March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
FAST Procurement and Pricing May 18, 2015 FAST Workshop 1.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
1Texas Nodal Nodal Day-Ahead Market Update Special NATF Meeting July 19, 2010.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Nodal Credit DAM Non-Business Day Treatment of Available Credit Limit (ACL)
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager NATF 31 August 2010.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
1 Nodal Credit Update at WMS June 16, 2010.
1 Nodal Stabilization Market Call December 03, :30 PM.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Market Trials Update NATF March 2,
Nodal Program Update to Cops
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Congestion Management and Ramp Rate for Delivering Ancillary Services
Vendor Definition of DAM Commitment
Presentation transcript:

March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR

Outline of Discussion from WMS regarding DAM OD 2/6/13 Two action items from WMS in Feb 1.What was the amount of load resource proration 2.Details and requirements of DAM Optimization Other observations -A/S linked offer summary -A/S trends since Feb 6 -MIP trend since NPRR322 implemented Feb 12 Appendix -Basic example of DAM Optimization in A/S shortage -Reminder of A/S trades and self-arrangement positions 2 March 13, 2013

Q1- WMS Load Proration Question for HE1 OD 2/6/13 -Question from WMS of how many Load Resources and MW were prorated in DAM for HE01 on Feb 6 -Answer is that no Loads were prorated for HE01 -Some loads not fully awarded due to COP for Resources (HSL below Offer amount so only awarded up to HSL) 3 March 13, 2013

Q2- DAM Design DAM design and objective function in protocols Protocols 4.5.1(4) The DAM uses a multi-hour mixed integer programming algorithm to maximize bid-based revenues minus the offer-based costs over the Operating Day, subject to security and other constraints, and ERCOT Ancillary Service procurement requirements. (a)The bid-based revenues include revenues from DAM Energy Bids and Point-to-Point (PTP) Obligation bids. (b)The offer-based costs include costs from the Startup Offer, Minimum Energy Offer, and Energy Offer Curve of any Resource that submitted a Three-Part Supply Offer, DAM Energy-Only Offers and Ancillary Service Offers. 4

Q2- DAM Design Documentation DAM Requirements document from Go-Live posted at –From Appendix 1, DAM clearing mathematical function (see next slide for market clearing objective function) - Energy and A/S Prices both driven by shadow prices for next MW 5 March 13, 2013

Q2- DAM Design 6 March 13, 2013

Q2- DAM Design DAM clearing process and analysis DAM engine – Unit commitment creates potential commitment patterns/solutions, then sends to network security analysis. Based on the results, adjusts commitment pattern –Continues to iterate until all violations are resolved and the solution meets all parameters, including the MIP threshold As previously noted, the MIP gap/threshold represents the area wherein multiple possible solutions that meet the constraint set become equivalent and indistinguishable to the DAM engine Once an acceptable solution is found and DAM converges, the final prices are calculated in a pricing run All awards and prices sent to Price Validation Tool analysis and investigated and validated in parallel by DAM Operator See appendix for basic market clearing and pricing example 7

Other Observations: A/S Linked Offer Summary Majority of online AS offers from generators (~75%) were not linked with Non-Spin on Feb 6 –Example is 50 MW capacity offering $10 RegUp and $8 RRS. Perhaps the QSE would also be willing to sell Non-Spin at $8 from the same capacity, but that is not reflected in the offer No A/S substitution –More linked offers from online resources may have helped the non-spin scarcity in Hour 1 8 March 13, 2013

Other Observations A/S Offer trends since Feb 6 9 OffNon-Spin TREND

March 13, 2013 Other observations: MIP threshold since NPRR322 MIP threshold is necessary because DAM is not a straight marginal dispatch problem –DAM solution is a combination of binary and continuous variables –Binary variable decisions (turning on a generation resource, awarding a fixed quantity block bid, etc.) are subject to an imperfect solutions within the MIP gap Purpose of the DAM Make-Whole payment in the case of valid Three-Part Offers –Looks at total profit for the OD, however; doesn’t help if DAM extends the commitment by an hour when turning off sooner was more optimal, for instance –Continuous variable decisions (such as awarding an energy bid curve) are not subject to it and will always be consistent with the clearing prices –Binary variables for recent DAMs: approx 240 TPOs plus 50 fixed quantity bid/offers times the hours contained therein 10

March 13, 2013 Other Observations: MIP threshold How MIP gap is calculated: –As each iteration completes, the engine runs a mini auction where all the binary variables become continuous (e.g., that a resource with a 200 MW LSL can be awarded just 0.1 MW) –This removes the lumpiness from the solution and provides a baseline to compare to the real solution So the “optimal” solution that is used for comparison is one that is not feasible nor attainable, but it gives an indication of the current solution quality. 11

March 13, 2013 Other Observations: MIP Threshold Refinement since NPRR322 on Feb MIP TREND

APPENDIX 13 March 13, 2013

Example with Linked AS Capacity Simplified example to illustrate price effect from linking AS capacity in AS Offers: 14 Energy BidEnergy Offers 400 MW$1,000G MW$10 G MW$20 G MW$30 G MW$40 AS requirements RegUp20 RRS70 NSRS50 AS OffersRegUpRRSNSRS G1135 MW$20 $10 $1 G310 MW- - $3,000 RegUp MCPC=+$20 -$1 +$3,000=$3,019 RRS MCPC=+10 -$1 +$3,000=$3,009 NSRS MCPC=$3,000= Energy LMP=$30 AwardsEnergy MWRegUp MWRRS MWNSRS MW G G G G40000

Reminder of Mechanics of AS Trades 15 March 13, 2013 = QSE AS Obligation - Self-Arranged AS submitted AS amount ERCOT buys in DAM for QSE QSE AS Responsibility Self-Arranged AS + AS sold in Trades - Total DAM AS Offer awards + Total SASM AS Offer awards AS bought in Trades =