Shell Island West NRDA Restoration

Slides:



Advertisements
Similar presentations
Time Series for Central West Grand Terre Island of the Lafourche Shoreline Aerial Video Survey Program Pontchartrain Institute of Environmental.
Advertisements

Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Gordon G. Thomson, P.E., D.CE. Director, Coastal Planning & Engineering, Inc. – A Shaw Group Company Monitoring and Performance Evaluation of Emergency.
Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Industry Day May 6, Acres Semi-confined placement Pipe will be moved frequently No dewatering structures Marsh will be at different elevations.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.
Coastal Protection and Restoration Authority January 18, 2012 Deepwater Horizon Early Restoration Phase I.
Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
Civil Works Baltimore District River and Harbor Projects.
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
Restoring and protecting Louisiana’s coast Barrier Plan June 16, 2010 Kyle Graham Deputy Director of Planning and Programs Office of the Governor – Coastal.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Southeast Louisiana Flood Protection Authority – East (SLFPA-E) and Pontchartrain Levee District Recommendations for Early Emergency Restoration Projects.
San Dieguito Wetland Restoration Update on Progress by SCE June 3, 2004.
Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Governor's Advisory Commission on Coastal Protection, Restoration, and Conservation June 6, 2012 Deepwater Horizon.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
CAMINADA HEADLAND BEACH / DUNE RESTORATION Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Meeting October 5, 2011.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
U.S. Department of the Interior Minerals Management Service Capital Hill Oceans Week Renee Orr Chief, Leasing Division Minerals Management Service Herndon,
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® The RESTORE ACT and other Economic Opportunities 4 September 2013 Alabama Section American.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August
Tracking No Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Oil Spill Restoration Planning – Part 1 (RESTORE Act, NRDA, SEPs) Kyle Graham Deputy Executive Director CPRA 8/22/2012 committed to our coast.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
1 Dark Background Body Slide This background is best for on-screen presentations only—the background shows up best on-screen but uses excessive toner if.
CPRA Financing Corporation December 18, 2012 Deepwater Horizon Oil Spill.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
April 20, 2011 Shoreline Protection Emergency Restoration Plan.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Coastal Protection and Restoration Authority January 22, 2012 Deepwater Horizon.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
Oyster Advisory Commission October 3, 2012 Deepwater Horizon.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
Where’s My Material? Appropriate Planning for Cap and Habitat Restoration Material Quantities Presented by Paul LaRosa, P.E., John Verduin, P.E., and Ram.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
Spill Related Planning Efforts September 15, 2010 Kyle Graham Governor’s Office Coastal Activities.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
DEEPWATER HORIZON $1B EARLY RESTORATION AGREEMENT Governor’s Advisory Commission May 11, 2010.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Brazoria County RESTORE Act Projects
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
Caminada Headland Beach and Dune Restoration (BA-45) Brad Miller Louisiana Coastal Protection and Restoration Authority committed to our coast.
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
LAKE HERMITAGE MARSH CREATION BA-42 FINAL (95%) DESIGN REVIEW MEETING NOVEMBER 3, 2008.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
CPRA Program Update ACEC Project Outlook November 17th, 2016
CPRA Program Update ACEC Project Outlook 2017 November 16, 2017
Walker Street Reconstruction Project 25% Design Public Hearing
2015 January February March April May June July August September
Committed to our coast Preliminary Assessment of Restoration Impacts in the Isles Dernieres, Terrebonne Parish, LA CPRA Board Meeting Baton Rouge,
FUNDS PROVIDED TO TEXAS
Presentation transcript:

Shell Island West NRDA Restoration Catherine Ricks, P.E. Engineering May 6, 2014 committed to our coast committed to our coast

Coastal Protection and Restoration Authority of Louisiana Presentation Outline Project Background Project Overview Map Project Features East Lobe West Lobe Borrow Areas Mississippi River – Dune/Beach & Sand Flat Offshore – Marsh Fill Project Schedule Overview Summary Coastal Protection and Restoration Authority of Louisiana

Coastal Protection and Restoration Authority of Louisiana Project Background Shell Island West NRDA Restoration Project (BA-111) LCA Barataria Basin Barrier Shoreline (BBBS) Restoration Project Emergency Berm Project constructed in 2010 in response to the Deepwater Horizon Oil Spill, constructed a portion of the Shell Island East Lobe (W8). Shell Island East Berm Barrier Island Restoration Project (Shell East Berm), constructed in 2013 with Berm Enhancement Funds. Shell Island West NRDA Restoration Project (Shell West NRDA) is the construction of the remainder of the East Lobe and the entire West Lobe. Shell Island started the design process as part of the BBBS Restoration project under LCA The dune portion of the eastern extent of the island was constructed under the 2010 Emergency berm construction as a response to the 2010 oil spill Berm Enhancement funds used to complete the construction of the Shell Island East Barrier Island Restoration Project, approximately eastern 1/2 of Shell Island east lobe Shell West NRDA completes the construction of the western portion of the east lobe, and constructs the west lobe Design of Shell Island West NRDA is complete and waiting funding Shell West NRDA is awaiting funding. Coastal Protection and Restoration Authority of Louisiana

BA-111 Shell West NRDA Overview MR-E MR-A MR-B 35-E Shell Island Shell Island West Lobe Shell Island East Lobe Project extents Located in Plaquemines Parish between Gulf of Mexico and Bastian Bay to the west of Empire WW Coastal Protection and Restoration Authority of Louisiana

