- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Metropolitan Council – Project Update May 14,

Slides:



Advertisements
Similar presentations
Planning and Development Committee West Corridor Update May 10, 2007.
Advertisements

Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
University of Minnesota Dual Track Planning Efforts Northern Alignment and Washington Ave At-Grade Alignment Briefing for Central Corridor Management Committee.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Phase 1 Project Status: Design Continued development of alternative station design concepts for stations in the vicinity of USC and Expo Park Received.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
U.S. 33 Northern Connector Alternative
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Metropolitan Council May 28, 2008.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Public Safety on the Twin Cities Campus and Central Corridor Light Rail Transit (Green Line) Alumni Relations Officers Mtg May 8, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
1 SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY Municipal Meetings September 2006.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Metropolitan Counci February 13, 2008.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole February 20, 2008.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Safety Is Everyone’s Responsibility May Today’s Agenda Central Corridor Light Rail Overview Safety Outreach Program –Do’s and Don’ts –Safety video.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Arizona Forward Update
Capital Programming Committee South Coast Rail Phase 1 Service
Southwest LRT METRO Green Line Extension
I-85 Corridor Light Rail Transit Feasibility Study
Central Corridor - Light Rail Transit Metropolitan Council
Presentation transcript:

- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Metropolitan Council – Project Update May 14, 2008

2 Today’s Agenda Washington Ave. at-grade alignment –Bus scenario operational costs –Traffic Study #4 update –Electromagnetic Interference –Mitigation for transit/pedestrian mall Northern Alignment –Alignment –Outstanding issues Light Rail Transit Central Corridor

3 Bus Scenario Operational Costs Light Rail Transit Central Corridor

4 Transit/Pedestrian Mall Scenarios Ridership, Cost and CEI Review Scenario B Transit/Pedestrian Mall Scenarios 12A2B3 Buses terminate at edges of campus * Bus service via 10 th Ave.* Bus service via Pleasant* Buses remain on transit/ped mall Capital Costs$909.1 MM Cost Effectiveness Index $23.80$24.09$24.56$24.57$23.92 Ridership Estimate41,97045,32044,78045,04042,960 Intermodal Station Construction Costs NA$15 MM NA Adjusted Capital Costs $909.1 MM$924.1 MM $909.1 MM * A concern of Scenarios 1, 2A and 2B is the diversion of riders from the UofM Campus Connector to LRT which may lead to exceeding available train capacity.

5 Transit/Pedestrian Mall Scenarios Corridor Bus Operation Cost Estimates Scenario B Transit/Pedestrian Mall Scenarios 12A2B3 Buses terminate at edges of campus* Bus service via 10 th Ave.* Bus service via Pleasant* Buses remain on transit/ped mall Operational Costs ($) 38,183,60036,765,65037,719,58037,794,10038,183,600 Difference ($)--(1,417,950)(464,020)(389,500)-0- % Change-3.7%-1.2%-1.0%0.0% CEI$23.80$24.09$24.56$24.57$23.92 Assumptions: Annual O&M Costs for bus route modifications consistent with comparable Rail Build Alternatives costs escalated to 2007 dollars using 3.5% Fleet buses assume a 20% spare ratio Metro Bus O&M costs represent corridor impacted routes only. * A concern of Scenarios 1, 2A and 2B is the diversion of riders from the UofM Campus Connector to LRT which may lead to exceeding available train capacity.

6 Traffic Study #4 Update Light Rail Transit Central Corridor

7 Traffic Study 4 Intra-campus Roadway Network Mitigation Strategies Light Rail Transit Central Corridor Proposed new roadway connections Converted to 2-way streets Intersection traffic control and/or capacity improvements Stripe NB left turn lane Modify signal phasing Install traffic signal Construct turn lanes Install traffic signals Construct turn lanes Install traffic signal Construct turn lanes Install all way stop Construct turn lanes Mill and overlay E. River Rd Construct new segment and overlay existing

8 Traffic Study 4.1 VISSIM Traffic Model VISSIM traffic analysis considers –Pedestrian –Vehicle –Bus Level of Service –Washington Avenue intersections –Harvard and Delaware intersection Light Rail Transit Central Corridor

9 Light Rail Transit Central Corridor Washington Study to determine impacts to Washington Ave. with LRT transit/pedestrian mall Traffic Study 4.1 Pleasant to Harvard Oak ChurchUnion Harvard Walnut Pleasant Delaware A BBC C D A Level of Service Indicator

10 Light Rail Transit Central Corridor Washington Study to determine impacts to Washington Ave. with LRT transit/pedestrian mall Traffic Study 4.1 Pleasant to Walnut Oak ChurchUnion Harvard Walnut Pleasant Delaware A BBC C D A Level of Service Indicator

11 Geomagnetic and Electromagnetic Interference Light Rail Transit Central Corridor

12 Locations of Sensitive Equipment Light Rail Transit Central Corridor

13 Geomagnetic Perturbation (Steel Mass) Light Rail Transit Central Corridor Maximum allowed at 77’ = 2.0 mG mG = millegauss (units of magnetic force)

