C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.

Slides:



Advertisements
Similar presentations
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
Advertisements

CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
PoA Challenges & Opportunities
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Tips to a Successful Monitoring Visit
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF CPA S PREPARATION AND INCLUSION C ASE STUDIES AND E XPERIENCE.
Checking & Corrective Action
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Establish Verification Procedures (Task 11 / Principle 6)
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Quality Assurance/Quality Control Policy
Examine Quality Assurance/Quality Control Documentation
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING M ONITORING AND V ERIFICATION.
ISO 9000 Certification ISO 9001 and ISO
5.2 Personnel Use competent staff Supervise as necessary
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA LEVEL MONITORING, P REPARATION OF M ONITORING.
System Implementation
Accelerated EMS Session 4 – 28 January 2008.
Basics of Good Documentation Document Control Systems
 needs to be met  existing resources  content outline  contributor team  contract details  timeline.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
Server Virtualization: Navy Network Operations Centers
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Visit us at E mail: Tele: www.globalmanagergroup.com.
1 st Management Review Meeting on 1 st Sept,2010 “Bachat Lamp Yojana” 3223.
Audit and Us Gill White Regional Cytogenetics Centre Bristol.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
1 1 Internal Audit Annual Planning, Engagement Planning and Execution.
Expanded Public Works Programme EPWP 4 rd Summit Commission 4 1.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Use of Administrative Data Seminar on Developing a Programme on Integrated Statistics in support of the Implementation of the SNA for CARICOM countries.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Project management Topic 8 Quality Review. Overview of processes Prepare for Quality Review Questions list Meeting Agenda Review Meeting Sign-off Product.
Regulatory Issues in Laboratory Management
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
SWRCBSWRCBSWRCBSWRCB AB2886 Implementation Sacramento Training Sacramento Training August 13 & 14, 2001 Marilyn R. Arsenault ArsenaultLegg, Inc.
Project management Topic 8 Configuration Management.
Session 6: Data Flow, Data Management, and Data Quality.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)
DOCUMENT AND DATA CONTROL
Module 2 Key Phases of the Peer Review Programme
RECORDS AND INFORMATION
TEXAS DSHS HIV Care services group
Presentation transcript:

C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING R EPORTS AND V ERIFICATION

C ARBON P ARTNERSHIP F ACILITY 2 Training on CDM Operations Plans and Sub-ERPA Contracting presented by Dr. Balasankari 02 April 2014

C ARBON P ARTNERSHIP F ACILITY 3 Training on CDM Operations Plans and Sub-ERPA Contracting Basic Programme of Activities (PoA) structure PoA Coordinating / Managing Entity (CME) PoA Coordinating / Managing Entity (CME) CPA 1 Project Owner CPA 1 Project Owner CPA 2 Project Owner CPA 2 Project Owner CPA 3 Project Owner CPA 3 Project Owner CPA 4 Project Owner CPA 4 Project Owner CPA 5 Project Owner CPA 5 Project Owner In some cases, CME itself may be the CPA implementer

C ARBON P ARTNERSHIP F ACILITY 4 Training on CDM Operations Plans and Sub-ERPA Contracting Basic needs of PoA monitoring Implementation in line with registered PoA and CPA DD Measurement of monitoring parameters at the required frequency Maintenance of hard copy documents / records Creation and maintenance of electronic database

C ARBON P ARTNERSHIP F ACILITY 5 Training on CDM Operations Plans and Sub-ERPA Contracting General monitoring data flow diagram MeterOperator Officer CPA database Manager PoA database CPA level PoA level

C ARBON P ARTNERSHIP F ACILITY 6 Training on CDM Operations Plans and Sub-ERPA Contracting Components of effective PoA monitoring Effective verification of generated project data Deployment of trained monitoring staff Creation / maintenance of up-to-date database “ Both at PoA and CPA level ”

C ARBON P ARTNERSHIP F ACILITY 7 Training on CDM Operations Plans and Sub-ERPA Contracting Importance of data management systems An effective data management system must be implemented at PoA and CPA level to: Provide evidence for CERs generated Collect and store the monitored data for verification Avoid duplicate / discrepant records Ensure quality of data generated

C ARBON P ARTNERSHIP F ACILITY 8 Training on CDM Operations Plans and Sub-ERPA Contracting Basic requirements of data management system » Standard format / template across all CPAs » Generation of unique ID for each record » Completeness of data collected » Correctness of data recorded » Effective conversion from hard copy to electronic copy » Centralized storage and update

