AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.
PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Lyndon B. Johnson Space Center ISS Payload Label Approval Process Habitability & Human Factors (SF3 ) Rich Ellenberger ( )5/19/2015 ISS Payload.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Project Cost Management Estimation Budget Cost Control
Dr. L. K. Gaafar The American University in Cairo
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Course Technology Chapter 3: Project Integration Management.
Information Technology Project Management
Release & Deployment ITIL Version 3
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Copyright Course Technology 1999
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Software Requirements Engineering: What, Why, Who, When, and How
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Configuration Control
Space Shuttle Program Transition Structure SSP/ Lee Norbraten February 15, 2006 TCB.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
SPACE SHUTTLE PROGRAM Space Shuttle Business Office NASA Johnson Space Center, Houston, Texas Presenter Date Page 1 Space Shuttle Program Flight and Ground.
Payload Safety Review Plan and Issues Leland D. Hill.
Project Management Process
Chapter 12 The Network Development Life Cycle
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
Introduction to Payload Planning Will Kirby (256)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
Directorate of Manned Spaceflight and Microgravity Paolo Ariaudo (ESA MSM-EPO) MSFC/ESA TIM#2, February 22-24, 2004 MSFC/ESA TIM#2 February 24-27,
POIC Safety Payload Operations & Integration Center Mitchell Moore Marshall Space Flight Center ARES Corporation POIC Safety 1.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Integration Template ISS-SRB-RSP-017 Date: January 28, 2014 Presenter’s.
National Aeronautics and Space Administration (NASA) Glenn Research Center SAMS KU Forward Lessons Learned 1 Kevin McPherson NASA GRC Payload Operation.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Project Management PTM721S
I&T&C Organization Chart
CINEMA System Engineering
Systems Engineering Management
LAUNCH VEHICLES.
Instrument PDR Summary of Objectives
Integration & Test Instrument Operations Coordination
Presentation transcript:

AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3 7/15/04 JJ Conwell/MO Robert Miley/OZ

Page No. 2 OZ2/Robert Miley/ Payload Documentation Overview Documentation Requirements: ISS Program & Space Shuttle Program (SSP) Requirements  Requirements ensure safety, interfaces, and operations compatibility  NSTS B ISS Addendum “Safety Policy & Requirements for Payloads Using ISS”  NSTS/ISS “Payload Safety Review & Data Submittal Requirements”  NSTS/ISS “Interpretations of NSTS/ISS Payload Safety Requirements”  SSP “Attached Payload Interface Requirements Document”  SSP “Standard Payload Integration Agreement for Attached Payloads” Joint Agreements required in the following disciplines  Safety requirements  Physical Interface requirements  Electrical/Thermal Interface requirements  Command & Data downlink requirements  Operational requirements  Crew Training requirements  Transportation to/from orbit requirements

Page No. 3 OZ2/Robert Miley/ ISS Program Documents Payload Integration Agreement (PIA): Documents joint agreements to manage and execute roles and responsibilities for ISS payload integration Schedule - SSP AMS-02 PIA  11/21/03 - ISS Program Manager did not disqualify any AMS-02 ISS requirements or Shuttle requirements – requested coordination with SSP  6/11/04 - Evaluation request to Space Shuttle for SSCN 6999  6/24/04 - Shuttle agreed to early MIP baseline development  6/25/04 - OZ agreed to early MIP baseline proposal with SSP  7/8/04 - OC agreed to early assignment of a Launch Package Manager  ISS AMS-02 requirements communicated to Shuttle via MIP  Implements the existing formal ISS/Shuttle process  10/6/04 - PCB for SSCN 6999 PIA approval ISS Interface Control Document (ICD): Defines payload hardware and software interfaces with ISS. Details ISS/payload interface verification requirements.  2/1/05 – PECP & 2/9/05 PCB for SSP AMS-02 Hardware ICD approval

Page No. 4 OZ2/Robert Miley/ Mission Integration Plan (MIP): Documents joint agreements between the ISS Program and SSP to define and execute the launch package integration requirements Only formal mechanism for Shuttle to review and approve requirements that the ISS Program is levying on Shuttle Schedule -  6/24/04 - Shuttle agreed to early MIP baseline development  Mission unique MIP encompasses all requirements and constraints pertinent to the Launch Package and/or Return Complement on this flight  Implements the existing formal Shuttle process to work payload requirements and the Orbiter-to-AMS-02 ICD  Nominal MIP template: ISS submittal L-21.5 months; Shuttle baseline L-16 months  8/10/04 - AMS-02 MIP kickoff meeting  2/22/05 - SSP Flight Operations Integration Control Board for MIP approval Shuttle Interface Control Document (ICD): Defines payload hardware and software interfaces with Orbiter  5/17/05 – SSP approval of AMS-02 Hardware and Software ICD Shuttle Program Documents