1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.

Slides:



Advertisements
Similar presentations
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Advertisements

Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
INPO Update CMBG Meeting June 2013
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
A Brief History of CM in the Nuclear Industry and the CMBG
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
How to Document A Business Management System
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Systems Engineering in a System of Systems Context
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Configuration Management
1 ANSI/NIRMA Standard CM 1.0 – 2007 Update Presented By: Rich Giska NIRMA ANSI Coordinator.
Welcome ISO9001:2000 Foundation Workshop.
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Effective Methods for Software and Systems Integration
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Standards of Practice Course
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Standards for Internal Control in the Government Going Green Standards for Internal Control in the Federal Government 1.
1 Digital I&C Systems Configuration Management Presented By: David E Woods Senior Engineer – Electrical/I&C Design Engineering June 21, 2011.
New Nuclear Power Plant Configuration Information Management Transition to a Data Centric Paradigm SCE&G VCS CMIS Strategy Steven F. Fipps.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Georgia Institute of Technology CS 4320 Fall 2003.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
A Brief History of CM in the Nuclear Industry and the CMBG Presented By: John Parler CMBG Steering Committee June 25, 2012 Chicago, Illinois.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston,
State of Georgia Release Management Training
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Implementing Program Management Standards at Duke Energy.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Certifying Data in Controlled Databases for Direct Use ERIC PACE CM GROUP SUPERVISOR 1.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Software Project Configuration Management
Software Configuration Management
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
A Brief History of CM in the Nuclear Industry and the CMBG
Presented By: Mike Stout – PPL Glenn Neises - INPO
NRC Cyber Security Regulatory Overview
How to Manage Guidance from Multiple Organizations into CM
A Brief History of CM in the Nuclear Industry and the CMBG
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Portfolio, Programme and Project
Vendor Technical Information
I&C requirements and configuration management
Presentation transcript:

1

2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead

3 Evolution of ANSI/NIRMA Standard Response to Industry-Recognized Issues NIRMA Position Papers Millstone Event NIRMA TG-19 History of ANSI/NIRMA Standard

4 Response to Industry Issues In mid-1980s, NRC initiated Safety System Functional Inspections (SSFIs) based on events/findings such as:  IE => Piping & structural analysis issues with plant installations  GL =>ATWS at Salem Plant – Rector Trip Switchgear  NUREG-1154 => Davis Besse Loss of all Feedwater Basic objective of SSFIs was to ensure Licensee could produce documentation that:  Represented the ‘as-built’ facility  Verified the facility was within the authorized design basis  Supported the ability to maintain the plant  Demonstrated proper controls are applied for facility changes

5 Results of SSFIs Identified Major Issues, e.g.:  Plant changes not documented  Design documents: o Didn’t reflect the ‘as-built’ plant o Not readily retrievable by system or component o Updates of changes not incorporated into all affected documents  Vendor technical information: o Not related to applicable components o Vendor manuals not retrievable o Vendor bulletins not incorporated into applicable procedures Raised concerns on Licensee’s ability to confirm as-built plant was in compliance with its design and licensing bases

6 Industry Reactions NRC required Licensees provide evidence that plants were within their design and licensing bases Utilities committed to reconstituting their design basis for operating units, i.e., Design Basis Reconstitution New plants under construction also committed to developing design basis documentation NUMARC Task Force published guidance for Design Basis Reconstitution (NUMARC 90-02) NRC issued NUREG/CR 5147 on CM Program attributes Design Basis Reconstitution initiatives were launched with expenditures in the $100s of Millions of Dollars…!

7 NIRMA’s Assessment & Actions Taken NIRMA noted that non-adherence to design change control impact analysis requirements of ANSI N42.11 (QA for Design Control) was a major cause of design basis issues BUT design control was not CM… Proposed that key underlying issues were ineffective processes, information management and integration of information flows in work processes across the entire plant organization Suggested overall issue was absence of Configuration Management Programs which complimented design and document control NIRMA Configuration Management Committee (CMC) was formed in 1987 to focus on the issues and develop guidance materials for establishing effective CM Programs

8 NIRMA Direction Taken on CM CMC focused on a Position Paper on CM for nuclear plants:  Engaged experienced multi-disciplined team including: o Engineering, Design, Quality Assurance, Procurement o Operations, IT, Document Control & Records Management  Took holistic approach to CM, i.e., beyond design and design basis  Focused on information management, business processes and governing changes of related information and flows (i.e., impact analyses)  Applied CM principles used in Dept. of Defense CM Programs to nuclear plants, i.e., baseline, change control, status accounting and verification / validation (or audit)  Translated these principles into core elements of a CM Program  NIRMA Position Paper PP-02, Rev. 0 was issued in 1989

9 NIRMA Continued CM-Related Efforts CMC identified need for business process improvements:  Interfaces of multiple processes not well-defined  Isolated processes were used to achieve specific tasks  Focused on multiple ways changes could be implemented and ability to perform true impact analyses for each type of change  Position Paper PP-03 issued on CM Enhancement Programs CMC recognized information management not an industry strength with limited importance by management:  Multiple islands of data existed in individual silos – “My Data”  After plant changes, not all duplicated instances of data were updated  Position Paper PP-04 issued on Configuration Management Information Systems