C ARBON P ARTNERSHIP F ACILITY 9 Training on CDM Operations Plans and Sub-ERPA Contracting PoA level monitoring A Project manager must be assigned at CME level to carry out the following tasks: Monitor overall programme execution Set up project management team Arrange training for CPA implementers and other stakeholders Support DOE during verification Deployment of trained monitoring staff

C ARBON P ARTNERSHIP F ACILITY 10 Training on CDM Operations Plans and Sub-ERPA Contracting PoA level monitoring Creation / maintenance of up-to-date database “ A strong central database is needed for effective PoA implementation”  Must be up to date  Accurate and error free  Easy to retrieve details of CPAs

C ARBON P ARTNERSHIP F ACILITY 11 Training on CDM Operations Plans and Sub-ERPA Contracting PoA level monitoring A Database administrator must be assigned at CME level to carry out following tasks: Prepare templates for data collection / reporting Collect data from CPAs Maintain hard copy /soft copy documents collected from CPAs Create a programme level central electronic database Creation / maintenance of up-to-date database

C ARBON P ARTNERSHIP F ACILITY 12 Training on CDM Operations Plans and Sub-ERPA Contracting PoA level monitoring A Verification officer must be assigned at CME level to carry out following tasks: Provide CDM training to CPAs Carry out site inspection to project locations Inspect monitoring procedures implemented at CPA level Cross-check data reported and data at project locations Effective verification of generated project data

C ARBON P ARTNERSHIP F ACILITY 13 Training on CDM Operations Plans and Sub-ERPA Contracting PoA level monitoring Documentations required at PoA level Legal / contract agreement with all stakeholders MOM of various co-ordination meetings Operations manuals & training materials Monitoring data from each CPAs Monitoring survey reports CPA inspection reports

C ARBON P ARTNERSHIP F ACILITY 14 Training on CDM Operations Plans and Sub-ERPA Contracting Best practices in PoA level monitoring Decide all templates/formats and procedure to be followed before start of crediting period Setup regional offices and distribute responsibilities Have frequent meeting with all stakeholders Make occasional site visit to project locations Prepare quality operations manual / training materials on CDM monitoring

C ARBON P ARTNERSHIP F ACILITY 15 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring A Monitoring officer must be assigned at CPA level to carry out following tasks: Install monitoring equipments as per monitoring plan Train plant operators on data recording Prepare reports based on monitored data Support DOE during verification Deployment of trained monitoring staff

C ARBON P ARTNERSHIP F ACILITY 16 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring Creation / maintenance of up-to-date database Primary records: One record book / register for each monitoring parameter Second records: Necessary support documents for each of the monitoring parameter Electronic database : Electronic conversion from hard copy records

C ARBON P ARTNERSHIP F ACILITY 17 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring A database administrator must be assigned at CPA level to carry out following tasks: Create CPA level database Maintain the hard copy records of data monitoring Conversion of hard copy data to electronic copy Submission of monitored data to CME Creation / maintenance of up-to-date database

C ARBON P ARTNERSHIP F ACILITY 18 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring Best practices in documentation o Mention the date of recording/measurement clearly o All records must be approved by supervisor/next level authority o Do not correct / over write documents o Any corrections made must be approved o Store all documents/records in one single location o Do an internal review of documents

C ARBON P ARTNERSHIP F ACILITY 19 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring Other documentations: Calibration records for meters Lab reports for any tests Monitoring sample survey records Legal / contract / loan agreements Technical specifications Operations manual Training materials

C ARBON P ARTNERSHIP F ACILITY 20 Training on CDM Operations Plans and Sub-ERPA Contracting CPA level monitoring Verification of monitored data can be carried out by Monitoring officer itself Check for duplicate data Cross check hard copy data and electronic data Check for consistency Effective verification of generated project data

C ARBON P ARTNERSHIP F ACILITY 21 Training on CDM Operations Plans and Sub-ERPA Contracting Best practices in CPA level monitoring Use only templates / formats given by CME for data recording Install equipments only as per type / accuracy stated in PoA and CPA DD Carry out calibration of equipments at required frequency Communicate immediately on any issues identified in monitoring to CME Maintain all project related documents / files in one central location

C ARBON P ARTNERSHIP F ACILITY 22 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring Surveys  Calculate sample size as per confidence level and error margin  Study and select suitable sampling method  Design standard template to record survey data  Carry out surveys at PoA level or CPA level as required  Finish the survey in stated time period

C ARBON P ARTNERSHIP F ACILITY 23 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring Surveys  Always have 20% additional samples for non-responses  Properly document survey results  Prepare a consolidated report  File all filled in survey template in order

