DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ISTISNA’.
Construction Contracts with Private Owners
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
© 2007 Prentice Hall, Business Law, sixth edition, Henry R. Cheeseman Remedies for Breach of Sales and Lease Contracts.
Crossing Agreements Canadian Best Practice Crossing Agreements A Canadian Best Practice Brad Watson TransCanada Pipelines and Alberta Common Ground Alliance.
REMEDIAL MEASURES.
Presented By: John D. Miller
LECTURE 7 CLAIMS RELATED TO SUB-CONTRACTORS
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
111 Attendance at the two dates you are assigned is mandatory Presentation date Evaluation date Attendance at the other eight (8) class dates will count.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Independent Contractors What’s the Relationship? Presented by CIRMA.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
Topic 9. Insurance Policy Provisions BUS 200 Introduction to Risk Management and Insurance Jin Park.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
An Act of Parliament to provide for compensation to employees for work related injuries and diseases contracted in the course of their employment and for.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Contract Law for Paralegals: Traditional and E-Contracts © 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Remedies for Breach.
Minimum Wages Act History of Minimum Wages ILO Convention no26 in1928 Recommended Machinery for Fixation of minimum wages The Standing Labour Committee.
05/12/08 Insurance Risk/Regulatory Compliance Department Las Vegas Division.
Contract price & payment
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Insurance & Bonding for Contractors February 2, 2009 Presented by: David Hale Hale & Associates, Inc. Fairbanks, Alaska.
BONUS CLAUSE Paragraph 1, Page 4 ISSUE:A process is needed for adjusting bonus and rental amounts when acreage calculation errors are timely discovered.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
CHAPTER 18 PERFORMANCE AND REMEDIES DAVIDSON, KNOWLES & FORSYTHE Business Law: Cases and Principles in the Legal Environment (8 th Ed.)
Compensation events and claims Presented by Prof. Khem Dallakoti.
CONSTRUCTION CONTRACTS – MASTER CHART
The contract of Sale Commercial Law.
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Business Law and the Regulation of Business Chapter 50: Bailments and Documents of Title By Richard A. Mann & Barry S. Roberts.
1 Local Government Liability Pool. Background W.S enabled the state to create a state administered self insurance account that will offer.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Business Law MAN-3 Bakiev Erlan, Ph. D. PERFORMANCE AND REMEDIES.
1 Additional Commercial Contract Types Public Meeting October 19, 2004.
And other issues. The General Contract Form is included in every solicitation requiring insurance. The general requirements of the contract.
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
New Time and Material Requirements Glenn Baer March 2007.
Minimum Wages Act 1948.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
1 Unification of contract law and Russian law ICC documents.
MECHANICS LIENS: NEW CHANGES & OLD ISSUES Ryan Hiss, Lyman & Nielsen, LLC Brienne Berscheid, Chicago Title Insurance Company.
1 Consent to Subcontract Breakout Session # D12 Name: Rita Wells Daniel Johnson Anthony Simmons Date:July 12, 2011 Time:11:15 – 12:30.
WORKER CLASSIFICATION. A WORD ON POLICY Financial policy promotes the proper stewardship and general guidelines for the appropriate and legal uses of.
Insurance in Construction
Consent to Subcontract
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
REMEDIES FOR BREACH OF SALES AND LEASE CONTRACTS
ARCH 435 PROJECT MANAGEMENT
Find the Problems with the Provisions May 11, 2016 Presented By:
REMEDIES FOR BREACH OF SALES AND LEASE CONTRACTS
Construction Contract Administration
Presentation transcript:

DPW General Conditions Articles 32 through 37

Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate Contract Terminate Contract  34 Subletting or Assigning of Contract  35 Contractor’s Insurance  36 Foreign Materials  37 Hours of Work

Article 32 Owner’s Right to Withhold Payment   32.1 The Commissioner may withhold a portion of any Payment due the Contractor that may, in the judgment of the Commissioner, be necessary:   To assure the payment of just claims then due and unpaid to any persons supplying labor or materials for the Work.   To protect Owner from loss due to defective, unacceptable or non-conforming Work not remedied by the Contractor.   32.1To protect the Owner from loss due to injury to persons or damage to the Work or property of other Contractors, Subcontractors, or others caused by the act or neglect of the Contractor or any of its Subcontractors.

Article 32 Continued   32.2 The Owner shall have the right to apply any amount withheld under this Article as the Owner may deem proper to satisfy protection from claims. The amount withheld shall be considered a payment to the Contractor.   32.3 The Owner has the right to withhold payment if the Contractor fails to provide accurate submissions of Submittals, up date the status including but not limited to the following: As-Built Drawings, request for information (RFI) log, Schedule, submittal log, Change Order log, certified payrolls and daily reports and all other requirement of the Contract Documents.

