1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Recent Social Science Research to Enhance Emergency Preparedness Exploratory Mini-Workshop on Social Science & Meteorological Operations May 3, 2010 Sara.
FEMA Updates April 10, Welcome and Introductions Andy Mitchell Division Director Technological Hazards Division National Preparedness Directorate.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC Studies on Protective Actions Lori Dotson, Joe Jones Sandia National Laboratories National Radiological Emergency Preparedness Conference Harrisburg,
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
Branch Technical Position on Concentration Averaging and Encapsulation
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
1 Update: Changes and Innovations in REP Exercises Joseph D. Anderson, Branch Chief U.S. Nuclear Regulatory Commission Office Nuclear Security & Incident.
Revision of NUREG-0654 Supp. 3 RI Scheduling Conference December 11, 2008 Mystic, Ct Randy Sullivan, CHP.
1 Implementation of New Exercise Scenario and Demonstration Area Requirements April 21, 2009 Jacques Singleton Program Specialist, Emergence Management.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Nuclear Energy Institute Initiatives NRC Region I/FEMA I, II, & III Joint Scheduling Conference Susan Perkins-Grew Senior Project Manager.
Radiological Emergency Response Plan (RERP) Emergency Planning Overview- Now and in the Future Vermont Division of Emergency Management and Homeland Security.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
Enhancements to the NRC Allegation Program Technical Session: NRC/Industry Response to Security Inattentiveness Concerns Lisamarie L. Jarriel Agency Allegation.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Telephone Survey: Public Tendencies in Emergency Response Regulatory Information Conference March 10, 2009 R. L. Sullivan, NSIR.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste Gregory Suber, Branch Chief Environmental Protection & Performance Assessment.
1 Update on Emergency Preparedness and Response Activities 2009/2010 NRC Region I/FEMA I, II & III Joint Emergency Preparedness Information Conference.
Update on NRC Low-Level Waste (LLW) Program Activities.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
1 RIC 2009 Update on Significant Emergency Preparedness Issues “Significant Observations: Hostile Action-Based EP Drill Initiative” Joseph D. Anderson.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Emergency Preparedness During Decommissioning
Randall (Randy) Snyder, PT, MBA Division Director January 27, 2016
NRC’s Category 3 Source Security and Accountability Initiatives
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Office of Nuclear Material Safety and Safeguards (NMSS)
Industry Guidance on Part 21 Evaluation and Reporting
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
NRC Cyber Security Regulatory Overview
Robert Kahler Branch Chief
Advance Notice of Proposed Rulemaking 10 CFR Part 20
Overview of NRC Low-Level Waste Activities and Initiatives
U.S. Nuclear Regulatory Commission Radiation Safety Standards
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
NRC’s Low-Level Radioactive Waste Program
Research and Test Reactor Safety: The Regulatory Perspective
Adding Nuclear Power to the Grid
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Decommissioning Rulemaking
NRC Update of LLW Emerging Issues
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Presentation transcript:

1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security & Incident Response Robert Kahler Branch Chief, Inspection & Regulatory Improvements Branch Randy Sullivan Senior Emergency Preparedness Specialist

2 Status of Emergency Preparedness Rulemaking & Guidance Robert Kahler, Branch Chief Inspection & Regulatory Improvements Branch Division of Preparedness & Response Office of Nuclear Security & Incident Response April 21, 2009

3 Current EP Rulemaking 11 EP Rulemaking Issues –Issues Identified in SECY –10 CFR 50.47(b), 10 CFR 50.54(q), & 10 CFR Part 50, Appendix E Affected –NRC Bulletin Items Codified SECY Submitted in January 2009 Issuance of Commission SRM

4 Proposed Rule Comments Proposed Rule Documents –ADAMS – Docket: NRC Day Comment Period Multiple Public Meetings –Different Locations & Venues –Joint Sessions with FEMA –Pursuing Web Conferencing for “Virtual” Participation Opportunities

5 Associated EP Guidance New Reg. Guide for Changing Emergency Plans (10 CFR 50.54(q)) New NUREG/CR for Updating Evacuation Time Estimates Interim Staff Guidance for Remaining Topics FEMA Providing Offsite Guidance Guidance Published in Conjunction with Proposed Rule

EP Rulemaking & Guidance Matrix #RULEMAKING TOPICONSITE GUIDANCE 1On-Shift Multiple ResponsibilitiesInterim Staff Guidance 2Emergency Action Levels for Hostile Action EventsReg. Guide Emergency Response Organization Augmentation at Alternative Facility Interim Staff Guidance 4Licensee Coordination with Offsite Response Organizations Interim Staff Guidance 5Protective Actions for Onsite PersonnelInterim Staff Guidance 6Challenging Drills and ExercisesInterim Staff Guidance 7Alert and Notification System Backup MeansInterim Staff Guidance 8Emergency Classification TimelinessInterim Staff Guidance 9Consolidated Emergency Operations Facility – Performance-Based Approach Interim Staff Guidance 10Evacuation Time Estimate UpdatingNew NUREG/CR 11Emergency Plan Change ProcessNew Reg. Guide

7 Requests for Input Inclusion of National Incident Management System/Incident Command System in EP programs Shift staffing and augmentation Expanding to non-power reactor licensees requirements for: –Detailed analyses demonstrating timely performance of emergency response functions by on-shift personnel –Capability to assess, classify, and declare an emergency condition within 15 minutes –Hostile action event emergency action levels Effective date Implementation schedule

8 Contact Robert Kahler

9 Revision of NUREG-0654 Supp. 3 Randy Sullivan, CHP April 21, 2009

10 Introduction Staff recommended a review of protective action recommendation (PAR) guidance Commission directed that the study proceed Sandia study began in late 2004

11 PAR Study Objective Investigate if the use of alternative protective actions can reduce public dose during severe accidents

12 Alternatives Tested Shelter in place for various times – (within current regimen, but limited use) Preferred sheltering for various times (in large public buildings, etc.) Lateral evacuation (crosswind) Staged evacuation (evacuation nearby, initially shelter others)

13 Results Revise NUREG-0654, Supplement 3 –Evacuation remains major element –Consider staged evacuation –Shelter in place followed by evacuation is more protective than standard PAR for large early release at sites with longer evacuation times

14 Focus Groups and Telephone Survey People will implement protective actions when asked Message affects rate of compliance Emergency responders will report for duty

15 Implementation of Study Conclusions Draft PAR Logic Diagram Gather stakeholder feedback Align with FEMA Formal review and approval process Issue guidance (2010)

16

17

18

19

20

21

22

23 Questions? collections/nuregs/contract/cr6953/ Randy Sullivan