10 Coordination with DOE on CM DOE developed CM Program guidance and directives in DOE Order 1073 issued in 1993:  Adopted many of the core elements and principles in NIRMA PP-02  Expanded to provide detailed guidance for DOE facilities  NIRMA CMC and DOE collaborated to incorporate applicable guidance from DOE Order 1073 into PP-02  NIRMA PP-02, Rev. 1 was issued in 1994  NIRMA and DOE also collaborated on development of NIRMA TG-19 which was the foundation document for the initial ANSI/NIRMA Standard CM 1.0 issued in 2000

11 Events Driving CM Program Progress 1994 – CM Practitioners hosted by PP&L:  Discussed current CM issues and practices  NIRMA, as an approved ANSI Standards Developer, suggested an industry standard on CM should be considered 1995 – CMBG established 1996 – Millstone Shutdown:  NRC’s 10CFR50.54(f) letter issued with major focus on CM  Triggered industry initiatives on CM 1996 – NIRMA engaged with CMBG to pursue industry standard:  Began developed of NIRMA Technical Guideline TG-19  Birth of the 3-Ball Model…!

12 ANSI/NIRMA Standard History NIRMA certified as an ANSI Approved Standard Developer NIRMA TG-19 was issued:  Reflected CM Principles for Commercial Nuclear Power and DOE Facilities  Became the base document for development of the desired ANSI/NIRMA industry standard for Configuration Management 2000 – ANSI/NIRMA Standard CM 1.0 issued:  An industry consensus standard involving review and balloting by industry representatives of multiple interest groups within the nuclear industry, e.g.: o NSSS vendors, A/E Firms and DOE Contractors o Nuclear Insurers, Industry organizations and Independent industry experts o Nuclear utilities and nuclear facilities’ operators  The Standard provides a CM Program framework against which individual nuclear facility organizations can benchmark their respective CM Programs

13 ANSI/NIRMA Standard Follow-on Activities 2005: Reference INPO AP Configuration Management Process Description:  CMBG requested revisions for INPO AP-929  Wanted consistency with ANSI/NIRMA Standard CM 1.0  INPO issued Rev. 1  2007: ANSI/NIRMA Standard CM 1.0 revised to incorporate:  Industry lessons learned since initial issuance in 2000  CM Process Model  Equilibrium Restoration Concepts and Guidance  Continued monitoring of evolving industry issues through CMBG

14 Summary of History Configuration Management Committee/Programs Business Unit NIRMA PP-02 TG-19 ANSI/NIRMA Std Rev Rev Rev CM CM Configuration Management Benchmarking Group CMBG 1993

15 The Windshield View What Lies Ahead for the ANSI/NIRMA Standard CM 1.0

16 ANSI/NIRMA CM Standard - Going Forward 2007 revision was assessed regarding needed updates:  CMBG agreed no updates were required at this time  Any issues going forward would be addressed in later revision NIRMA decision is to reaffirm 2007 revision:  Administrative processes required by ANSI for Reaffirmation  Anticipated issuance of 2014 revision in Q3  No material changes to the content – only revised Foreword describing basis for reaffirmation Industry inputs for updates will be collected over next few years for next revision in 2018 or 2019…!

17 CMBG Inputs and Support Steering Committee has agreed topics for consideration of new content of ANSI/NIRMA Standard will be requested of CMBG members and addressed by Task Teams:  Breakout sessions at CMBG Conferences to be leveraged for inputs  Issues will be defined & research conducted by Teams  Recommendations provided to NIRMA for next update CMBG will be a voting member for all ANSI/NIRMA balloting :  ANSI requires voting from diversified “interest categories”  Process is required to achieve the industry consensus for standards  CMBG represents “Industry Interest Group” category Inputs from CMBG members to start in Breakout session today!

18 CM Guidance for New Nuclear Plant Projects

19 CM for New Nuclear Plant Projects Focus of ANSI/NIRMA Standard CM 1.0 is on operating plants New nuclear plant projects have unique CM issues that don’t exist for operating units today, e.g.:  10CFR52 licensing process & issuance of combined operating license (COL) that covers construction, commissioning and operation  CM expected to be implemented during the construction phase of a project rather than simply after Turnover to owner operator  Developing CM-oriented relationships to support impact analyses are being pursued to enhance information turnover to owner operators: o EPRI PIM initiative designed to establish common terminology to support automated transfers of information during new plant project lifecycle o NIRMA developing Information Handover and Turnover guidance materials to support CM Programs for new operating plants

20 Industry Guidance - New Nuclear Plants EPRI addressed CM for New Nuclear Plant Projects:  EPRI Technical Report , April 2011 – “Elements of Pre- Operational and Operational Configuration Management for a New Nuclear Facility”  Guidance addresses all aspects of CM: o Emphasizes need to address CM early and establish roles and responsibilities o Focus on Licensee’s CM obligations, expectations of EPC and information flows during multiple phases of a project EPRI & NIRMA agreed nuclear new build guidance in ERPI Technical Report was adequate at this time Need for new industry standard for CM for new nuclear plant projects will be determined as new build initiatives evolve

21 Thank You…!