Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
The Detector and Interaction Region for a Photon Collider at TESLA
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Lecture 5 Damping Ring Basics Susanna Guiducci (INFN-LNF) May 21, 2006 ILC Accelerator school.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Large Booster and Collider Ring
The MDI at CEPC Dou Wang, Hongbo Zhu, Huamin Qu, Jianli Wang, Manqi Ruan, Qinglei Xiu, Sha Bai, Shujin Li, Weichao Yao, Yanli Jin, Yin Xu, Yiwei Wang,
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Q1 IR Septum Quadrupole for LHeC
Final Focus Synchrotron Radiation
Yingshun Zhu Accelerator Center, Magnet Group
Superconductivity in the BEPCII Performance
The PEP-II Interaction e+e- Factories Workshop
Challenges for FCC-ee MDI mechanical design
The design of interaction region
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
Interaction Region Design Options e+e- Factories Workshop
Design of Interaction Region
BEPCII Background Issues: Collimators and Masks
IR Lattice with Detector Solenoid
IR Beam Transport Status
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
IR/MDI requirements for the EIC
Upgrade on Compensation of Detector Solenoid effects
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007

Layout of BEPCII storage ring Machine Detector Interface Beam Line layout Special magnets Coupling compensation scheme Vacuum chamber in the central IR Supporting system Integration procedure Alignment of two SC magnets Measurement of ground motion in IR

Layout of BEPCII storage ring BESIII detector is located in south of storage ring.

Related parameters for the IR design Circumference C m Emittance  x /  y 144/2.2 nm  rad β function at IP  x / β y 1.0/0.015 m Beam size at IP  x * /  y * 380/5.7  m Crossing angle at IP  c 11  2 mrad Bunch length  z 1.5 cm Bunch number n b 93 Bunch spacing s b 2.4m Bunch current I b 9.8 mA Luminosity L 1.0  cm -2 s -1

Interface between machine and detector The BESIII detector consists of a cylindrical drift chamber surrounded by an electromagnetic calorimeter, immersed in 1.0 T, 3.6 m long superconducting solenoid. Side view of the BESIII detector and SC final focusing magnet The geometry of the drift chamber has a direct bearing on the IR design and it requires the accelerator components inside the detector must fit within a conical space with an opening angle of 21.5 ˚. With restricted outer diameter, the SC final focusing magnet accelerator component can only approach to m on each side of the IP.

Beam Line layout in the IR Beam separation scheme A horizontal crossing angle of 11 mrad  2 at the IP A reasonable value from the consideration of IR length(-14m~14m), the effects on parasitic beam-beam interaction and piwinski angle. Off-Center SC quadrupole. Shared by two beams, deflect the beams further to 26 mrad  2. Septum bending magnet ISPB. Only deflect the beams in the inner ring to 65.5 mrad.

Beam Line layout in the IR A doublet of quadrupoles for final beam focusing Doublet of quadruples SCQ, Q1 provides the final focusing. The vertical focusing quadrupole SCQ is a superconducting magnet shared by both beams. The horizontal focusing quadrupoles Q1a and Q1b are designed as a compact two-in-one structure which the two beam apertures are in a common yoke.

Special magnets in the IR --- SC magnet Coil winding layout of superconducting magnet Design and production of the SC magnet is challenge due to very tight space limitation, high field gradient requirements, coupling compensation requirements, and commisioning requirements. AS1~3: Anti-Solenoid, SCQ: Quadrupole, SCB: Dipole magnet SKQ: Skew quadrupole, VDC: Vertical steering magnet

Special magnets in the IR --- ISPB With this magnet, the outgoing beams are deflected about 39 mrad. This provides a separation between the two beams at 3.55 m from the IP, which is possible to place a special quadrupole. ISPB is located at 2.3m from the IP, inside the detector gate, immersed in the fringe of the detector solenoid field. A field clamp plate at the inboard end of the magnet is used to shield off the detector field. The septum bending magnet ISPB has a narrow septum coil of 16.4mm (beam separation is 26mm) and only acts on the outgoing beam line.

Special magnets in the IR --- Q1a Q1b The final horizontal focusing quadrupoles Q1 is located at 3.55m from IP where beam separation is only 9cm. We have to divide it into two magnets Q1a and Q1b to make device realizable. For the consideration of saving space, they are designed as a compact two-in-one structure which the two beam apertures are in a common yoke. Q1a Q1b

Coupling compensation scheme in the IR Detector solenoid (1.0 T & ±1.8m ) is the dominant coupling source in the storage ring. The lattice functions, the vertical emmittance and the tilt angle of beam at the IP, which can reduce the luminosity obviously, are strongly related to coupling. Three anti-solenoids (AS1~3) and a skew quadrupole in SC magnet are used to compensate the detector field locally. This compensation would work perfectly for particles with any momentum. Each ring has 4 skew quadrupoles for the global coupling adjustment.