Coastal Protection and Restoration Authority of Louisiana Shell Island East Berm Project August 15, 2013 was the last day of dune fill placement. May 4, 2013 September 9, 2013 April 1, 2014 May 2013 aerial showing the construction of the containment dike prior to any dune or marsh fill Last day of fill operations was August 15, 2013 September 2013 aerial after all material placed April 2014 aerial shows the migration of the island to the west and into the design template for the Shell Island West NRDA project. Surveys will be taken at some time prior to the bid process so a redesign can be completed with updated volumes. Coastal Protection and Restoration Authority of Louisiana

Shell West NRDA East Lobe Shell East Berm Project Project Features – East Lobe (as of May 2013) Shell West NRDA East Lobe features include: Marsh fill platform at approximately 3,000 linear feet +2.5’ NAVD88 Containment dike 486,200 cy 60 acres Marsh sand flat at approximately 5,000 linear feet +2.5’ NAVD88 Turbidity Control Structure on the landward/bay side (no containment) 93 acres Beach/Dune at approximately 7,800 linear feet +8.0’ NAVD88 Uniform dune width of 340’ 2,839,000 cy (includes marsh sand flat) 176 acres Marsh Fill (with containment) Access Channel Marsh Sand Flat The volumes shown here are the volumes prior to the construction of the Shell Island East Berm project. At this time the marsh fill platform is offshore material due to volumes available in the river, Will look into river sand for the marsh fill area during an update to the E&D Shell West NRDA East Lobe Plan View Dune/Beach Shell East Berm Project Coastal Protection and Restoration Authority of Louisiana

19,405 acres Marsh Fill Containment Dike Primary Borrow Source Containment Dike Secondary Borrow Source Primary Dike 8 1 Dune/Beach 60 1 Break in Slope at +1.0 30 Marsh Sand Flat 30 1 19,405 acres of coastal habitats benefited One time slope adjustment Slope and dune width may be revised while updating the survey information to account for the change in slope during the Shell East Berm project Shell West NRDA East Lobe Typical Cross-sections Coastal Protection and Restoration Authority of Louisiana

Shell West NRDA West Lobe Project Features – West Lobe Shell West NRDA West Lobe features include: Marsh fill platform approximately 5,600 linear feet +2.5’ NAVD88 Containment dike 878,000 cy 134 acres Beach/Dune constructed approximately 7,000 linear feet +8.0’ NAVD88 Uniform width of 380’ 2,234,000 cy 196 acres Containment Dike Marsh Fill Access Channel Dune/Beach Shell West NRDA West Lobe Plan View Coastal Protection and Restoration Authority of Louisiana

Containment Dike Borrow Source Marsh Fill Primary Dike 30 8 1 Break in Slope at +1.0 1 60 1 Containment Dike Borrow Source Dune/Beach Marsh Fill Primary Dike 30 8 1 1 Break in Slope at +1.0 60 1 Containment Dike Borrow Source Shell West NRDA West Lobe Typical Cross-sections Coastal Protection and Restoration Authority of Louisiana

Dune/Beach and Sand Flat Borrow Areas Project Features – Mississippi River Borrow Areas MR-A 5.3 MCY (Volume are based on pre-Shell East surveys) Cut depths to -75’ NAVD88 and -80’ NAVD88 Shell West NRDA Dune/Beach and Sand Flat Borrow Areas Coastal Protection and Restoration Authority of Louisiana

Dune/Beach and Sand Flat Borrow Areas Project Features – Mississippi River Borrow Areas MR-B 3.96 MCY (Volume are based on pre-Scofield surveys) Cut depths to -80’ NAVD88 Shell West NRDA Dune/Beach and Sand Flat Borrow Areas Coastal Protection and Restoration Authority of Louisiana

Dune/Beach and Sand Flat Borrow Areas Project Features – Mississippi River Borrow Areas MR-E 3.5 MCY (Volume are based on Post-Construction Shell East surveys) Cut depths to -80’ NAVD88 Need to update to post-con Scofield or Shell East Shell West NRDA Dune/Beach and Sand Flat Borrow Areas Coastal Protection and Restoration Authority of Louisiana

Offshore Marsh Fill Borrow Area Project Features – Offshore Borrow Area 35-E 15 MCY (Volume are based on pre-Shell East surveys) Cut depths to -51.0’ NAVD88 and -54.0’ NAVD88 Shell West NRDA Offshore Marsh Fill Borrow Area Coastal Protection and Restoration Authority of Louisiana

Coastal Protection and Restoration Authority of Louisiana Project Schedule Tasks Completed: Bathymetric and Topographic Surveys – February 2011 and January 2012 Geophysical Investigation and Final Report (Borrow Areas)– May 2012 Geotechnical Investigation and Final Report (Fill Area) – August 2012 Coastal Use Permit – August 2012, Modification – June 2013 COE 404 Permit – October 2012, Modification – Not Required LDWF Fill Material Permit – February 2013 Engineering and Design Future Tasks: Update Bathymetric and Topographic Survey Update E&D Bid Process – Availability of Funding Coastal Protection and Restoration Authority of Louisiana

Coastal Protection and Restoration Authority of Louisiana Project Summary Dune/Beach Fill Volume: 5,073,000 cy Marsh Fill Volume: 1,123,000 cy Area of Fill: 342 acres Primary Dike: 10,790 linear feet Sand Fencing: 14,400 linear feet Settlement Plates: 17 plates Coastal Protection and Restoration Authority of Louisiana

Coastal Protection and Restoration Authority of Louisiana QUESTIONS Coastal Protection and Restoration Authority of Louisiana