AASHTO Sub-Committee on Design Meeting April 28, 2010.

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Overview of New Practices & Policy Deck Issues. Topics Stakeholder Responsibilities Stakeholder Responsibilities Deflection Control Measures Deflection.
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Duane Hill, District Engineer
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
MISSISSIPPI CONTRAFLOW OPERATIONS Providing the State of Louisiana Assistance during the Hurricane Emergency Evacuation of New Orleans Bob Chapman Emergency.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
I-65 Added Travel Lanes Project in Tippecanoe County
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
“Get in, do it right, get out, and stay out.”
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Posting Bridges for Specialized Single-Unit Trucks
Project Purpose and Objective
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
New Bridge Construction
The Oakton Condominium Association September 12, 2017
Highway 14 – Owatonna to Dodge Center District 6 Update
US26: Cornelius Pass Rd -185th Ave
Contract 60X10 Informational Meeting Weber I-55
Design Criteria CTC 440.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Harbour Island Force Main Replacement
Presentation transcript:

AASHTO Sub-Committee on Design Meeting April 28, 2010

The historic Ben Sawyer Bridge was built in 1945 to carry locals and visitors between the east cooper barrier islands of Sullivan’s Island and Isle of Palms with Mount Pleasant and the rest of the Charleston area. For years, it was the only vehicular access for both Sullivan’s Island and the neighboring Isle of Palms. The Isle of Palms Connector was completed in 1993 and provided additional access to both Sullivan’s Island and the Isle of Palms.

The Ben Sawyer Bridge drew significant national attention when Hurricane Hugo came ashore in the Charleston area in The storm essentially picked up and rotated the swing span, leaving it tilted at a 45-degree angle, which created one of the lasting images of the hurricane’s devastation. The swing span was lifted back into place on October 5, One lane of the bridge was re-opened to traffic on October 8, 1989.

Traffic Congestion  Traditional construction requires a 12-month, 11-mile detour through the Isle of Palms and Mt. Pleasant.  ABC requires a 10-day detour.  ABC avoids approximately 12 months of additional traffic congestion in both the Town of Mt. Pleasant and the Isle of Palms.  ABC reduces crash potential.  ABC reduces motor user costs.  ABC provides much greater access to both Sullivan’s Island and the Isle of Palms.

Quality of Work  ABC improves the quality of work by constructing the swing span in an off-site controlled atmosphere.  The use of ABC further improves the quality by having the majority of the swing span’s electrical and mechanical components installed off-site as well.  Preliminary functional testing can be completed off-site without interference of the motoring public. Marine Traffic  ABC has much less impact to the intra-coastal waterway and its’ users.

Project Duration – 540 days Liquidated Damages - $2,900/day over 540 Days DBE Goal – 5% 5-Year project warranty Warranty Bond ($5 Million) Professional Liability Insurance ($3 Million)

Duration – 10 days for Total Closure Closure Restrictions – Prohibited between April 1 st and October 1 st. Prohibited between December 15 th and January 3 rd. Incentive Pay - $2,500/hour up to 48 hours. Disincentive - $2,500/hour over 10 days with no cap. Swing Span fully operational

 Contractor – PCL Civil Constructors, Inc.  Construction Manager – PB Americas, Inc.  Designer – Hardesty & Hanover, LLP  Owner – SCDOT  FHWA – 100% oversight project

April 28, 2010 Roller System

April 28, 2010

Old Swing Span being removed

New Swing Span ready for placement

New Swing Span being placed

 April 29, 2010 cracks in the webs of steel plate girders were found by the District 4 Bridge Inspection Team at I-77 NB and SB over S in Chester County  Bridge Maintenance Office verified the severity of this condition, which did not exist as of the previous normal inspections 2 years ago  It is believed that the primary causes for the cracked girders on I-77 are the following:  thin web plates (<1/2”), these were 3/8”  diaphragm and stiffener web plates were only welded to the web and top flange thus causing an inordinate amount of torsion to be carried more directly by the web 22 Weld No weld Diaphragm s offset due to skew

 Other factors contributing to the cracking were:  bridge skew  torsional fatigue and possible overall fatigue  possible overheating of the steel substrate due to multiple weld passes on the web to flange connection during fabrication  material mechanical properties (to be verified by testing)  construction loadings during I-77 construction could have reduced the fatigue life  Emergency Declaration was approved by SCDOT Secretary of Transportation Limehouse on May 3, 2010  met two qualified bridge contractors on site May 4, who were given information that required the contractors to bid on temporarily shoring and replacing both steel plate girder main spans  District 4 closed the ramps and overpass/S on May 5, 2010 and began work to improve the on and off ramps which were used for the detour  Bids were received on May 10, 2010 and an accelerated contract cost and schedule was negotiated on May 11, 2010 with the project low bidder, United Contractors 23

 Temporary shoring was installed beginning May 12, 2010 to allow traffic to continue using the bridges until closed for work 24 Temporary Shoring

Bridges were closed on June 7, 2010 and demolition of the main spans began. New girders were set beginning June 11,

Deck pours started midweek of June 14,

 Both spans were completed by June 28, 2010  Bridge Maintenance performed a project final inspection on June 28, 2010 Bridges were opened 2 days later on June 30,

 Ramps were reopened for normal use on July 23,

 Interstate Rehabilitation of I-385, approximately 15 miles, with 10” of high strength concrete  Raising of 6 overpass bridges  Bridge replacement of fly-over bridge that connects I-26 westbound to I-385 northbound  Shoulder widening with roller compacted concrete  I-385 northbound detoured; construction duration condensed from 3 years to 7 ½ months

 Northbound Detour  Relatively low ADT (17,600 to 21,900) within project corridor  Existing pavement width (32’) insufficient to stage or run head to head traffic  Parallel interstate in close proximity for detour traffic (15 mi./15 min.)  Good network of regional primary routes for local traffic  Detour Benefits  Safety increased by separating motorists from construction operations  Construction operations streamlined with closure; allowed pavement of full width PCC up to one mile per day (weather permitting)  Estimated $34.6 million in savings compared to traditional construction staging over multiple years

 Affected businesses, elected officials, and state trucking association contacted months prior to closure  Brochures and maps were distributed at local Rest Areas and project website was established with detour information  Contractor was required to hold Public Information Meeting prior to closure  Pre-construction and mid-construction partnering meetings  Contract had $25,000 daily incentives not to exceed $750,000 and $50,000 daily liquidated damages with no cap beginning August 16, 2010

 Bridge jackings were let in separate contract and completed prior to I-385 northbound closure  Project let five months in advance of closure date for prep work and material fabrication (fly-over bridge superstructure)  All excavation was converted to Site Excavation  Concrete paving machine guided by laser total station with an automatic dowel inserter  Leica Scan Station 2 survey scanner used to verify cross- slope correction