14 Electromagnetic Measurements Light Rail Transit Central Corridor

15 Electromagnetic Measurements Light Rail Transit Central Corridor Maximum allowed at 77’ = 2.0 mG

16 Electromagnetic Technical Solutions Light Rail Transit Central Corridor

17 Washington Ave. Transit/Ped Mall Mitigation Light Rail Transit Central Corridor

18 Stakeholder-Identified Improvement Needs Central Corridor Mitigation Participation* Washington Avenue Transit Mall$11,100,000 Free Fare Zone Stadium Village to West Bank Stakeholder Granary Road - I35W to TH 280 Stakeholder U of M Fairview Hospital Loading Dock Stakeholder Traffic light improvements on Washington Ave., intersections Base Scope Intersections directly impacted by CCLRT (Study #3)$2,800,000 Intersections not directly impacted by CCLRT (Study #3) Stakeholder East River Road/Harvard Street/Fulton Street$1,200,000 East Bank Campus Area Street Connections (Study #4)$5,100,000 Modify Huron Blvd/University Ave./23 rd Ave./25 th Ave. Base Scope Environmental Issues$6,800,000 Impact on Freeway System Stakeholder Signage and Wayfinding Base Scope Cedar Riverside Small Area Plan Stakeholder Total Central Corridor Mitigation Participation $27,000,000 * CCLRT Participation subject to FTA approval

19 Northern Alignment Light Rail Transit Central Corridor

20 Comparison of Northern Alignment and Washington Avenue Alignment

21 Northern Alignment: West Bank

22 Typical Sections: West Bank

23 Northern Alignment: Dinkytown

24 Typical Sections: Dinkytown

25 Northern Alignment: Stadium Village

26 Northern Alignment Outstanding Issues Light Rail Transit Central Corridor

27 Environmental Issues #9 Bridge is eligible as a historical structure #9 Bridge demolition impacts to bike/pedestrian trail Removal of Section 8 housing financed by HUD, impacts to remaining units Soil contamination Light Rail Transit Central Corridor

28 #9 Bridge is eligible historic structure

29 Demolition impacts bike/ped trail

30 Path to Bridge #9 Impacts to Section 8 housing

31 Soil contamination from former gas works 19 th Avenue South Washington Avenue 1956

32 Soil contamination from former gas works Former Gas Works Site Former Gas Holding Location

33 Additional Environmental Permits Federal Transit Administration Corp. of Engineers National Park Service/ MNRRA FEMA Coast Guard HUD Light Rail Transit Central Corridor

34 Design Issues 25’ deep open trench required between 19 th Ave. and Law School for LRT to cross Washington Ave. at-grade US Coast Guard jurisdiction as a navigable waterway Light Rail Transit Central Corridor

35 Trench required between 19 th Ave. and Law School to run at- grade with Washington Ave.

36 Coast Guard looking for opportunities with bridge reconstruction to remove piers

37 Constructability Issues 19 th Avenue trench requires retaining walls –Impacts to Law School and 19 th Ave. structure –Construction impacts and method Structural integrity of Bridge #9 coffer dam Light Rail Transit Central Corridor

38 Structural and construction impacts to Law School and 19 th Ave. roadway and bridge 25’ deep 30’ wide Law School 19 th Ave.

39 Structural integrity of coffer dam unknown

40 Operations and Maintenance Issues Fire, life and safety access –Difficult in 19 th Ave. trench –Limited in Dinkytown trench Snow removal from 19 th Ave. trench Maintenance crew access limited due to restricted adjacent available right-of-way Light Rail Transit Central Corridor

41 Fire, life, safety, maintenance and construction access limited

42 Railroad Issues Requires right-of-way acquisition from BNSF Railway Does not meet track separation requirements between freight and light rail Results in $200 MM insurance, indemnification package due to proximity of passenger rail to freight rail Light Rail Transit Central Corridor

43 Requires negotiating with freight railroad company for right-of-way acquisition

44 14 th Avenue University Avenue Proximity to operating freight railroad does not meet minimum standards Freight rail Light rail Future Granary Road

45 Roy Wilkins Hall 1212 University Ave SE Proximity to operating freight railroad requires insurance, indemnification in case of an accident or derailment

Project Schedule Impacts CCLRT Master Schedule Northern Alignment Schedule Start SDEIS environmental reviewJuly 9, 2007 Define Project Alignment and ElementsFeb. 27, 2008May 21, 2008 Restart SDEIS environmental review for Northern AlignmentJune/July 2008 Complete environmental analysis, prepare SDEISApril 4, 2008Feb Provide final administrative draft SDEIS to FTAApril 29, 2008March 2009 Receive SDEIS comments from FTAMay 28, 2008May 2009 Publish SDEIS in Federal RegisterJune 27, 2008June 2009 Hold Public HearingJuly 21, 2008July 2009 Adopt Revised LPA by Met CouncilAug. 27, 2008Aug Submit New Starts ApplicationSept. 5, 2008Sept. 4, 2009 Publish draft FEISJan. 11, 2009Jan FTA issues Record of Decision on FEIS (min. of 30 days)Feb. 25, 2009Feb FTA approves project to move into Final DesignMay 6, 2009May 2010 May 9, 2008

47 Light Rail Transit Central Corridor More Information Check out our website: Contact Central Corridor Project Office: 540 Fairview Avenue North St. Paul, MN Comment Line: