Architecture-Driven Modernization PTF & Systems Assurance PTF Highlights from this Meeting: –SMM Update Standardization waiting on work that needs to be.

Slides:



Advertisements
Similar presentations
Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Advertisements

Section 4.9 Review Work Group Update to Board of Directors March 11, 2015.
Architecture-Driven Modernization Platform SIG KDM RFP.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA April , 2015.
Root Cause Analysis Procedure (IMSP525) Training
Human Resources Office of 1 Job Classification System Redesign Information Session Health Care and Animal Care October 28, 2014.
What is Business Analysis Planning & Monitoring?
MAC Committee Update Robert Kondziolka, MAC Chair.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Slide 1 Highlights from this Meeting: –Submissions Reviewed: Software Assurance Evidence Metamodel (SAEM) Final Submission –RFPs / RFCs / RFIs reviewed:
LOUGHBOROUGHCOLLEGE Business Support Self Assessment
Roles and Responsibilities
Discussions for oneM2M Semantics Standardization Group Name: WG5 Source: InterDigital Communications Meeting Date: Agenda Item: WI-0005 ASN/MN-CSE.
Compliance Monitoring and Enforcement Audit Program Background Information.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Assessment Workshop Title of the Project (date). Project Title Assessment Workshop October 25, 2015© Company Name All rights reserved2 Agenda Purpose.
ICT Standards and Guidelines Presenting the Project and the Team Sharif Hussein President, CNSI International.
™ ™ Assurance Ecosystem Djenana Campara Chief Executive Officer, KDM Analytics Board Director, Object Management Group (OMG) Co-Chair Software Assurance.
Highlights from this Meeting: –Discussions on CISQ formation and how SysA PTF might contribute to this forum –Discussions related to System Assurance ISO.
Common Terminology Services 2 CTS 2 Submission Team Status Update HL7 Vocabulary Working Group May 17, 2011.
1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.
FRYSC CONTINUATION PROGRAM PLAN. NEEDS ASSESSMENT COVERSHEETS RATIONALE Consistency across the state, while allowing for individual school and.
E-Government Initiative Geospatial Information One-Stop FGDC Coordination Group December 4, 2001 John Moeller.
Page 1 | Proprietary and Copyrighted Information Safeguards Gary Hannaford, Working Group Chair IESBA Meeting London January 12 – 14, 2015.
Evaluation Seminar Czech Republic CSF and OP Managing Authorities Session 3: Mid-Term Evaluation.
Slide 1 Highlights from this Meeting: –Submissions Reviewed: Software Assurance Evidence Metamodel (SAEM) Revised Submission –RFPs / RFCs / RFIs reviewed:
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
SwA Co-Chair and Task Lead Strategy Session Agenda Technology, Tools and Product Evaluation Working Group Status Briefing Co-Chair(s) Michael Kass (NIST),
1/28/ :02 PM Healthcare Services Specification Project (HSSP) HL7 Services Oriented Architecture SIG Entity Identification Service (EIS) RFP Discussion.
State of Georgia Release Management Training
Item 5 of the Agenda of the DIME/ITDG SG 24 February 2015 ESS EA TF : Progress report Enterprise Architecture Reference Framework (ESS EA RF)
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
CaBIG Architecture Working Group Face-To-Face Meeting  Best Practices SIG  March 18th, 2005  David Kane and Jim Harrison.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA September 15-16, 2015.
Team-Based Development ISYS321 Managing the Information Systems Project.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
March 18th, 2005http://jhh.opi.upmc.edu/main/cabig/BestPracticesSig1 caBIG Architecture Working Group Face-To-Face Meeting Best Practices SIG March 18th,
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
EDM Council / Object Management Group Semantic Standards Workstream Definitions and Detailed Objectives May 04, 2011.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Page 1 | Proprietary and Copyrighted Information Structure of the Code – Phase 2 Don Thomson, Task Force Chair IESBA Meeting New York, USA June 27-29,
Commercial Operations Sub-Committee Update to TAC
Proposed SysML v2 Submission Plan
Structure of the Code – Phases 1 and 2
Structure of the Code – Phase 2 TF Comments and Proposals
Structure of the Code Phase 1
Standards” and by the Council key Priorities
Guidance notes for Project Manager
Training of Process Facilitators
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Structure–Feedback on Structure ED-2 and Task Force Proposals
Assessment Workshop Title of the Project (date)
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
<month year> doc.: IEEE < e> <September 2018>
<month year> doc.: IEEE ptc November 2012
OMG Finance Domain Task Force (FDTF)
Informal document GRVA st GRVA, September 2018
Why a „test phase“? Overview
Risk Adjustment User Group
Overview of the recommendations on software updates
IESBA CAG Meeting New York, USA March 4, 2019
Report on Recent CSS and Committee Chairs Meetings
Finance Domain Task Force
SWRADIO DSIG Highlights from this Meeting: Sunday Tuesday
CSE4939W/4940 CS & E Design Lab I/II
Presentation transcript:

Architecture-Driven Modernization PTF & Systems Assurance PTF Highlights from this Meeting: –SMM Update Standardization waiting on work that needs to be completed by A. Picard – targeting August 15, 2010 –KDM Interoperability Planning Session Structure of demonstration will involve role playing and include stakeholder, analyst and consultant KDM Analytics, Benchmark Consulting, Mia-Software, Micro Focus (?), Adaptive and possibly Sparx and No Magic Effort will involve a COBOL CICS / Java system and UML input and output Nick Mansurov will act as prime coordinator of the effort Session to be held in Cambridge, MA – Sept. (2 hour session) 1 TC Meeting Date: 23 June 2010 Reporting Chair: Campara / Ulrich / Calloni Group page: Group Minneapolis, MN

Highlights from this Meeting: –Structured Metrics Repository (SMR) RFC Planning Session ADM TF will create RFC of various metrics to be approved by AB –Effort headed up by Bill Curtis – list to be created (Ulrich) and joined for PRM –RFC will NOT include any specific metrics –RFC will include sample metrics as were used in SMM –RFC will include repository structure and governance model –SMR will be implemented instance of SMM Metrics governance –There will be 2-tiered repository (submitted and approved) –First round of metrics will encompass software quality and systems assurance – coordinated effort by CISQ and ADM TF for SQ and SA –Once standard is adopted, FTF and RTF work will include cross-domain participants to begin including various families of metrics –FTF / RTF will resolve conflicts - –Metrics will undergo 1-year posting cycle, initiated through relevant task force or SIG RFC will be reviewed in Boston (Sept.) targeting Santa Clara (Dec.) for issuance 2 TC Meeting Date: 23 June 2010 Reporting Chair: Campara / Ulrich / Calloni Group page: Group Minneapolis, MN Architecture-Driven Modernization PTF & Systems Assurance PTF

Highlights from this Meeting: –Pattern Recognition Metamodel (PRM) RFC Discussion Reviewed RFC (posted as document # ADMTF_ ) Agreed to have Cast change to RFC working with KDM Analytics –Djenana will provide input on this to Bill Curtis list to be created (Ulrich) Should be generic and look at any patterns – not just code patterns Source of patterns would be any MOF model May possibly need extensions to address non-code patterns Relationship to CWE Standard from Systems Assurance is that CWE is non-machine-readable patter library and PRM is machine readable Will review RFC in Boston, targeting Santa Clara for issuance Assigned prime author: Bill Curtis 3 TC Meeting Date: 23 June 2010 Reporting Chair: Campara / Ulrich / Calloni Group page: Group Minneapolis, MN Architecture-Driven Modernization PTF & Systems Assurance PTF

Decisions Made: –Hold KDM interoperability session in Boston in Sept. –Target Pattern Recognition Metamodel (PRM) RFC issuance for Dec –Target Structured Metrics Repository (SMR) RFC issuance for Dec Future Deliverables (In-Process): –See Decisions Made Section Next Meeting Agenda – Cambridge Sept. 2010: –2 hour session on KDM interoperability –2 hours on Structured Metrics Repository (SMR) –2 hours on Pattern Recognition Metamodel (PRM) 4 TC Meeting Date: 23 June 2010 Reporting Chair: Campara / Ulrich / Calloni Group page: Group Minneapolis, MN Architecture-Driven Modernization PTF & Systems Assurance PTF

Highlights from this Meeting: –Discussions related to Threat Risk Assessment as our next area of focus Slides on Hazard Analysis were presented Draft RFI was reviewed Decision was made to revise RFI –Title of RFI: Risk Assessment –Objective: collect information on Risk Assessment models, artifacts, processes and vocabulary to be used as input to upcoming Risk Assessment Metamodel RFP –Discussion on Assurance Case Templates/Patterns and Process of writing ACs Process of creating Dependability Assurance Case was presented Decision was made that we will proceed with white paper on the subject in hope to encourage people/organizations to join/submit domain specific assurance case models that would be turned into AC patterns 5 TC Meeting Date: 24 June 2010 Reporting Chair: Campara / Calloni Group page: Group Minneapolis, MN Systems Assurance PTF

Documents from this meeting: –UDEF-Interop-23June2010 – sysa/ –Guardol-Language for guards – sysa/ –Hazard Analysis – sysa/ –Draft-HAM_RFI – sysa/ –DCaseWhitePaper – sysa/ –ACPM – sysa/ –ADMTF&Sysa-Minn_June_2010_Report – sysa/ Next Meeting Agenda – Cambridge – Sep : –Review, revise and publish Risk Assessment RFI –Review, revise and publish whitepaper on domain specific assurance case patterns 6 TC Meeting Date: 24 June 2010 Reporting Chair: Campara / Calloni Group page: Group Minneapolis, MN Systems Assurance PTF