firsts months only on training

F. Fernandez 28/10/2014 Questions?