AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3 7/15/04 JJ Conwell/MO Robert Miley/OZ
Page No. 2 OZ2/Robert Miley/ Payload Documentation Overview Documentation Requirements: ISS Program & Space Shuttle Program (SSP) Requirements Requirements ensure safety, interfaces, and operations compatibility NSTS B ISS Addendum “Safety Policy & Requirements for Payloads Using ISS” NSTS/ISS “Payload Safety Review & Data Submittal Requirements” NSTS/ISS “Interpretations of NSTS/ISS Payload Safety Requirements” SSP “Attached Payload Interface Requirements Document” SSP “Standard Payload Integration Agreement for Attached Payloads” Joint Agreements required in the following disciplines Safety requirements Physical Interface requirements Electrical/Thermal Interface requirements Command & Data downlink requirements Operational requirements Crew Training requirements Transportation to/from orbit requirements
Page No. 3 OZ2/Robert Miley/ ISS Program Documents Payload Integration Agreement (PIA): Documents joint agreements to manage and execute roles and responsibilities for ISS payload integration Schedule - SSP AMS-02 PIA 11/21/03 - ISS Program Manager did not disqualify any AMS-02 ISS requirements or Shuttle requirements – requested coordination with SSP 6/11/04 - Evaluation request to Space Shuttle for SSCN 6999 6/24/04 - Shuttle agreed to early MIP baseline development 6/25/04 - OZ agreed to early MIP baseline proposal with SSP 7/8/04 - OC agreed to early assignment of a Launch Package Manager ISS AMS-02 requirements communicated to Shuttle via MIP Implements the existing formal ISS/Shuttle process 10/6/04 - PCB for SSCN 6999 PIA approval ISS Interface Control Document (ICD): Defines payload hardware and software interfaces with ISS. Details ISS/payload interface verification requirements. 2/1/05 – PECP & 2/9/05 PCB for SSP AMS-02 Hardware ICD approval
Page No. 4 OZ2/Robert Miley/ Mission Integration Plan (MIP): Documents joint agreements between the ISS Program and SSP to define and execute the launch package integration requirements Only formal mechanism for Shuttle to review and approve requirements that the ISS Program is levying on Shuttle Schedule - 6/24/04 - Shuttle agreed to early MIP baseline development Mission unique MIP encompasses all requirements and constraints pertinent to the Launch Package and/or Return Complement on this flight Implements the existing formal Shuttle process to work payload requirements and the Orbiter-to-AMS-02 ICD Nominal MIP template: ISS submittal L-21.5 months; Shuttle baseline L-16 months 8/10/04 - AMS-02 MIP kickoff meeting 2/22/05 - SSP Flight Operations Integration Control Board for MIP approval Shuttle Interface Control Document (ICD): Defines payload hardware and software interfaces with Orbiter 5/17/05 – SSP approval of AMS-02 Hardware and Software ICD Shuttle Program Documents