C ARBON P ARTNERSHIP F ACILITY 24 Training on CDM Operations Plans and Sub-ERPA Contracting Quality control & quality assurance Two step quality verification of data to be done First quality check by monitoring officer at CPA level Second quality check by database administrator / inspection team at PoA level CPA level data can also be checked through field inspections by CME

C ARBON P ARTNERSHIP F ACILITY 25 Training on CDM Operations Plans and Sub-ERPA Contracting Quality control & quality assurance CPA level check PoA level check Monitoring officerCPA databasePlant records Reports Database administrator PoA database

C ARBON P ARTNERSHIP F ACILITY 26 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring - Verification - Issuance

C ARBON P ARTNERSHIP F ACILITY 27 Training on CDM Operations Plans and Sub-ERPA Contracting Stakeholders in monitoring to issuance Collect data and submit to CME CPA implementer Prepare monitoring report CME Publish MR and site verification DOE Issuance of CERs UNFCCC Receive & Pay for CERS WB

C ARBON P ARTNERSHIP F ACILITY 28 Training on CDM Operations Plans and Sub-ERPA Contracting Step by step process in monitoring to issuance Preparation of monitoring report (MR) Hiring a DOE Publishing of MR in UNFCCC site by DOE Site visit and verification by DOE Preparation of Draft Verification Report (DVR) by DOE along with Corrective Action Required (CARs) Clarifications (CLs) Future Actions Required (FARs)

C ARBON P ARTNERSHIP F ACILITY 29 Training on CDM Operations Plans and Sub-ERPA Contracting Step by step process in monitoring to issuance Response to DOE comments by CME Review of CME responses by DOE Finalizing Verification Report by DOE Submission of issuance request to UNFCCC Final review by UNFCCC and issuance of CERs

C ARBON P ARTNERSHIP F ACILITY 30 Training on CDM Operations Plans and Sub-ERPA Contracting Preparation of monitoring reports Step 1: Consolidate the monitored data for the monitoring period Step 2: List the documents/proofs for the monitored data Step 3 : Calculate the CERs for the monitoring period Step 4: Get the latest monitoring report format from CDM website Step 5: Update the details in monitoring report Step 6 : Cross check details/process stated in monitoring report with registered PoA and CPA DD

C ARBON P ARTNERSHIP F ACILITY 31 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring report - DOs & DONTs Confirm the first and last date of the reported monitoring period Provide detailed timeline of activities carried out Add foot notes wherever required to provide supporting information Mention any deviations from monitoring plan clearly with explanations Explain in detail the CME level and CPA level monitoring done

C ARBON P ARTNERSHIP F ACILITY 32 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring report - DOs & DONTs x Change the start date of crediting period x Alter the format of CDM monitoring report x Provide data without support documents x Revise tools or methodologies referred

C ARBON P ARTNERSHIP F ACILITY 33 Training on CDM Operations Plans and Sub-ERPA Contracting What if deviations happen during implementation ? Case 1: Minor changes like temporary deviation from monitoring plan, different accuracy levels of equipments, measurement locations, etc. o DOE conducting the verification may assess the impact of changes. o CERs may be deducted if there is significant impact in ER calculation

C ARBON P ARTNERSHIP F ACILITY 34 Training on CDM Operations Plans and Sub-ERPA Contracting What if deviations happen during implementation ? Case 2: Major changes like project design or capacity or technology, crediting period, permanent change in monitoring plan, etc... o PDD must be revised and Prior approval must be obtained from UNFCCC before issuance o CER issuance will be very much delayed (minimum of another 6 months)

C ARBON P ARTNERSHIP F ACILITY 35 Training on CDM Operations Plans and Sub-ERPA Contracting Preparation for site verification Arrange training on verification to all stakeholders Prepare of list of documents for verification Check for all database at CME and CPA level Keep all support documents ready

C ARBON P ARTNERSHIP F ACILITY 36 Training on CDM Operations Plans and Sub-ERPA Contracting DOE Site verification process Kick-off meeting at CME office Audit of documents at CME office Site visit to CPA project locations Inspection of equipments Inspection of meters installed Audit of documents at the CPA implementer office Check of monitoring practices Other CDM requirements Closure meeting at CME office

C ARBON P ARTNERSHIP F ACILITY 37 Training on CDM Operations Plans and Sub-ERPA Contracting Verification to Issuance - Time frame DOE uploads documents in UNFCCC website Request for Issuance kept in waiting queue (4 weeks) Completeness Check (1 week) Information and Reporting Check (3 weeks) Issuance kept for public review (4 weeks) Issuance of CERs

C ARBON P ARTNERSHIP F ACILITY 38 Training on CDM Operations Plans and Sub-ERPA Contracting Questions & Discussions