Article 33 Owner’s Right to Stop Work or Terminate Contract Section 33.1 Right to Stop Work   33.1 The Commissioner shall have the authority to suspend the Work wholly or in part, for such period or periods as the Commissioner considers being in the best interests of the State, or in the interests of public necessity, convenience or safety. During such periods the Contractor shall store all materials and equipment, in such a manner to prevent the materials and equipment from being damaged in any way, and the Contractor shall take precautions to protect the Work from damage.

33.1 Right to Stop Work Summarized   (If the delay is deemed excessive) …the Contractor shall submit to the Commissioner in writing a request for a Contract adjustment within 7 Days of receipt of the notice to resume Work...   The Commissioner shall evaluate any such requests received… Commissioner will make a reasonable adjustment, excluding profit, of the Contract terms…   No Contract adjustment will be made unless the Contractor has submitted the request for adjustment within the time prescribed.   No Contract adjustment will be made under this Article to the extent that performance would have been suspended or delayed by any other cause within the Contractor’s control or by any factor for which the Contractor is responsible under the Contract; or that such an adjustment is provided for or excluded under other term or condition of this Contract.

Article 33.2 Termination   33.2 …the State may terminate the Contract whenever the Commissioner determines … that such termination is in the best interests of the State. Any such termination shall be effected by delivery to the Contractor of a written Notice of Termination specifying the extent to which performance of Work under the Contract is terminated, and the date upon which such termination shall be effective.   …the Contractor shall be entitled to reasonable compensation as determined by the Commissioner, however, no claim for lost Overhead or profits shall be allowed.   All Work and materials obtained by the Contractor for the Work, that have been incorporated into the Work, inspected, tested as required, accepted by the Commissioner, and paid for by the State, shall become the property of the State.   Materials obtained by the Contractor for the Work… that are not incorporated into the Work, shall, at the option of the Commissioner, be purchased from the Contractor at actual cost as shown by receipted bills. To this cost shall be added all actual costs for delivery at such points of delivery as may be designated by the Commissioner, as shown by actual cost records.   Termination of the Contract shall not relieve the Contractor or its Surety of their responsibilities for the completed Work, nor shall it relieve the Contractor’s Surety of its obligations to ensure completion of the Work and to pay legitimate claims arising out of Work.

Article 34 SUBLETTING OR ASSIGNING OF CONTRACT   34.1 The Contract or any portion thereof, or the Work provided for therein, or the right, title, or interest of the Contractor therein may not be sublet, sold, transferred, assigned, or otherwise disposed of to any person, firm, or corporation without the written consent of the Commissioner.   34.2 No person, firm, or corporation other than the Contractor to whom the Contract was awarded shall be permitted to commence Work at the site of the Contract until such consent has been granted.

Article 35 Contractor’s Insurance General Information  When in doubt ask…  Procurement handles the initial certificate collection  Need to get certificates from subs, unless contractor is covering subs under his policy  State is to be named as an also insured or loss payee on all policies  Contractor(s) must keep all insurances in force for the duration  Contractor(s) responsible for all costs and all deductibles.

Types of Insurance Required  Commercial General Liability  Explosion, collapse, and underground (XCU) or hazardous material riders added as appropriate for the project  Owners & Contractor’s Protective Liability  Automobile Liability  Excess Liability  Workers’ Compensation & Employer’s Liability  Builder’s Risk  Inland Marine/ Transit Insurance

Article 36 Foreign Materials   36.1 Preference shall be given to articles or materials manufactured or produced in the United States, Canada, and Mexico, (the members of the North American Free Trade Agreement (NAFTA)); and the products shall meet all of the referenced standards and Specifications for conditions of performance, quality, and price with duty being equal.   36.2 Only articles or materials manufactured or produced in the United States, Canada, and Mexico, (the members of the North American Free Trade Agreement (NAFTA)), will be allowed. The foregoing provisions shall not apply to foreign articles or materials required by the Contract Documents.

Article 37 Hours of Work   37.1 No person shall be employed to work or be permitted to work more than eight (8) hours in any Day or more than forty (40) hours in any week for any Work provided in the Contract, in accordance with Connecticut General Statute Section .  37.2 The operation of such limitation of hours of work may be suspended during an emergency, upon the approval of the Commissioner, in accordance with Connecticut General Statute Section