Vacuum chamber in the central IR Mechanical design The central part is Be pipe with the length of 0.3m and inner diameter of 63mm. The Be pipe is welded to a copper cylinder with the length of 0.35m and inner diameter of 63mm. Except Be pipe, the material of vacuum chamber within  3.5m is chosen as copper for its low coefficient of photon-induced gas adsorptions, high thermal conductivity and large photon absorption coefficient.

Vacuum chamber in the central IR Background --- Synchrotron radiation photons SR fans of Colliding Mode Ec<0.7keV 0.5W of SR power contributed by both e+ & e- beams will hit directly on the beryllium pipe. Ec<0.7keV For IR design, it’s very difficult to stop both direct and once-scattered photons emitted within 10  x of beam size at all magnets hitting on the detector beryllium pipe. In order to absorb as much as possible SR photons which penetrates the IP chamber into the detector, about 10  m gold layer was sputtered inside the inner beryllium cylinder. the simulation shows that photon background is low enough.

Vacuum chamber in the central IR Background --- Lost Particles Masks in the vacuum chamber along storage ring are designed to prevent lost particles from hitting the IR. Simulation indicates these masks work effectively. A tube type masks made of 2.5cm uranium are designed between the SC magnet of IR and the inner wall of the MDC to protect the detectors from the backgrounds. Higher IR vacuum is important to reduce lost particle backgrounds. Beam-Gas InteractionsTouschek effects Trajectories for lost particles (with masks) bremsstrahlungCoulomb scattering

Vacuum chamber in the central IR Temperature control SR power and HOM are unavoidable and cause heat problem. damage devices, bring unstable to electronic components. Be pipe, designed by detector people. Heat source: SR power, HOM, heat spread from other pipe. The temperature vibration of Be pipe should be controlled within 2 degree according to requirement of the detector. The Be pipe is designed as double-wall structure with 1.4 mm gap for cooling water channel. Other vacuum chamber in the IR, designed by accelerator people. Heat source: SR power, HOM. Water cooling structure are designed in the beam pipe 0.5~0.7m from the IP, the crotch beam pipe, the beam pipe 3.0~4.0m from the IP and all the bellows to avoid the heat problem in these region.

Vacuum chamber in the central IR Crotch chamber ---Most complicated part The crotch chamber is about 0.3 m long in which a bellows, one NEG pump, water cooling system and two BPMs are installed. SR=220W, HOM=1000W Water cooling system can control the body temperature rise within 50 o C. The temperature rise near the BPM is about 10 o C.

IR supporting system The SC cryostat, transfer line, valve box, ISPB, Q1a, Q1b are supported by a movable stage. The cantilever girder is connected with a movable stage which can move along the beam line by approximately 3 m. With this motion the SC magnets can be pulled out and pushed into the detector.

Integration procedure of IR Installing the central IP chamber and fixed it. Connecting the flanges between the IP chamber and SCQ chamber. Pushing the SC magnet into its final position. Connecting the flanges between the SCQ chamber and crotch section. Installing ISPB, Q1a, Q1b…… Cable, Cooling pipe, etc. should be paid more attention.

Alignment of two SC magnets The alignment position and angle of the SC magnet can be adjusted by a mechanism installed on the movable stage. Four hair cross targets on the surface of each cryostat are used to align the left and right SC magnets. On each endplate of the main drift chamber of detector, two quartz windows will be installed. They allow the surveyors to look through the left and the right pair of targets.

Measurement of ground motion in IR The noise level of BEPC is so low that the vertical vibration amplitude is 10nm at the frequency range above 1Hz. The inherence frequencies of supporting system of interaction region have avoided meeting all the noise frequencies which have been found till now. The vibrations of magnetic elements due to the ground motion would cause the distortion of the beam orbits and effect on the the beam performance (  y =5  m at the IP). The measurements of ground motion in IR was carried out.

Summary The Key IR issues for the BEPCII are the optics configuration, special magnets, vacuum chambers and integration of all components. Technique design, prototype, mass production and testing of IR are going smoothly. Some of them may become critical path of the present schedule, such as vacuum chamber, superconducting magnets. Vacuum chamber will be finished in Apr. The test of superconducting magnets will begin in Jul. Integration and commissioning of BEPCII IR are planed at the end of this year. Thanks !