5S Workplace Ancillary Testing Inventory storage BB120 April 2009.

Slides:



Advertisements
Similar presentations
Purchasing and Inventory
Advertisements

Understanding 5S.
5S Workplace CI Department, Supply Cabinet March 2009.
5S training Office Environments.
LEAN INITIATIVES SUPPLY CHAIN MANAGEMENT
CHUGACHMIUT Tatitlek Clinic 5S+2 March 8-10, 2010.
5S BASIC TRAINING What is 5S and why do we want to do it?
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
OFFICE PROCEDURES. The word OFFICE, from the Latin word, officium, derived from opus which refers to “ work ” or “ service ” and facere meaning to do.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Linen System Edition Presented by: Barbara Williams June 11, 2007.
Building Human Resource Management Skills National Food Service Management Institute 1 Strategies for an Effective Work Environment Objectives At the completion.
Introduction to 6S.
5S A guide to understanding and developing 5S in the workplace.
Developing a Records & Information Retention & Disposition Program:
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Lean Training 5S. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
INVENTORY TRAINING MODULE 1
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
CONTINUOUS IMPROVEMENT PROGRAM
SAND Number: P Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department.
Reduce your costs Without reducing your effectiveness.
 There are five primary 5S phases: 1.Sort. 2.Straighten. 3.Shine. 4.Standardize. 5.Sustain. The 5 S's Kamalnathan, MIM.
GLUCOSE TESTING USING THE TRUEtrack GLUCOMETER
How to sustain Quality Improvement activities over time
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
OPERATING ROOM DASHBOARD Virginia Chard, RN, BSN, CNOR
A Workplace Organization Method
Aluminum Die Casting Visual Workplace (6S).
Visual Management Quick Review
Cost Policy Training Sponsored Project Training Program April 30, 2012 Beverly Blakeney & Jennifer Gagnon April 30, 2012Sponsored Project Training Program1.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
“If you can organize one room and one life you can learn to organize many rooms and many lives” Home Maintenance.
“Without the Cost of Waste …”
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
5S at New Belgium Brewing Company
Manufacturing Systems
FINANCIAL STEWARDSHIP INSTITUTE Capstone Presentation April 16, 2013 Angela Mercer Deb Pack Carmen Peters Sara Stubbs.
From Concept to Reality. F & B Farms and Nursery Kaizen event June 2011 Potting Line Process Before conditions: Inconsistent work – particularly on machine.
S UPPORT S ERVICES D EPARTMENT - L EADERSHIP T EAMS Involving Everyone in continuous improvement! Session 3 – January14 th, 2011.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
1 Lean Office - 5S and Visual Controls
State of Georgia Release Management Training
6 S System The Visual Workplace Directorate of Training and Education
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
RENO DeCA 2000 ALA Vendor Stocking Committees. What is Vendor Stocking Retail (Outside Gate) Commissary Answer: Product Which Vendor’s Pay to Stock in.
Tips on Packing and Moving Into a New Home
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
Standard Operating Procedure
Measuring Production & Benchmarking
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
Standard Operating Procedure
LEAN ORGANIZATION SUMMARY
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
CHME 590/690 Jett Hall Lab Researcher Commissioning
5S TRAINING.
Continuous Improvement Coordinator
5S workplace organisation
Future State Improve Kaizen Facilitation.
Kanban for Inventory Management
Lean Training 5S. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
SHOP ORGANIZATION & SAFETY
July 2019 Safety Focus Extra
5 functions of the 5S Methodology Example of the 5s Methodology
CHemical Inventory Management and
Presentation transcript:

5S Workplace Ancillary Testing Inventory storage BB120 April 2009

Objectives Going through all the supplies, materials, etc., in the cabinet and work area and keeping only essential items. Everything else is stored or discarded. Focuses on efficiency. For every thing there should be a place and every thing should be in its place. Standardized work practices or operating in a consistent and standardized fashion. Everyone knows exactly what his or her responsibilities are to keep above 3S's… Systematic Cleaning or the need to keep the workplace clean as well as neat. Everything is restored to its place. Sustaining the discipline: Refers to maintaining and reviewing standards. Once the previous 4S's have been established, they become the new way to operate.

Site Selection Criteria: – Establish the Laboratory as a LSS leader that can coach/mentor/teach by doing. – Activity must have some level of financial impact. – Project size will allow for a quick ROI. – Use a common skill set that can easily bridge to other applications and projects. – Select a shared resource supporting multiple staff. – Area will allow ATC to be the sustaining owner. “ATC Supply Closet”

Current State View from doorway entrance into room

Current State It is difficult to obtain items and see the inventory on hand

Planning the 5S event

Future State View from doorway entering room Created a training supply shelf Organized shelves to function as a CBOC supply cabinet

Future State Storage behind door now isolated to one function Inventory signal “kanban” version 1 created to signal low volume or expiration of product Functional space created for CBOC transport

Expense Time 8 hrs Cost of labor Supplies – Organizers obtained from SPD – Label maker and tape – Re-purposed existing carts StaffRateHoursTotal 2$388$608

Results Completed project in ≈8hrs (planning time included) Items removed? – Diabetic cart, glucose meter set up boxes, bone marrow slides—still in progress, Moved administrative supplies to admin side, unpacked packing supplies for transparency and organization Organization achieved? – A search for 5 CBOC requested items: Unorganized supply closetaverage 25 min Approx 5 minutes to each area of main lab to fill order requesting items from all departments 5S supply closetaverage 5min 20 min advantage per visit

Results Inventory made functional – (In progress, measuring inventory usage, waste and distribution to CBOC sites) – Cost of inventory--Goal: To accurately determine the distribution of lab supplies to CBOC sites from the Mpls VA (TBD month of June—waste monitoring report and Misc. supplies budget allocation) Room layout – reduced motion– no longer need to go to 5 departments to obtain lab items for CBOCs Developed a transferable “5S” skill set to spread to CBOC sites

Lessons Learned Pre-planning: The pre-plan allowed the owner of the project and I to commit to a functional space in a timely manner. Since this 5S involved moving heavy items such as a refrigerator & wiring, removing casing & painting which needed to be coordinated across services, the commitment to the pre-plan was our commitment to the change. Task organization: Once the event was underway, some new ideas surfaced. The commitment to the pre-plan allowed us to focus on the space as a functional supply closet.

Lessons Learned Tools that enabled functional inventory space: I utilized an affinity diagram to come to a conclusion about the storage of bone marrow slides. Based on accreditation requirements and storage space, a disposal plan was implemented and the results are TBD. Sometimes, a problem is beyond the scope of the 5S event and requires additional time to proceed with the process. The 5S event can still proceed as planned as long as problem is identified and a process is implemented. Change is difficult: Metrics enabled us to answer the question: “How is this space most functional?”

Results to sustain and spread The results from this 5S will sustain with the posted “Future State” pictures on each cabinet. The 5S is intended to spread to other areas beginning in June Two LEADS participants will help with the next 5S event, then each LEADS participant will lead a 5S event to present as a project.

Pictures to sustain event Pictures placed of 5S shelves posted on shelf to sustain event

Questions?